BATHYMETRY SURVEY PROCEDURE

6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 1 of 37
CONTRACT No. 4600009769

REVISION LIST
Revision Status Revision Status Revision Status
Page Page Page
0 1 2 3 4 5 6 0 1 2 3 4 5 6 0 1 2 3 4 5 6
0 X 42 84
1 X 43 85
2 X 44 86
3 X X 45 87
4 X X 46 88
5 X X 47 89
6 X X 48 90
7 X X 49 91
8 X X 50 92
9 X X 51 93
10 X X 52 94
11 X X 53 95
12 X X 54 96
13 55 97
14 56 98
15 57 99
16 58 100
17 59 101
18 60 102
19 61 103
20 62 104
21 63 105
22 64 106
23 65 107
24 66 108
25 67 109
26 68 110
27 69 111
28 70 112
29 71 113
30 72 114
31 73 115
32 74 116
33 75 117
34 76 118
35 77 119
36 78 120
37 79 121
38 80 122
39 81 123
40 82 124
41 83 125
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 2 of 37
CONTRACT No. 4600009769

CONTENTS

1. PURPOSE ............................................................................................ 3
2. SCOPE ................................................................................................. 3
3. NOTE AND ABBREVIATIONS................................................................. 3
4. REFERENCES ........................................................................................ 4
5. SAFETY ................................................................................................ 4
5.1. GENERAL ........................................................................................ 4
5.2. RISK ASSESSMENT ............................................................................. 4
5.3. EMERGENCY EVACUATION PROCEDURE.................................................... 5
5.4. WORK PERMITS ................................................................................ 5
6. RESOURCES ......................................................................................... 5
6.1. LIST OF PERSONNEL, EQUIPMENT AND MARINE SPREAD MOBILIZED ................ 5
6.2. MARINE SPREAD ............................................................................... 6
6.3. EQUIPMENT / TOOLS ......................................................................... 6
7. BATHYMETRIC AND TOPO SURVEY SEQUENCE ..................................... 6
7.1. STAGE PREPARATION.......................................................................... 7
7.2. STAGE DATA COLLECTION ................................................................... 12
7.3. STAGE DATA PROCESSING ................................................................... 15
7.4. STAGE FINAL REPORT ........................................................................ 15
8. ATTACHMENT .................................................................................... 16
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 3 of 37
CONTRACT No. 4600009769

1. PURPOSE
The survey service was required to determine the topography of the river around the work
1
site. These maps are used to determine the condition and around existing pipeline
between protection pile the river at the location of jobs. The survey was conducted by
means of echo sounder equipped with RTK-DGPS positioning system.

2. SCOPE
The scope of work of this procedure is covering the bathymetric and topo survey to obtain
topo and seabed profile in working area.
This location need to be surveyed to have details of water depth information and river
contour depth. The work shall be carried out utilizing echo sounder, RTK DGPS
positioning system and Total Station.
The objectives of this survey are as follows:
 To identify and to mapping river contour depth around pipeline and existing protection
pile area
 To map river contour depth at the survey area in a scale of 1:1000 at the survey area
of 100m x100m before the installation sheet pile and protection pile.

3. NOTE AND ABBREVIATIONS


The following notes and abbreviations apply in this report and attached drawings :
Words in UPPER CASE indicate specific meaning as defined below.
COMPANY TOTAL E&P INDONESIE
CONTRACTOR PT ONASIS Indonesia
RCB River Crossing and River Banks
HSE Health, Safety, Environment
WORK The scope of work as describe in the CONTRACT
ERP Emergency Responses Plane
RTK Real Time Kinematic
DGPS Differential Global Positioning System
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 4 of 37
CONTRACT No. 4600009769

