6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 1 of 37
CONTRACT No. 4600009769
REVISION LIST
Revision Status Revision Status Revision Status
Page Page Page
0 1 2 3 4 5 6 0 1 2 3 4 5 6 0 1 2 3 4 5 6
0 X 42 84
1 X 43 85
2 X 44 86
3 X X 45 87
4 X X 46 88
5 X X 47 89
6 X X 48 90
7 X X 49 91
8 X X 50 92
9 X X 51 93
10 X X 52 94
11 X X 53 95
12 X X 54 96
13 55 97
14 56 98
15 57 99
16 58 100
17 59 101
18 60 102
19 61 103
20 62 104
21 63 105
22 64 106
23 65 107
24 66 108
25 67 109
26 68 110
27 69 111
28 70 112
29 71 113
30 72 114
31 73 115
32 74 116
33 75 117
34 76 118
35 77 119
36 78 120
37 79 121
38 80 122
39 81 123
40 82 124
41 83 125
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 2 of 37
CONTRACT No. 4600009769
CONTENTS
1. PURPOSE ............................................................................................ 3
2. SCOPE ................................................................................................. 3
3. NOTE AND ABBREVIATIONS................................................................. 3
4. REFERENCES ........................................................................................ 4
5. SAFETY ................................................................................................ 4
5.1. GENERAL ........................................................................................ 4
5.2. RISK ASSESSMENT ............................................................................. 4
5.3. EMERGENCY EVACUATION PROCEDURE.................................................... 5
5.4. WORK PERMITS ................................................................................ 5
6. RESOURCES ......................................................................................... 5
6.1. LIST OF PERSONNEL, EQUIPMENT AND MARINE SPREAD MOBILIZED ................ 5
6.2. MARINE SPREAD ............................................................................... 6
6.3. EQUIPMENT / TOOLS ......................................................................... 6
7. BATHYMETRIC AND TOPO SURVEY SEQUENCE ..................................... 6
7.1. STAGE PREPARATION.......................................................................... 7
7.2. STAGE DATA COLLECTION ................................................................... 12
7.3. STAGE DATA PROCESSING ................................................................... 15
7.4. STAGE FINAL REPORT ........................................................................ 15
8. ATTACHMENT .................................................................................... 16
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 3 of 37
CONTRACT No. 4600009769
1. PURPOSE
The survey service was required to determine the topography of the river around the work
1
site. These maps are used to determine the condition and around existing pipeline
between protection pile the river at the location of jobs. The survey was conducted by
means of echo sounder equipped with RTK-DGPS positioning system.
2. SCOPE
The scope of work of this procedure is covering the bathymetric and topo survey to obtain
topo and seabed profile in working area.
This location need to be surveyed to have details of water depth information and river
contour depth. The work shall be carried out utilizing echo sounder, RTK DGPS
positioning system and Total Station.
The objectives of this survey are as follows:
To identify and to mapping river contour depth around pipeline and existing protection
pile area
To map river contour depth at the survey area in a scale of 1:1000 at the survey area
of 100m x100m before the installation sheet pile and protection pile.
4. REFERENCES
5. SAFETY
As a principal in the survey activity, CONTRACTOR will be conducting a safety induction
for all personal coming on board for this activity. The CONTRACTOR’s HSE Coordinator
and his representative will perform briefing to everyone involved to introduce the important
of safe practices and create the awareness that they are indeed working within an existing
live pipeline at their working area.
5.1. General
To minimize the risk of accidents during the work, safety precautions and risk
assessment has been prepared as guidelines for all personal involved. Safety
inductions shall be organized upon mobilization of all personnel on site. The Risk
Assessment shall be clearly explained and existing facilities.
