Академический Документы
Профессиональный Документы
Культура Документы
TOTAL SHEET : 45
B B
AS-BUILT
DATE : 2017/03/12
E.K.C
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
COVER SHEET
3 3 INDEX SHEET X
4 4 LEGEND SHHET X
B B
11 7 INCOMING WIRING DIAGRAM X
LEGEND & ABBREVIATION
12 8 INCOMING WIRING DIAGRAM X
B B
43 17 TERMINAL DIAGRAM X
LEGEND & ABBREVIATION
44 18 TERMINAL DIAGRAM X
AS-BUILT
DATE : 2017/03/12
E.K.C
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INDEX SHEET
A A
NO contact
Vaccum contactor Isolating terminal
with automatic Microswitch
( V.C ) opened / closed
thermal actuation
Plug
NOTES
NO contact with Switch NO/NC contact Miniator circuit-breaker
time delay opening operated by turning two-pole
Terminal
Switch , two-pole
NO contact with Three-phase transformer
NO contact Horn
time delay closing star-star connection
operated by turning
B B
NC contact with 1 2 3
N-position switch Single-phase transformer Protective circuiting of LEGEND & ABBREVIATION
time delay opening 3 position with two windings a coil through a diode
NC contact Electromechanical U
Protective circuiting of
opens and closes operating device Current transformer
a coil through a varistor
with delay relay coil
Electromechanical
Change-over contact Current measuring Discharge , three-pole
with break point (3-path)
operating device A instrument ammeter (surge arrester)
AS-BUILT
of a latching relay
DATE : 2017/03/12
E.K.C
Electromechanical
Pushbutton NO/NC contact Voltage measuring
operated by pushing
operating device of V instrument voltmeter
Earth switch
an interlock relay
Electromechanical
Limit switch NO/NC contact
operating device Fluorescent lamp
mechanically operated
with pick-up delay
C KEY PLAN C
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
LEGEND SHHET
A A
NOTES
B
INCOMING LEGEND & ABBREVIATION
B
WIRING DIAGRAM
AS-BUILT
DATE : 2017/03/12
E.K.C
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
11 21
23
21
S1.1 S3 S1.4
S21 12 22 -XS 8 -XS 13 -XS 15
24
22
A6 C6
21 13
A1 K1
22 14 SPARE 13
21
D16 B2 D2
-XS 2 -XS 4 -XS 7
B B
C7 A3 A8 D5 C8 A9 B11
AS-BUILT
11 23 31
33
41
43 53
51
63
61 21
-S1.1 -S1.2 -QS1.3 -QS1.4 -QS1.5 -QS1.6 -QS1.7 -QS1.8 -QS1.9 DATE : 2017/03/12
12 24 /19.2 32 C.B CLOSE 34 /17.2 42 /17.1 44 /16.2 54
C.B OPEN
52 /14.4 64
C.B OPEN
62 C.B OPEN 22 E.K.C
C.B OPEN C.B OPEN C.B CLOSE C.B CLOSE C.B CLOSE
D7 B3 B8 C5 D9 D8 C9 B9 B1
-XS 18 -XS 20 -XS 22 -XS 24 -XS 26 -XS 27 -XS 29 -XS 30 -XS 47
INTERNALY WIRED
C KEY PLAN C
R4
-S21,S22 : POSITION SWITCHES R3 12.03.2017 AS BUILT M.M H.M M.R
AUXILARY SWITCH FOR TEST & SERVICE POSITION 4NO/4NC
(CUT OFF MOTOR AFTER CHARGING) R2 15.03.2016 Issue For Approval M.M H.M M.R
NC CONTACT FOR TEST POSITION
R1 29.02.2016 Issue For Approval M.M H.M M.R
NO CONTACT FOR SERVICE POSITION -M1 : MOTOR OPERATING MECHANISM
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-K1 : ANTI-PUMPING CONTACTOR VENDOR :
-XS 31 -XS 34 -XS 36 -XS 38 -XS 40 -XS 42 -XS 44
ELECTRO KAVIR CO. (EKC)
D14 A15 C15 B15 A13 A14 C11 -Y9 : CLOSING SOLENOID
EKC DWG. NO. : 11039-0-MWD-01
CLIENT :
11
13
21
23
31
33
41
43 -S3 : POSITION SWITCHES
IRANIAN OFFSHORE OIL CO. (IOOC)
-QS1.11 -QS1.12 -QS1.13 -QS1.14 -QS1.15 -QS1.16 -QS1.17 (OPEN WHEN CLOSING
/13.1 12 SERVICE 14 /13.4 22 /18.2 24 TEST 32 /19.2 34 /18.1 42 /12.3 44
POSITION
SPRING CHARGED) EPC CONTRACTOR :
TEST TEST SERVICE POSITION SERVICE TEST SERVICE
POSITION POSITION POSITION POSITION POSITION POSITION
LOLEH PEY GOSTAR CO. (LPGC)
D13 C13 B14 D15 C16 B13 C14 D11 -Y1 : 1st SHUNT RELEASE
-XS 32 -XS 33 -XS 35 -XS 37 -XS 39 -XS 41 -XS 43 -XS 45
PROJECT TITLE :