4. REFERENCES

1 1. 9769-22-TNF-PWK-3-001-P : Procedure for Writing Document


2. 9769-22-TNF-PWK-3-002-P : Control of Quality Record Procedure
3. 9769-22-TNF-PWK-3-003-P : Planning & Scheduling Control Procedure
4. 9769-22-TNF-PWK-3-004-P : Project Execution Plan
5. 9769-22-TNF-PWK-3-005-P : Design Control Procedure
6. 9769-28-TNF-PWK-3-001-P : Job Risk Assessment
7. 9769-28-TNF-PWK-3-002-P : Emergency Responses Plan
8. 9769-28-TNF-PWK-3-003-P : HSE Procedure
9. 9769-28-TNF-PWK-3-004-P : Non-Conformance, Accident/Incident, Reporting and
Investigation Procedure
10. 9769-22-TNF-PWK-3-008-P : Mechanical Work Method Statement
11. 9769-22-TNF-PWK-3-007-P : Civil Work Method Statement
12. 9769-22-TNF-PWK-3-015-P : Procecedure Control of Nonconformance Product
13. GS-GEO 201 : Offshore Geopysycal Survey
14. GS-GEO 301 : Offshore Surfrace Positioning
15. GS-GEO 304 : RTK Operations

5. SAFETY
As a principal in the survey activity, CONTRACTOR will be conducting a safety induction
for all personal coming on board for this activity. The CONTRACTOR’s HSE Coordinator
and his representative will perform briefing to everyone involved to introduce the important
of safe practices and create the awareness that they are indeed working within an existing
live pipeline at their working area.
5.1. General
To minimize the risk of accidents during the work, safety precautions and risk
assessment has been prepared as guidelines for all personal involved. Safety
inductions shall be organized upon mobilization of all personnel on site. The Risk
Assessment shall be clearly explained and existing facilities.
5.2. Risk Assessment
A specific risk assessment is refer to Job Risk Assessment to this procedure and will
discussed, reviewed and approved by Company as necessary to request the permit to
work.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 5 of 37
CONTRACT No. 4600009769

5.3. Emergency Evacuation Procedure


The CONTRACTOR ERP is the approved document: 9769-28-TNF-PWK-3-002-P
Emergency Responses Plan.

5.4. Work Permits


No works can be carried out without any valid work permits. The works shall not be
1
started before the work permit is opened. CONTRACTOR will prepare the work
permits in accordance to Company Work Permit procedure. All work permits shall
comply with COMPANY Work Permit Regulation.
Work Permits shall describe all the activities to be carried out, complete with require
documents such as drawings of work locations, Risk Assessment, etc. Before issuing
of work Permit to COMPANY, the Work Permit has to be discussed with safety officer
and safety man who are in charge during the work execution. The purpose of this
discussion is to allow the safety man to prepare all necessary safety preventive action
for the works. Before opening the Work Permit, Contractor / Company shall check that
all procedurals required have been received.

6. RESOURCES
6.1. List of Personnel, Equipment and Marine Spread Mobilized
TITLE QUANTITY
Party Chief Survey 1
Supervisor 1
PC / Hydrographic Surveyor 1
Survey Engineer 1
Data Processor 1
Tide Gauge Observer / GPS Ref Sta. 1
Helpers (Local Laborer) 1
Safetyman 1
Medic 1
Sea Truck crew 2
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 6 of 37
CONTRACT No. 4600009769

6.2. Marine Spread

MARINE SPREAD QUANTITY

Sea Truck 1 unit

6.3. Equipment / Tools


1
EQUIPMENTS / TOOLS MODEL TYPE Accuracy QUANTITY

RTK DGPS Trimble 5700 Cm 1+1

PC n/a 1

Software Trimble HYDRO Pro 2.4 n/a 1

SAILCOMP KVH
fluxgate
Heading Azimuth1000 1
compass

Single Beam Echo MKII Dual dm


Odom 1
sounder Frequencies
Echo Sounder Bar n/a
- - 1
Check Plate
Tide Gauge / Tide Pole - Sokkia cm 1
Heave compensator SMC IMU-008-30 cm 1
Total Station Sokkia CX105 cm 1

