Вы находитесь на странице: 1из 1

A AS-BUILT B.S KANI KKR/RA NRK/NK 11.09.

14

REV. No. AMENDMENTS DRAWN CHECKED APPRD DATE

CONTRACTOR REVISION

KOC APPROVALS
DESIGNATION - GROUP / TEAM NAME SIGNATURE DATE

P.O.Box 46551, Fahaheel-64016, Kuwait.

DRAWN MANEESH DESIGNED CHECKED KKR/RA

APPROVED NRK/NK DATE SCALE NTS


GL. EL. +87.670 03.09.2013

NOTES: PROJECT TITLE:

1. ALL DIMENSIONS ARE IN mm, ELEVATIONS (C.O.P) AND CO-ORDINATES ARE IN METER.
LEGEND
2. HPFS EL. +0.000, DATUM GR.EL. +167.5(MACD).

3. PAINTING SYSTEM FOR ABOVE GROUND PIPING FOLLOWED AS PER KOC-P-001, REV-3, SYSTEM A1-1. EXISTING CONT. FIELD WELD PART SHOP FIELD SOCKET SCREWED COMPN UNION PIPE
DRAWING TITLE:
LINE LINE JOINT NUM. NUM. WELD WELD WELD JOINT JOINT JOINT SUPPORT
4. ALL MATERIALS IS AS PER REQUIREMENT OF NACE MR 0175 / ISO 15156.
5. ALL NDT REQUIREMENTS AS PER TABLE-3 OF APPENDIX-1 OF KOC STANDARD KOC-MP-010.

LINE DATA REFERENCE DRAWING

DESIGN PRESSURE psig 385 PAINT SYSTEM STRESS RELIEF INSULATION RADIOGRAPHY % TEST PRESSURE psig 577.5 PIPING CLASS P&ID GC04-12050692-D-P-1404
PROJ. No. DRAWING NUMBER
DESIGN TEMP. °F NOTE-3 - TEST MEDIUM Q35B PIPING PLAN GC04-12050692-D-M-2402
250° TYP THK. NOTE-5 WATER
CONTRACTOR DRG. No. REV. KOC DRG. No. REV.
OPERATING PRESSURE psig 300 TRACING STRESS ANALYSIS - - MPI/DPI % FOR FILLET/SOCKET CLEANING CLASS - OTHER TEST - EF/1866 -
OPERATING TEMP. °F 120°
- -
NOTE-5 WELD SPEC. - - - SHEET 01 OF 01 A SHEET - OF - -
A3

Вам также может понравиться