-S6 : BREAKER TRIPING SIGNAL BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
-S7 : CUT-OUT SWITCH FOR
BREAKER TRIPPING SIGNAL DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
A A
230V AC FROM EXTERNAL
-XAC 1 2
1 3
NOTES
-FI
32/16A
aM 2 4
-XTAC
1 230V AC TO
NEXT CUBICLE
B B
2
LEGEND & ABBREVIATION
1 3 1 3 1 3
AS-BUILT
DATE : 2017/03/12
E.K.C
1 COM
-TH -MS1
Thermostat Microswitch NC NO
2
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
3 1
R2 15.03.2016 Issue For Approval M.M H.M M.R
-SLT -SLT
R1 29.02.2016 Issue For Approval M.M H.M M.R
/16.1 4 /16.1 2 -XH 1 -XH 3
R0 18.01.2016 Issue For Approval M.M H.M M.R
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
HEATER & LIGTING
-XDC 1 2
A A
2 4
-Q0
16A 1 3
NOTES
-XTDC
1
110V DC TO
NEXT PANEL
2
B B
/4.2
/4.2
11
-Q4 AS-BUILT
/4.4 14 12
DATE : 2017/03/12
11
E.K.C
-Q2
/4.2 14 12
11
-P3
C A1 IN(+) M(-) A2
/4.1 14 12 KEY PLAN C
-P3
2
R4
-KDC
3UG4632 R3 12.03.2017 AS BUILT M.M H.M M.R
DC HEALTH 10
<U> 60.13.9.110 R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
12 11 14 Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
3 VENDOR :
1 /18.4
12 14 4
-1 -2 7 -3 -4 -5 -6 -7 -8 ELECTRO KAVIR CO. (EKC)
6
12.1 12.1 5 14.1 14.1 16.1 16.1 9.2 9.2 EKC DWG. NO. : 11039-0-MWD-01
11 9
11 CLIENT :
/4.2
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A 7.1 A
-A
M.I
NOTES
1
-ES1
EARTH SWITCH
2
14 12 24 22 34 32 44 42
-ML
/13.4
-XE1 2 -XE1 4 -XE1 6 -XE1 8 -XE1 10 -XE1 12 ELECTROMECHANICAL
INTER LOCK
DATE : 2017/03/12
E.K.C
AUX. CONTACT FOR EARTH SWITCH
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
R S T
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A -XL 1 A
P2 1S2
-CT1.1 / 9.1
-CT1 -XL 2
1st CORE 1S1
P1
-XL 3
P2 1S2
-CT2.1 / 9.1
-CT2 -XL 4 TO MEASURING
1st CORE 1S1
P1
P2 1S2
-XL 5 NOTES
-CT3.1 / 9.1
-CT3 -XL 6
1st CORE 1S1
P1
-CTE1 / 9.1
-PE
-TB1
-XL 7 CURRENT TEST BOX
P2 2S2
(50,51,50N,51N)
B B
-CT1 -XL 8
2S1 1 2
2nd CORE
P1
-CT1.2 / 10.1 LEGEND & ABBREVIATION
-XL 9 3 4
P2 2S2
-CT2.2 / 10.1
-CT2 -XL 10 TO PROTECTION RELAY
2S1 5 6
2nd CORE -CT3.2 / 10.1
P1
-XL 11 7 8
P2 2S2
-CTE2 / 10.1
-CT3 -XL 12
2nd CORE 2S1
P1 AS-BUILT
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
-CVD1-3
R0 18.01.2016 Issue For Approval M.M H.M M.R
(Note) Ck Ck Ck
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
-PE ELECTRO KAVIR CO. (EKC)
-VI1 L1 L2 L3 X EKC DWG. NO. : 11039-0-MWD-01
LC-Display CLIENT :
L2
IRANIAN OFFSHORE OIL CO. (IOOC)
EPC CONTRACTOR :
L1 L3
LOLEH PEY GOSTAR CO. (LPGC)
VOLTAGE DETECTING SYSTEM
PROJECT TITLE :
A A
FROM PREVIOUS
-L2 /8.1
PANEL
-V1
+ -
V
-L3 /8.1
0-3.6KV
TR
RS
ST
0
0
R/L1 S/L2 T/L3
1 3 5
-Q6
-Q A4
1a 1P -XP 1 2 1
1250A
2 4 6 -PT1.1 / 9.1
TO MEASURING
1a B4 -XP 2 4 3
B 2P B
-PT2.1 / 9.1
-PT1-3
1a 3P
C4 -XP 3 6 5
LEGEND & ABBREVIATION
-A -PT3.1 / 9.1
5.2 -F01-3 2A
A 1n
-PTE1 / 9.1
1st Core
-Q5 -TB2
A
VOLTAGE TEST BOX
27,59
A 2a D4 -XP 4 2 1 1 2
4P
-PT1.2 / 10.1
TO PROTECTION
X
2a 5P
A10 -XP 5 4 3 3 4 AS-BUILT
-PT2.2 / 10.1
RELAY
E05
2a B10 -XP 6 6 5 5 6 DATE : 2017/03/12
6P E.K.C
D1 -PT3.2 / 10.1
2A
2n C10 -XP 7 7 8
E01
-XP 8
-PTE2 / 10.1
2nd Core
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
6.1 6.2 6.2
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
7.2/
A 7.2/ A
TO NEXT PANEL
7.2/
NOTES
-CVD1-3
(Note) Ck Ck Ck
1
-ES2
EARTH SWITCH
2
-PE
-VI2 L1 L2 L3 X
LC-Display
B 3 B
L2
AS-BUILT
DATE : 2017/03/12
E.K.C
C KEY PLAN C
-XE2 1 -XE2 3 -XE2 5 -XE2 7 -XE2 9 -XE2 11 -XE2 13
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
13 11 23 21 33 31 43 41
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
14 12 24 22 34 32 44 42