7. BATHYMETRIC AND TOPO SURVEY SEQUENCE


In general, the implementation of the survey can be divided in for stage :
1. Preparation
2. Data Collection
3. Data Processing
4. Final Report
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 7 of 37
CONTRACT No. 4600009769

7.1. Preparation
a. Work Map / Map Distribution Benchmark ( BM )
Benchmark will be used are BM RC-52 and BM LT-02 (see attachment 8.1)
Incase of BM is not avaible any more contractor will establish new BM generate
from BM LT-02.
b. Data Preparation
 Survey Line
The area to be surveyed is within a grid area of 100m x 100m location of the
sheet pile and protection pile area that installed. The Bathymetric survey and will
be carried out along the following designed survey lines. The main lines will be
run across the river and along around pipeline area with an interval of 2m and
the cross lines will be run perpendicular to the main line with an interval of 15m.

Navigation & echo sounder data will be logged continuously and fixes will be run
every 5m. The bathymetric survey will be run in one pass.
Topographic survey line will be run overlap 10m with bathymetric survey and
ensured all working area for sheet pile has inside survey area.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 8 of 37
CONTRACT No. 4600009769

List line bathymetry and topo survey at TNF 565 & 563.

1 No of Total
No Description Direction Length Interval
Line Length

Main Lines Across the


1 100m 2m 50 5000m
Bathy river

2 Along the
Cross Lines 100m 15m 6 600m
river
Main Lines Across the
3 20m 2m 50 1000m
Topo river

Topo line
overlap with line
bathymetric

100mtr length

Bathymetric and topo Line at RCB-TNF 565


BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 9 of 37
CONTRACT No. 4600009769

No of Total
No Description Direction Length Interval
Line Length

Main Lines Across the


1 150m 2m 50 75000m
Bathy river

2 Along the
Cross Lines 150m 15m 7 1050m
river
Main Lines Across the
3 30m 2m 50 3000m
Topo river

Topo line
overlap line
bathymetric

150mtr length

Bathymetric and topo Line at RCB-TNF 563


BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 10 of 37
CONTRACT No. 4600009769

 Survey Parameters
All position and navigation control for the project will be based on the
following grid projection, spheroid and geodetic parameters:
Geodetic Parameters
Datum P.2EXC_T9 (SAMBOJA)
Spheroid BESSEL 1841
Semi-Major Axis (a) 6377397.15500000m
Semi-Minor Axis (b) 6356078.962899996
Inverse Flattening (1/f) 299.1528139448
Projection Parameters
Grid projection Universal Transverse Mercator
(UTM)
1
Central Meridian (CM) 117° E (Zone 50S)
Origin of Latitude 0.00° N
Hemisphere South
False Easting 500 000 m
False Northing 10000000.0 m
Scale Factor on CM 0.9996
Units Meters
Geoid Model EGM ‘08
Datum Shift Parameters from WGS 84 to Bessel 1841
dX = plus 404.78 m
dY = minus 685.68 m
dZ = minus 45.47 m

Note: One of the nearest Benchmark of TOTAL E&P INDONESIE near to the
survey location will be utilized as a reference station if RTK DGPS will be
used as a positioning system. The coordinates will be verified and approved
by Client Representative prior to the commencement of work.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 11 of 37
CONTRACT No. 4600009769

 Equipment Preparation
The preparation to be carried out is:
 Hardware installation for the RTK GPS Base unit at the Nearest Control
Point (Approved by Company)
 Hardware installation onboard the survey vessel include some or all of
the following :
 Installation of a data acquisition computer and software
 Installation of navigation & echo sounder data acquisition computer
 Installation and interfacing of a RTK DGPS Rover receiver on the
vessel
 Installation and interfacing of a heading sensor on the vessel
 Installation of transducer and cables
 Installation and interfacing of a single beam echo sounder
 Measure all offsets, including antenna offsets, etc., to an agreed
datum point on the vessel. The vessel overall dimensions will be
entered into the navigation computer and related to the same
datum point.
 Complete Hazard Identification and Risk Assessment
 Hold pre-job meeting, safety induction and briefing
 Calibration and Equipment Tests
Prior to the commencement of work, checks and calibrations will be
performed and consist with the following :
 Echo sounder sensor calibration using bar check plate for verify
and calibrate depth every 1metre
1
 Tuning, adjusting and wet test of all analogue systems
 RTK DGPS and Navigation system verifications at the known point
reference approved by company
 Compass heading verify checks
 Assessment of the functioning of the on-line navigation computer
and echo sounder data logging system
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 12 of 37
CONTRACT No. 4600009769