5.2. Risk Assessment
A specific risk assessment is refer to Job Risk Assessment to this procedure and will
discussed, reviewed and approved by Company as necessary to request the permit to
work.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 5 of 37
CONTRACT No. 4600009769
6. RESOURCES
6.1. List of Personnel, Equipment and Marine Spread Mobilized
TITLE QUANTITY
Party Chief Survey 1
Supervisor 1
PC / Hydrographic Surveyor 1
Survey Engineer 1
Data Processor 1
Tide Gauge Observer / GPS Ref Sta. 1
Helpers (Local Laborer) 1
Safetyman 1
Medic 1
Sea Truck crew 2
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 6 of 37
CONTRACT No. 4600009769
PC n/a 1
SAILCOMP KVH
fluxgate
Heading Azimuth1000 1
compass
7.1. Preparation
a. Work Map / Map Distribution Benchmark ( BM )
Benchmark will be used are BM RC-52 and BM LT-02 (see attachment 8.1)
Incase of BM is not avaible any more contractor will establish new BM generate
from BM LT-02.
b. Data Preparation
Survey Line
The area to be surveyed is within a grid area of 100m x 100m location of the
sheet pile and protection pile area that installed. The Bathymetric survey and will
be carried out along the following designed survey lines. The main lines will be
run across the river and along around pipeline area with an interval of 2m and
the cross lines will be run perpendicular to the main line with an interval of 15m.
Navigation & echo sounder data will be logged continuously and fixes will be run
every 5m. The bathymetric survey will be run in one pass.
Topographic survey line will be run overlap 10m with bathymetric survey and
ensured all working area for sheet pile has inside survey area.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 8 of 37
CONTRACT No. 4600009769
List line bathymetry and topo survey at TNF 565 & 563.
1 No of Total
No Description Direction Length Interval
Line Length
2 Along the
Cross Lines 100m 15m 6 600m
river
Main Lines Across the
3 20m 2m 50 1000m
Topo river
Topo line
overlap with line
bathymetric
100mtr length
No of Total
No Description Direction Length Interval
Line Length
2 Along the
Cross Lines 150m 15m 7 1050m
river
Main Lines Across the
3 30m 2m 50 3000m
Topo river
Topo line
overlap line
bathymetric
150mtr length
Survey Parameters
All position and navigation control for the project will be based on the
following grid projection, spheroid and geodetic parameters:
Geodetic Parameters
Datum P.2EXC_T9 (SAMBOJA)
Spheroid BESSEL 1841
Semi-Major Axis (a) 6377397.15500000m
Semi-Minor Axis (b) 6356078.962899996
Inverse Flattening (1/f) 299.1528139448
Projection Parameters
Grid projection Universal Transverse Mercator
(UTM)
1
Central Meridian (CM) 117° E (Zone 50S)
Origin of Latitude 0.00° N
Hemisphere South
False Easting 500 000 m
False Northing 10000000.0 m
Scale Factor on CM 0.9996
Units Meters
Geoid Model EGM ‘08
Datum Shift Parameters from WGS 84 to Bessel 1841
dX = plus 404.78 m
dY = minus 685.68 m
dZ = minus 45.47 m
Note: One of the nearest Benchmark of TOTAL E&P INDONESIE near to the
survey location will be utilized as a reference station if RTK DGPS will be
used as a positioning system. The coordinates will be verified and approved
by Client Representative prior to the commencement of work.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 11 of 37
CONTRACT No. 4600009769
Equipment Preparation
The preparation to be carried out is:
Hardware installation for the RTK GPS Base unit at the Nearest Control
Point (Approved by Company)
Hardware installation onboard the survey vessel include some or all of
the following :
Installation of a data acquisition computer and software
Installation of navigation & echo sounder data acquisition computer
Installation and interfacing of a RTK DGPS Rover receiver on the
vessel
Installation and interfacing of a heading sensor on the vessel
Installation of transducer and cables
Installation and interfacing of a single beam echo sounder
Measure all offsets, including antenna offsets, etc., to an agreed
datum point on the vessel. The vessel overall dimensions will be
entered into the navigation computer and related to the same
datum point.