R0 18.01.2016 Issue For Approval M.M H.M M.R
-MB
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
/13.4
ELECTROMECHANICAL VENDOR :
-XE2 2 -XE2 4 -XE2 6 -XE2 8 -XE2 10 -XE2 12 -XE2 14 -XE2 15
INTER LOCK
ELECTRO KAVIR CO. (EKC)
-ES2.1 -ES2.2 -ES2.3 -ES2.4 -ES2.5 -ES2.6 -ES2.7 EKC DWG. NO. : 11039-0-MWD-01
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A 4.4 / -7 -7 / 10.2 A
4.4 / -8 -8 / 10.2
-M1
20 21
DIGITAL MULTIMETER
IME (96HD+)
AUX. SUPPLY NOTES
CURRENT VOLTAGE
1 3 4 6 7 9 2 5 8 11
-A1
B B
+ -
6.3 / -CT1.1 A LEGEND & ABBREVIATION
-A2
+ -
6.3 / -CT2.1 A
-A3
+ -
6.3 / -CT3.1 A AS-BUILT
DATE : 2017/03/12
E.K.C
6.3 / -CTE1
C KEY PLAN C
R4
7.4 / -PT1.1
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
7.4 / -PT2.1
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
7.4 / -PT3.1
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
7.4 / -PTE1
ELECTRO KAVIR CO. (EKC)
EKC DWG. NO. : 11039-0-MWD-01
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
BO1:50,51,50N,51N
-P1 BO3:27+FFM,59
PROTECTION RELAY
BO4:74TC
A A
7SJ803
F1 C11
6.3 / -CT1.2 IL1
LED1 :50,51
F2 C9 LED2 :50N,51N
LED3 :27
BO1
F3 C10 LED4 :59
6.3 / -CT2.2 IL2,IE2
LED5 :74TC
F4 C14
NOTES
F5 C13
6.3 / -CT3.2 IL3
BO2
F6 C12
6.3 / -CTE2
F7 E1
IE,IEE BO3
F8 E2
E3
BO4
B E9 B
7.4 / -PT1.2 VL1,V12,Vph-e
E4
E11
LEGEND & ABBREVIATION
7.4 / -PT2.2 VL2,V23
E5
BO5
E12
E6
E13
7.4 / -PT3.2 VL3,VE,Vsyn,Vx
E14 E10
7.4 / -PTE2
LIVE
STATUS E8 AS-BUILT
CONTACT
C3
BI1
E7 DATE : 2017/03/12
E.K.C
C4
C5 + C1
BI2 =
POWER (~)
C6 SUPPLY - C2
=
C C7
KEY PLAN C
BI3
C8 System R4
PORT B
interface R3 12.03.2017 AS BUILT M.M H.M M.R
/11.3
/12.2
/12.2
EPC CONTRACTOR :
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A A
10.4 / -7
-X2 1
FROM UPSTREAM
NOTES
INTER TRIP
C11 3
-P1 -S3
/10.2 C9 RESET 4
BO1 LOCK OUT
CURRENT FAULT
-X2 2
B B
-LO 3 4 5 6 B1
+
SET
2
-
AS-BUILT
RESET
1 DATE : 2017/03/12
E.K.C
11 7 12 8 13 9 14 10 +
7
3 /17.2
11
8
C 12
4 /19.3
KEY PLAN C
9
5 /12.3
13
10
6 /14.3 R4
14
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A A
4.1 / -1 -1 / 13.1
NOTES
-XS 44
C11
E1 E3 5 43
B B
-P1 -P1 -LO -QS1.17
/10.2
BO3
E2 /10.2
BO4
E4 /11.2
LOCKOUT
9 13 /2.3
SERVICE
44
LEGEND & ABBREVIATION
VOLTAGE FAULT 74TC POSITION
D11
-XS 45
AS-BUILT
DATE : 2017/03/12
E.K.C
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
2 2 2 2
-KV -K74 -K86 -KS Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VOLTAGE FAULT 74TC FAULT SERVICE POSITION VENDOR :
60.13.9.110 10 60.13.9.110 10 60.13.9.110 10 60.13.9.110 10
ELECTRO KAVIR CO. (EKC)
4.1 / -2 -2 / 13.1
EKC DWG. NO. : 11039-0-MWD-01
CLIENT :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
12.4 / -1 -1 / 14.1
-XS 31
A D14 A
11
13
-QS1.11 3
/2.1 12 SERVICE 14
POSITION -SES
TEST
E.S PERMIT 4
POSITION
D13 C13
-XS 32 -XS 33
NOTES
0 1
1 1 3 3 3
-SLR -SLR
0:LOCAL 2 2 4 4 /13.2 4
1:REMOTE /17.3 REMOTE
/13.2
B B
3 1 3 3
-X2 3 -X2 11 -X2 13
LEGEND & ABBREVIATION
-S1 -S1 -X2 15
OPEN COMMAN
CLOSE 4 2 4 /13.1 4
CLOSE COMMAND
OPEN COMMAND
FROM F & G
FROM REMOTE
6
FROM REMOTE
/14.2
/13.2
SPARE
1 -KV
/12.2 7 5
-S2 VOLTAGE
/14.2 2 FAULT
OPEN
-X2 4 -X2 12 -X2 14 -X2 16
AS-BUILT
-XS 34
A15 -X2 17
DATE : 2017/03/12
BREAKER ISOLATION
E.K.C
UPSTREAM CIRCUIT
1
-KV -X2 5 21
/12.2 3 4
VOLTAGE FAULT -QS1.12
/2.1 22
SPARE
TEST
1
POSITION
-K86 B14 -X2 18
C
/12.3
FAULT
3 4 -XS 35 KEY PLAN C
-X2 6
R4
1 -X2 7
PERMISSION TO CLOSE
/12.2 3 4
74TC R1 29.02.2016 Issue For Approval M.M H.M M.R
-XE2 7
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
21 -X2 8
ELECTRO KAVIR CO. (EKC)
-ES2.4 EKC DWG. NO. : 11039-0-MWD-01
BUS 22 -X2 9
E.S OPEN CLIENT :
AUTHORIZATION
-XE2 8
EPC CONTRACTOR :