RTK DGPS Verification


The RTK DGPS system onboard the vessel was verified according to the
Surveys standard operating procedure. Known Point will be used for
verification purpose shall be approved by TEPI.
Heading sensor correction and alignment verification
The misalignment of the heading sensors onboard the vessel was
corrected and verified according to the surveys standard operating
procedure.
All calibrations, checks and system verifications shall be carried out in
accordance to manufacturer’s specifications and requirements.

7.2. Data Collection


All surveys will be undertaken from the survey vessel assigned.
The RTK DGPS positioning will be checked or verified at the known point at the
mobilization port or on location.
All navigation will be achieved and logged using a Hydro Pro 2.4 survey navigation
package. Required survey lines will be input to this system and displayed for the.
Data acquisition, Geodetic Parameters, and other input to the system will be
checked at mobilization individually by both the Party Chief and the surveyors.

Bathymetric survey data will be carried out using a single beam Odom MKII Echo
Sounder dual frequency. The transducers will be mounted on an over-the-side pole.
Soundings output data will be recorded on the Hydro Pro 2.4 Navigation system.
During the running line and recording data acquisition phases and if the weather and
survey area conditions permitted, the following systems are run in simultaneous
(single pass) mode over the proposed survey lines as specified above.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 13 of 37
CONTRACT No. 4600009769

Single Beam Echo sounder dual frequency


The echo sounder data will be logged in digital formats with Hydro Pro 2.4
navigation. Details of the data acquisition will be recorded in the navigation line log.
1
Fixes will be taken every 5m interval.
Echo sounder digital data will be recorded in the TXT format and annotated with
position, headings, depth and fix marks.
The accuracy of the sounding position will be of the order of under 0.2m within the
designated areas.

Figure 2: Transducer bracket with side mounted

The survey will be carried out along the designed survey lines centered at the sheet
pile and protection pile location to mapping the seabed of area.

Bathymetric data acquisition will be reduced to the Chart Datum based on the tide
gauge / tide Pole readings provided during survey. The tide gauge height will be tied
to the nearest vertical Reference point to be able to compute the Chart Datum.
BM for vertical elevation reference using company to compute the height of the tide
gauge relatively to the nearest reference point at location survey.
The reference point to be used will be verified or validated by the company prior to
the commencement of work.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 14 of 37
CONTRACT No. 4600009769

Positioning and Navigation System


Positioning and navigation were provided by the RTK DGPS system. The RTK
DGPS positioning will be checked or verified at the known prior to the mobilization.
The vessel will be run with a ‘run-in’ approach distance as far as possible, prior to
the start of main line, to get the vessel on track.
All navigation were achieved and logged using a Hydro Pro 2.4 survey navigation
package. Required survey lines were entered to this system Survey data, Geodetic
1
Parameters, and other input to the system were checked at mobilization individually
by both the Party Chief and the surveyors.
Speed was limited to 3 knots or lowest for running line

Echo sounder data output


Bathymetric data was carried out using a single beam Odom MKII Echo Sounder
dual frequency. The transducer was mounted on an over-the-side pole.
Soundings were recorded on the Hydro Pro 2.4 Navigation system. Fixing were sent
to the echo sounder at the interval of 5mtr, the depth and position recorded by
hydroPro 2.4 software every second.
Bar check was used to verify,calibrate echo sounder data.