Complete Hazard Identification and Risk Assessment
Hold pre-job meeting, safety induction and briefing
Calibration and Equipment Tests
Prior to the commencement of work, checks and calibrations will be
performed and consist with the following :
Echo sounder sensor calibration using bar check plate for verify
and calibrate depth every 1metre
1
Tuning, adjusting and wet test of all analogue systems
RTK DGPS and Navigation system verifications at the known point
reference approved by company
Compass heading verify checks
Assessment of the functioning of the on-line navigation computer
and echo sounder data logging system
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 12 of 37
CONTRACT No. 4600009769
Bathymetric survey data will be carried out using a single beam Odom MKII Echo
Sounder dual frequency. The transducers will be mounted on an over-the-side pole.
Soundings output data will be recorded on the Hydro Pro 2.4 Navigation system.
During the running line and recording data acquisition phases and if the weather and
survey area conditions permitted, the following systems are run in simultaneous
(single pass) mode over the proposed survey lines as specified above.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 13 of 37
CONTRACT No. 4600009769
The survey will be carried out along the designed survey lines centered at the sheet
pile and protection pile location to mapping the seabed of area.
Bathymetric data acquisition will be reduced to the Chart Datum based on the tide
gauge / tide Pole readings provided during survey. The tide gauge height will be tied
to the nearest vertical Reference point to be able to compute the Chart Datum.
BM for vertical elevation reference using company to compute the height of the tide
gauge relatively to the nearest reference point at location survey.
The reference point to be used will be verified or validated by the company prior to
the commencement of work.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 14 of 37
CONTRACT No. 4600009769
Tide corrections
All depths were reduced to reading tide pole water surface.
Sample of mark 3M on site provided by company and setup 3M tide pole reading
3mtr pole
reading
setup
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 15 of 37
CONTRACT No. 4600009769
1 installation
10. Summary & Recommendations.
Final report will be consisted with the following charts :
Bathymetric and topo with 2m interval
Seabed features identification determine the condition around existing pipeline
between protection pile and river contour depth at the location of jobs
Long section of bathymetric survey.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 16 of 37
CONTRACT No. 4600009769
8. ATTACHMENT
Bench mark (by company)
Equipment
Personnel CV
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 17 of 37
CONTRACT No. 4600009769
8.2. Equipment
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 20 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 21 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 22 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 23 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 24 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 25 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 26 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 27 of 37
CONTRACT No. 4600009769
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 28 of 37
CONTRACT No. 4600009769
Data Pribadi
Nama : Ottovianus
Jenis Kelamin : Laki – Laki
Tempat, Tanggal Lahir : Pangala’,31 oktober 1988,Toraja
Kewarganegaraan : Indonesia
Status Perkawinan : Belum Menikah
Tinggi, Berat Badan : 164 cm, 68 kg
Kesehatan : Sangat Baik
Agama : Kristen Protestan
Alamat Lengkap : Jl.A.Yani Gang Nusa Indah (Handil, Kalimantan Timur)
Nomor HP : 082152133018
E-mail : Ottovianus88@Ymail.Com
Pendidikan Formal :
1996 – 2002 : SD 12 Impres Pangala’ Toraja
2002 – 2004 : SMP 1 Rindinggallo, Toraja
2004 – 2007 : SMK 1 Tagari Rantepao, Toraja
Non Formal
2007 – 2008 : BLKI (Balai Latihan Kerja Industri) Makassar (Gambar
Rencana)
2008 – 2009 : ALIAH (Autocad 2 Dimensi/ 3 Dimensi)
2009 – 2010 : Training Sea Survival / Training Lifting Operation and
Rigging
Pengalaman Kerja
2010 – 2012 : PT.Meindo Elang Indah, Project RCB Jabatan (Credding Machine
Operator)
2012 – 2014 : PT.Meindo Elang Indah, Project Pipeline 14” Replacement (23KM)
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 34 of 37
CONTRACT No. 4600009769