A1 A1
-KC -KO LOLEH PEY GOSTAR CO. (LPGC)
-MB -ML
C.B CLOSE C.B OPEN /8.2 /5.3
3RH1122-1BF40 A2 -X2 10 A2
3RH1122-1BF40 ELECTROMECHANICAL ELECTROMECHANICAL PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
12.4 / -2 -2 / 14.1 (PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
13 14 /14.2 13 14 /14.3 INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
21 22 21 22 INCOMING WIRING DIAGRAM
31 32 31 32
43 44 43 44 REF. NO. : IOOC-LPGC-BPD-ELC-DIA-357-R4 SC. : NONE
DOCUMENT NO. IOOC-LPGC-BPD-ELC-DIA-004-R3 SIZE : A3
COMPANY CONTRACTOR PROJECT DISCIPLINE DOC. SEQ. NO. REV. SHEET: 13 OF 22
IOOC LPGC BPD ELC DIA 004 R3 PAGE: 17 OF 45
1 2 3 4 5
1 2 3 4 5
13.4 / -1
A A
13.2 / -161A
13
-KC
/13.1 14 13.1 / -160A 3 6 13
C.B CLOSE
-S2 -LO -KO C3
TRIP CIRCUIT
/14.2 4 /11.2 10 14 /13.2 14 -P1 SUPERVISION
LOCKOUT C.B OPEN
/10.2 C4 NOTES
3 1 3
-S2
OPEN 4 2 4
/13.2
/14.3
-XS 28
1 A9
-S1
/13.1 2 61
B CLOSE
63 B
-QS1.8
/2.3 64
C.B OPEN
62 LEGEND & ABBREVIATION
C.B CLOSE
C9 B9
-XS 29 -XS 30
4.2 / -3
AS-BUILT
-XS 1 -XS 3 -XS 5 -XS 6
A1 A2 C2
DATE : 2017/03/12
E.K.C
11 21
23
21
S1.1 S3 S1.4
S21 12 22
24
22
21 13
A1 K1
C 22 14 KEY PLAN C
-QM1 M1 M -QY9 -QY1
/2.1 /2.2 /2.3
31
D2
K1 R4
32 R3 12.03.2017 AS BUILT M.M H.M M.R
21 A1
A1 A1 R2 15.03.2016 Issue For Approval M.M H.M M.R
S22 Y1
22
Y9 K1
U R1 29.02.2016 Issue For Approval M.M H.M M.R
A2
A2 A2 R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
D16 B2 D2
-XS 2 -XS 4 -XS 7 ELECTRO KAVIR CO. (EKC)
EKC DWG. NO. : 11039-0-MWD-01
CLIENT :
MOTOR OPERATING MECHANISM CLOSING AND ANTI-PUMPING DEVICE 1 st SHUNT RELEASE PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A A
NOTES
B B
DATE : 2017/03/12
E.K.C
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A A
4.3 / -5
/3.1
B B
-DB K1
DIODE BOX
K2
K3
A1
K4 AS-BUILT
K5 DATE : 2017/03/12
E.K.C
K6
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
4.3 -6 INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A A
REMOTE
NOTES
B B
D5 A8
43
41 3 3 1 11
-QS1.6 -QS1.5 -LO -SLR -SLR -KV
/2.2 44 /2.2 42 /11.2 7 11 /13.2 4 /13.2 2 /12.2 9 8
C.B CLOSE C.B OPEN FAULT POS.2 POS.1 VOLTAGE
REMOTE STATUS LOCAL STATUS FAULT AS-BUILT
C5 B8
-XS 24 -XS 22
DATE : 2017/03/12
E.K.C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
REMOTE
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A A
REMOTE
NOTES
B B
41
23 6 13 13 1
-QS1.16 -QS1.13 -K74 -ES2.1 -ES1.1 -KDC
/2.3 42 /2.2 24 /12.2 7 5 14 14 /4.2 3 4
BUS E.S CLOSE /5.1
TEST SERVICE 74TC DC HEALTH
LINE E.S CLOSE
POSITION POSITION AS-BUILT
C14 D15
-XS 43 -XS 37 -XE2 2 -XE1 2
DATE : 2017/03/12
E.K.C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
REMOTE
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
INCOMING WIRING DIAGRAM
A A
UPSTREAM
NOTES
-XS 17
C7
31
-QS1.3
B /2.1 32 B
C.B OPEN
-XE2 3 -XE2 9 LEGEND & ABBREVIATION
D7
-XS 18
1 4 11 33
-KS -XS 40 -LO -ES2.2 -ES2.5
/12.3 3 4 A13 /11.2 8 12 EARTH SWITCH 12 EARTH SWITCH 34
SERVICE AUTHORIZATION TO CLOSE LOCKOUT OPEN CLOSE
POSITION
33
11
-K86
/12.3 9 8
FAULT
C KEY PLAN C
R4
-X2 44 -X2 46 -X2 47 -X2 50 -X2 54
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
PROJECT TITLE :
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
-X2 51 52 55 56 57 58 59
INCOMING WIRING DIAGRAM
C
A
D
X2
Description Connection Connection Placement
1
1
= 4 -KV:1 /13.2
= -X2:7 6 /13.2
= 12 -KO:2 /13.2
2
2
= 14 -KO:2 /13.3
= -KV:7 16 /13.3
= -ML:A1 18 /13.4
= 20 -XS:24 /17.1
= 22 -XS:22 /17.2
3
3
= 24 -LO:3 /17.2
= 26 -SLR:4 /17.3
= 28 -SLR:2 /17.3
= 30 -KV:11 /17.4
= 32 -XS:43 /18.1
= 34 -XS:37 /18.2
R0
R1
R2
R3
R4
Rev.
IOOC
CLIENT :
VENDOR :
REF. NO. :
DOCUMENT NO.