Tide corrections
All depths were reduced to reading tide pole water surface.
Sample of mark 3M on site provided by company and setup 3M tide pole reading

3mtr pole
reading
setup
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 15 of 37
CONTRACT No. 4600009769

7.3. Data Processing


All final data processing will used software: Hydro Pro 2.4, AutoCAD, Terramodel.
Final product of bathymetric survey results in ACAD drawing files will be provided.
The processing tools will also provide on the survey vessel for preliminary
interpretation and site assessment. The preliminary report with the river contour
depth, after survey will be provided in field if required.

7.4. Final Report


The final report will consist with the following:
1. Scope of work & Project Configuration
2. Geodetic Parameters
3. Horizontal & Vertical Control
4. Mobilization/demobilization
5. Tests, Calibration, Settings, List of Equipment and Personnel
6. Survey Operations
7. Data survey recording & Processing Methods
8. Survey Logs, Diagrams, Station Descriptions, Offsets, etc.
9. Survey Results, including :
• Bathymetric charts,
• General site features,
• River contour depth at survey location before sheet pile and protection pile

1 installation
10. Summary & Recommendations.
Final report will be consisted with the following charts :
 Bathymetric and topo with 2m interval
 Seabed features identification determine the condition around existing pipeline
between protection pile and river contour depth at the location of jobs
 Long section of bathymetric survey.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 16 of 37
CONTRACT No. 4600009769

8. ATTACHMENT
 Bench mark (by company)
 Equipment
 Personnel CV
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 17 of 37
CONTRACT No. 4600009769

8.1. Bench Mark


BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 18 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 19 of 37
CONTRACT No. 4600009769

8.2. Equipment
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 20 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 21 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 22 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 23 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 24 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 25 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 26 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 27 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 28 of 37
CONTRACT No. 4600009769

8.3. Personnel and CV


BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 29 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 30 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 31 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 32 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 33 of 37
CONTRACT No. 4600009769

DAFTAR RIWAYAT HIDUP

Data Pribadi
Nama : Ottovianus
Jenis Kelamin : Laki – Laki
Tempat, Tanggal Lahir : Pangala’,31 oktober 1988,Toraja
Kewarganegaraan : Indonesia
Status Perkawinan : Belum Menikah
Tinggi, Berat Badan : 164 cm, 68 kg
Kesehatan : Sangat Baik
Agama : Kristen Protestan
Alamat Lengkap : Jl.A.Yani Gang Nusa Indah (Handil, Kalimantan Timur)
Nomor HP : 082152133018
E-mail : Ottovianus88@Ymail.Com

Pendidikan Formal :
1996 – 2002 : SD 12 Impres Pangala’ Toraja
2002 – 2004 : SMP 1 Rindinggallo, Toraja
2004 – 2007 : SMK 1 Tagari Rantepao, Toraja
Non Formal
2007 – 2008 : BLKI (Balai Latihan Kerja Industri) Makassar (Gambar
Rencana)
2008 – 2009 : ALIAH (Autocad 2 Dimensi/ 3 Dimensi)
2009 – 2010 : Training Sea Survival / Training Lifting Operation and
Rigging

Pengalaman Kerja
2010 – 2012 : PT.Meindo Elang Indah, Project RCB Jabatan (Credding Machine
Operator)
2012 – 2014 : PT.Meindo Elang Indah, Project Pipeline 14” Replacement (23KM)
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 34 of 37
CONTRACT No. 4600009769

Jabatan Terakhir, Asistance Surveyor


2014 : PT Navigator Nusantara, Asistance Surveyor di PT Supraco project
RCB III Total

PT Geodata Pratama , Golder , asistance surveyor project borhole


postioning at senipah process

Uraian Singkat Pekerjaan:

 Centring dengan tripod


 Stake out
 Situasi dengan total station Sokkia CX105, FX103
 Leveling
 Anchor job
 Monitoring laying pipe 14” dari crane barge
 Operator Echosounder Echotrac MKII
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 35 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 36 of 37
CONTRACT No. 4600009769