PROJECT TITLE :
DATE
DRAWING TITLE :
EPC CONTRACTOR :
LPGC
18.01.2016
29.02.2016
15.03.2016
12.03.2017
BPD
E.K.C
ELC
AS BUILT
DIA
NOTES
DESCRIPTION
Issue For Approval
Issue For Approval
Issue For Approval
KEY PLAN
AS-BUILT
004
5
5
TERMINAL DIAGRAM
IOOC-LPGC-BPD-ELC-DIA-004-R3
IOOC-LPGC-BPD-ELC-DIA-357-R4
DOC. NO.
DATE : 2017/03/12
R3
LOLEH PEY GOSTAR CO. (LPGC)
M.M
M.M
M.M
M.M
PAGE:
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
BAHREGAN STORAGE TANKS DEVELOPMENT
H.M
H.M
H.M
H.M
SIZE : A3
24 OF 45
SHEET: 20 OF 22
SC. : NONE
M.R
M.R
M.R
M.R
C
A
D
1 2 3 4 5
A A
Placement
Placement
/18.2
/18.2
/18.3
/18.3
/18.3
/18.3
/18.4
/18.4
/19.1
/19.1
/19.2
/19.2
/19.3
/19.3
/19.3
/19.3
/19.3
/19.3
/19.3
/19.3
/19.4
/19.4
/19.4
/19.4
/19.4
/4.2
/4.3
NOTES
Connection
Connection
-XE2:10
-KDC:3
-K74:7
-K86:8
-XE2:2
-XE1:2
-XE2:4
-Q0:1
-Q0:3
-LO:8
-KS:4
B B
XDC
X2
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
2
AS-BUILT
DATE : 2017/03/12
E.K.C
Connection
Connection
-KDC:1
-K74:6
-XE2:1
-XE1:1
-XE2:3
-XE2:9
-XS:17
-LO:4
-KS:1
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
AUTHORIZATION TO CLOSE TO UPSTREAM
BUS EARTH SWITCH CLOSE TO REMOTE
Description
VENDOR :
SPARE
=
=
EKC DWG. NO. : 11039-0-MWD-01
CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
TERMINAL DIAGRAM
A A
Placement
/4.4
/4.4
NOTES
Connection
-Q4:1
-Q4:3
B B
AS-BUILT
DATE : 2017/03/12
E.K.C
Connection
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
110V DC TO NEXT PANEL
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
TERMINAL DIAGRAM
A A
NOTES
B
OUTGOING LEGEND & ABBREVIATION
B
WIRING DIAGRAM
AS-BUILT
DATE : 2017/03/12
E.K.C
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
11 21
23
21
S1.1 S3 S1.4
S21 12 22 -XS 8 -XS 13 -XS 15
24
22
A6 C6
21 13
A1 K1
22 14 SPARE 13
21
D16 B2 D2
-XS 2 -XS 4 -XS 7
B B
C7 A3 A8 D5 C8 A9 B11
AS-BUILT
11 23 31
33
41
43 53
51
63
61 21
-S1.1 -S1.2 -QS1.3 -QS1.4 -QS1.5 -QS1.6 -QS1.7 -QS1.8 -QS1.9 DATE : 2017/03/12
12 24 /16.1 32 C.B CLOSE 34 /14.2 42 /14.1 44 /13.2 54
C.B OPEN
52 /11.4 64
C.B OPEN
62 C.B OPEN 22 E.K.C
C.B OPEN C.B OPEN C.B CLOSE C.B CLOSE C.B CLOSE
D7 B3 B8 C5 D9 D8 C9 B9 B1
-XS 18 -XS 20 -XS 22 -XS 24 -XS 26 -XS 27 -XS 29 -XS 30 -XS 47
INTERNALY WIRED
C KEY PLAN C
R4
-S21,S22 : POSITION SWITCHES R3 12.03.2017 AS BUILT M.M H.M M.R
AUXILARY SWITCH FOR TEST & SERVICE POSITION 4NO/4NC
(CUT OFF MOTOR AFTER CHARGING) R2 15.03.2016 Issue For Approval M.M H.M M.R
NC CONTACT FOR TEST POSITION
R1 29.02.2016 Issue For Approval M.M H.M M.R
NO CONTACT FOR SERVICE POSITION -M1 : MOTOR OPERATING MECHANISM
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-K1 : ANTI-PUMPING CONTACTOR VENDOR :
-XS 31 -XS 34 -XS 36 -XS 38 -XS 40 -XS 42 -XS 44
ELECTRO KAVIR CO. (EKC)
D14 A15 C15 B15 A13 A14 C11 -Y9 : CLOSING SOLENOID
EKC DWG. NO. : 11039-0-MWD-01
CLIENT :
11
13
21
23
31
33
41
43 -S3 : POSITION SWITCHES
IRANIAN OFFSHORE OIL CO. (IOOC)
-QS1.11 -QS1.12 -QS1.13 -QS1.14 -QS1.15 -QS1.16 -QS1.17 (OPEN WHEN CLOSING
/10.1 12 SERVICE 14 /16.2 22 /15.2 24 TEST 32 /16.1 34 /15.1 42 /9.3 44
POSITION
SPRING CHARGED) EPC CONTRACTOR :
TEST TEST SERVICE POSITION SERVICE TEST SERVICE
POSITION POSITION POSITION POSITION POSITION POSITION
LOLEH PEY GOSTAR CO. (LPGC)
D13 C13 B14 D15 C16 B13 C14 D11 -Y1 : 1st SHUNT RELEASE
-XS 32 -XS 33 -XS 35 -XS 37 -XS 39 -XS 41 -XS 43 -XS 45
PROJECT TITLE :
-S6 : BREAKER TRIPING SIGNAL BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
-S7 : CUT-OUT SWITCH FOR
BREAKER TRIPPING SIGNAL DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
A A
NOTES
-XTAC -XTAC
1 3 1 3
-FH -FL
32/2A 32/0.5A
gG 2 4 gG 2 4
AS-BUILT
DATE : 2017/03/12
E.K.C
1 COM
-TH -MS1
Thermostat Microswitch NC NO
2
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
3 1
R2 15.03.2016 Issue For Approval M.M H.M M.R
-SLT -SLT
R1 29.02.2016 Issue For Approval M.M H.M M.R
/13.1 4 /13.1 2 -XH 1 -XH 3
R0 18.01.2016 Issue For Approval M.M H.M M.R
EPC CONTRACTOR :
HEATER FOR SWITCHING HEATER FOR
DEVICE COMPARTMENT CONNECTION COMPARTMENT LOLEH PEY GOSTAR CO. (LPGC)
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
HEATER & LIGTING
A A
-XTDC -XTDC
110 V DC 1 1 110 V DC
FROM PREVIOUS PANEL NOTES
TO NEXT PANEL
2 2
2 4 2 4 2 4 2 4
-Q1 -Q2 -Q3 -Q4
B 4A 1 3 4A 1 3 2A 1 3 4A 1 3 B
AS-BUILT
DATE : 2017/03/12
E.K.C
C
-1 -2 -3 -4 -5 -6 -7 -8
KEY PLAN C
9.1 9.1 11.1 11.1 13.1 13.1 7.2 7.2
R4
CONTROL MOTOR CHARGING SIGNALLING PROTECTION
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
-L2 -L2
A -L3 -L3 A
1 3 5
-Q
1250A
2 4 6 NOTES
6.2
-A1
-XL 1 + -
P1 1S2
A
B B
-CT1 -XL 2
1S1
1st CORE
P2 -A2 LEGEND & ABBREVIATION
-XL 3 + -
P1 1S2
A
-CT2 -XL 4
1st CORE 1S1
P2 -A3
-XL 5 + -
P1 1S2
A
-CT3 -XL 6
1st CORE 1S1
P2 AS-BUILT
-TB1
-XL 7 CURRENT TEST BOX
P1 2S2
(50,51,50N,51N)
C -CT1 -XL 8 1 2
KEY PLAN C
2nd CORE 2S1
P2
-CT1.2 / 7.1
-XL 9 3 4 R4
P1 2S2
-CT2.2 / 7.1
R3 12.03.2017 AS BUILT M.M H.M M.R
-CT2 -XL 10 TO PROTECTION RELAY
2S1 5 6 R2 15.03.2016 Issue For Approval M.M H.M M.R
2nd CORE -CT3.2 / 7.1
P2 R1 29.02.2016 Issue For Approval M.M H.M M.R
-XL 11 7 8 R0 18.01.2016 Issue For Approval M.M H.M M.R
P1 2S2
-CTE2 / 7.1
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
-CT3 -XL 12 VENDOR :
2nd CORE 2S1
P2
ELECTRO KAVIR CO. (EKC)
EKC DWG. NO. : 11039-0-MWD-01
-PE CLIENT :
EPC CONTRACTOR :
PROJECT TITLE :
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
A A
5.2
M.I
NOTES
-ES1
EARTH SWITCH
B B
13 11 23 21 33 31 43 41
14 12 24 22 34 32 44 42
-ML AS-BUILT
/10.4
ELECTROMECHANICAL
-XE1 2 -XE1 4 -XE1 6 -XE1 8 -XE1 10 -XE1 12 INTER LOCK DATE : 2017/03/12
E.K.C
-ES1.1 -ES1.2 -ES1.3 -ES1.4 -ES1.5 -ES1.6 -ES1.7
/15.3 /13.3 /16.3 /16.3 -CVD1-3
(Note) Ck Ck Ck
R4
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
BI1:74TC
BO1:50,51,50N,51N
BO3:74TC
A -P1 A
PROTECTION RELAY
7SJ801
F1 C11 LED1 :50,51
5.3 / -CT1.2 IL1
LED2 :50N,51N
F2 C9 LED3 :74TC
BO1
F3 C10
5.3 / -CT2.2 IL2,IE2 NOTES
F4 C14
F5 C13
5.3 / -CT3.2 IL3
BO2
F6 C12
5.3 / -CTE2
F7 E1
IE,IEE BO3
F8 E2
B B
E3
BO4 LEGEND & ABBREVIATION
C3
BI1 E4
C4
E5
BO5
C5
BI2 E6
C6
E10 AS-BUILT
C7
BI3
LIVE
STATUS E8 DATE : 2017/03/12
C8 E.K.C
CONTACT
E7
+ C1
=
(~)
C
POWER
SUPPLY
KEY PLAN C
- C2
=
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
/8.3
/9.2
EPC CONTRACTOR :
PROJECT TITLE :
4.3 / -7 -7 / 8.1 BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
4.4 / -8 -8 / 8.1 DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
7.4 / -7
A A
FROM DOWNSTREAM
-X2 1
INTER TRIP
C11 3
-P1 -S3
/7.2 C9 RESET 4
BO1 LOCK OUT
CURRENT FAULT
-X2 2 NOTES
-LO 3 4 5 6 B1
+
B B
SET
LEGEND & ABBREVIATION
2
-
RESET
1
11 7 12 8 13 9 14 10 +
AS-BUILT
7
3 /14.2 DATE : 2017/03/12
11 E.K.C
8
4 /16.3
12
9
5 /9.2
13
10
6 /11.3
14
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
4.1 / -1 -1 / 10.1
A A
-XS 44
C11
NOTES
5 E1 43
B B
AS-BUILT
DATE : 2017/03/12
E.K.C
C KEY PLAN C
2 2 2
-K86 -K74 -KS R4
FAULT 74TC SERVICE R3 12.03.2017 AS BUILT M.M H.M M.R
60.13.9.110 10 60.13.9.110 10 POSITION 10
R2 15.03.2016 Issue For Approval M.M H.M M.R
60.13.9.110
R1 29.02.2016 Issue For Approval M.M H.M M.R
4.2 / -2 -2 / 10.1
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
3 3 3 VENDOR :
1 /10.2 1 /10.2 1 /16.2
4 4 4
7 7 7 ELECTRO KAVIR CO. (EKC)
6 /13.3 6 /15.2 6 /13.4 EKC DWG. NO. : 11039-0-MWD-01
5 5 5
9 9 9 CLIENT :
11 /16.1 11 11
8 8 8
IRANIAN OFFSHORE OIL CO. (IOOC)
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
D14
11
13
A A
-QS1.11
/2.1 12 SERVICE 14
TEST POSITION
POSITION
D13 C13
-XS 32 -XS 33
NOTES
0 1
1 1 3 3 3
-SLR -SLR 3
0:LOCAL 2 2 4 4 /10.2 4 -SES
1:REMOTE REMOTE
E.S PERMIT
/14.4
/10.2
/14.3
4
3 1 3 3
-S1 -S1 -X2 7 -X2 9 -X2 11
B B
CLOSE /10.1
OPEN COMMAND
4 2 4 4
CLOSE COMMAND
LEGEND & ABBREVIATION
FROM REMOTE
FROM REMOTE
/11.2
/10.2
SPARE
1
-S2
/11.2 2
OPEN
-X2 8 -X2 10 -X2 12
1
-K86 -X2 13
DOWNSTREAM CIRCUIT
BREAKER ISOLATION
/9.2 3 4 AS-BUILT
FAULT
1 DATE : 2017/03/12
E.K.C
-K74
/9.2 3 4
74TC
-X2 14
-X2 3
KEY PLAN
SPARE
C C
R4
FROM DOWNSTREAM)
EPC CONTRACTOR :
A1 A1 LOLEH PEY GOSTAR CO. (LPGC)
-KC -KO -ML
C.B CLOSE C.B OPEN /6.2
3RH1122-1BF40 A2 3RH1122-1BF40 A2 PROJECT TITLE :
ELECTROMECHANICAL
INTER LOCK BAHREGAN STORAGE TANKS DEVELOPMENT
D A1;A2 D
9.3 / -2 -2 / 11.1 (PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
13 14 /11.2 13 14 /11.3 INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
10.4 / -1
A A
10.2 / -161A
13 10.1 / -160A 3 6 13
C3
-KC -S2 -LO -KO TRIP CIRCUIT
/10.2 14 /11.2 4 /8.2 10 14 /10.3 14 -P1 SUPERVISION
C.B CLOSE LOCKOUT C.B OPEN /7.2 C4
NOTES
3 1 3
-S2
OPEN 4 2 4
/10.2
/11.3
-XS 28
1 A9
-S1
B /10.1 2 61 B
63
CLOSE
-QS1.8 LEGEND & ABBREVIATION
/2.3 64
C.B OPEN
62
C.B CLOSE
C9 B9
-XS 29 -XS 30
4.2 / -3
AS-BUILT
-XS 1 -XS 3 -XS 5 -XS 6
A1 A2 C2 DATE : 2017/03/12
E.K.C
11 21
23
21
S1.1 S3 S1.4
S21 12 22
24
22
21 13
C
A1 K1 KEY PLAN C
22 14
-QM1 M1 M -QY9 -QY1
/2.1 /2.2 /2.3
31
R4
D2
K1 R3 12.03.2017 AS BUILT M.M H.M M.R
32
21 A1 R2 15.03.2016 Issue For Approval M.M H.M M.R
A1 A1
S22 Y1 R1 29.02.2016 Issue For Approval M.M H.M M.R
22 U
Y9 K1 A2 R0 18.01.2016 Issue For Approval M.M H.M M.R
A2 A2
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
PROJECT TITLE :
MOTOR OPERATING MECHANISM CLOSING AND ANTI-PUMPING DEVICE 1 st SHUNT RELEASE BAHREGAN STORAGE TANKS DEVELOPMENT
D D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
A A
NOTES
B B
DATE : 2017/03/12
E.K.C
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
A A
4.3 / -5
-XS 25 -XE1 5
C8
NOTES
6 6
53
51 23
3 1 3 -K86 -KS
-QS1.7 /9.2 -ES1.3 /9.3
-SLT /2.3 54 52
7 5 7 5
C.B OPEN FAULT /6.1 24 SERVICE
LAMP TEST 4 2 4 C.B CLOSE
LINE E.S CLOSED POSITION
/3.1
/3.1
D9 D8
-XS 26 -XS 27 -XE1 6
B B
-DB K1
DIODE BOX
K2
K3
A1
K4 AS-BUILT
K5 DATE : 2017/03/12
E.K.C
K6
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
EPC CONTRACTOR :
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
4.3 -6 INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
A A
REMOTE
NOTES
B B
D5 A8
43
41 3 3 1
-QS1.6 -QS1.5 -LO -SLR -SLR
/2.2 44 /2.2 42 /8.2 7 11 /10.2 4 /10.2 2
C.B CLOSE C.B OPEN FAULT POS.2 POS.1
REMOTE STATUS LOCAL STATUS AS-BUILT
C5 B8
-XS 24 -XS 22
DATE : 2017/03/12
E.K.C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
REMOTE
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
A A
REMOTE
NOTES
B B
41
23 6 13
-QS1.16 -QS1.13 -K74 -ES1.1
/2.3 42 /2.2 24 /9.2 7 5 14
/6.1
TEST SERVICE 74TC
LINE E.S CLOSE
POSITION POSITION AS-BUILT
C14 D15
-XS 43 -XS 37 -XE1 2
DATE : 2017/03/12
E.K.C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
R0 18.01.2016 Issue For Approval M.M H.M M.R
Rev. DATE DESCRIPTION DESIG. CHKD. APPR.
VENDOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
A DOWNSTREAM A
NOTES
-X2 43 -X2 33 -X2 36 -X2 38 -X2 39 -X2 41
-XS 17
C7
31
-QS1.3
/2.1 32
B C.B OPEN B
21 1 4 31 33
-QS1.12 -KS -LO -ES1.6 -ES1.5
-XS 40 /2.1 22 /9.3 3 4 /8.2 8 12 /6.2 32 /6.2 34
TEST SERVICE LOCKOUT EARTH SWITCH EARTH SWITCH
A13 POSITION POSITION OPEN CLOSE
AUTHORIZATION TO CLOSE
B14
-XS 35 -XE1 12 -XE1 10
33 AS-BUILT
-QS1.15
/2.2 34
SERVICE DATE : 2017/03/12
E.K.C
POSITION
B13
-XS 41
11
-K86
C
/9.2
FAULT
9 8 KEY PLAN C
DOWNSTREAM
CLIENT :
EPC CONTRACTOR :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
45 46 47 48 49
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
OUTGOING WIRING DIAGRAM
C
A
D
X2
Description Connection Connection Placement
1
1
= -X2:5 4 /10.2
= -KC:2 6 /10.2
= 8 -K86:1 /10.2
= 10 -KO:2 /10.3
= 12 -KO:2 /10.3
2
2
= -ML:A1 14 /10.4
= 16 -XS:24 /14.1
= 18 -XS:22 /14.2
= 20 -LO:3 /14.2
= 22 -SLR:4 /14.3
3
3
= 24 -SLR:2 /14.4
= 26 -XS:43 /15.1
= 28 -XS:37 /15.2
= -K74:6 30 /15.3
= 32 -XE1:2 /15.3
= 34 -XS:35 /16.2
R0
R1
R2
R3
R4
Rev.
IOOC
CLIENT :
VENDOR :
REF. NO. :
DOCUMENT NO.
PROJECT TITLE :
DATE
DRAWING TITLE :
EPC CONTRACTOR :
LPGC
18.01.2016
29.02.2016
15.03.2016
12.03.2017
BPD
E.K.C
ELC
AS BUILT
DIA
NOTES
DESCRIPTION
Issue For Approval
Issue For Approval
Issue For Approval
KEY PLAN
AS-BUILT
004
5
5
TERMINAL DIAGRAM
IOOC-LPGC-BPD-ELC-DIA-004-R3
IOOC-LPGC-BPD-ELC-DIA-357-R4
DOC. NO.
DATE : 2017/03/12
R3
LOLEH PEY GOSTAR CO. (LPGC)
M.M
M.M
M.M
M.M
PAGE:
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
BAHREGAN STORAGE TANKS DEVELOPMENT
H.M
H.M
H.M
H.M
SIZE : A3
43 OF 45
SHEET: 17 OF 18
SC. : NONE
M.R
M.R
M.R
M.R
C
A
D
1 2 3 4 5
A A
Placement
Placement
/16.2
/16.2
/16.3
/16.3
/16.3
/16.3
/16.3
/16.3
/16.1
/16.1
/16.4
/16.4
/16.4
/16.4
/16.4
/4.1
/4.4
/4.1
/4.4
NOTES
Connection
Connection
-XE1:12
-XE1:10
-K86:8
-Q4:1
-Q4:3
-LO:8
-KS:3
B B
XTDC
X2
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
2
AS-BUILT
DATE : 2017/03/12
E.K.C
Connection
Connection
-XE1:11
-XE1:9
-XS:17
-Q1:1
-Q1:3
-LO:4
-KS:1
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
AUTHORIZATION TO CLOSE TO DOWNSTREAM
110 V DC FROM PREVIOUS PANEL R0 18.01.2016 Issue For Approval M.M H.M M.R
110 V DC TO NEXT PANEL
Description
VENDOR :
EPC CONTRACTOR :
PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
(PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
TERMINAL DIAGRAM
M,N
M,N
M,N
NOTES
30cm 30cm 30cm
N,M
N,M
N,M
L
* * *
/1.1
B B
CELL 4 CELL 5
AS-BUILT
M,N
C KEY PLAN C
R4
R3 12.03.2017 AS BUILT M.M H.M M.R
30cm 30cm
R2 15.03.2016 Issue For Approval M.M H.M M.R
R1 29.02.2016 Issue For Approval M.M H.M M.R
N,M
N,M
EPC CONTRACTOR :
* Please see the table below to determine cable length. PROJECT TITLE :
D
BAHREGAN STORAGE TANKS DEVELOPMENT D
Description Order code (PIPING , MANIFOLD , CONTROL SYSTEM & FIRE FIGHTING)
DRAWING TITLE :
MAIN SUBSTATION MV SWITCHGEAR
CABLE CONNECTION(5m) FOR RELAY TO RELAY 7XV5103-0AA05 INCOMING & OUTGOING WIRING DIAGRAM(MV3000-23)
C
SERIAL LINK DIAGRAM
L BUS CONNECTION 7XV5103-5AA00 REF. NO. : IOOC-LPGC-BPD-ELC-DIA-357-R4 SC. : NONE
DOCUMENT NO. IOOC-LPGC-BPD-ELC-DIA-004-R3 SIZE : A3
M CABLE CONNECTION(0.5m) 7XV5103-2AA00
COMPANY CONTRACTOR PROJECT DISCIPLINE DOC. SEQ. NO. REV. SHEET: 1 OF 1
IOOC LPGC BPD ELC DIA 004 R3 PAGE: 45 OF 45
1 2 3 4 5