Вы находитесь на странице: 1из 2

U ni te d Dy na m ic s

Vo l um e 2 , Is su e 1
A dv a nce d T ec hno lo g ie s C o r po r a tio n
2 68 1 C or a l R i dge R d Fe b r u ar y 9 , 2 0 1 1
B r o o ks , K Y 4 0 109

T H E I NS PEC TIO NE ER P O S T The Name Behind The Flame


Fueling the Minds of Electricity

INSIDE THIS ISSUE:

 Key Tips to consider B O I L E R I N S P E C T I O N R E PA I R C R I T E R I A :


while developing a CONSISTENCY, TH RESHOLD S, AND KNOWING
Boiler Inspection WHEN TO IMPLEMENT ADJUSTMENTS.
Repair Prioritization
Program. Do you currently have a Combine wastage rate
2) Number of years in calculations with time, and
criteria program by service. you can not only establish the
 Criteria concerns with which you follow to 3) Number of years/months repair criteria, you can also
Operational variations. justify repairs during unit before next scheduled then establish end of life
shutdowns? overhaul. estimations. End of life
Special point of interest: estimations can be reached;
4) Wastage rates
Repair criteria thresholds play
Stephen Storm
a vital role in the overall main- Understanding the equipment
serves as senior tainability of the boiler. This being evaluated will play the
consultant and team manager criteria is even more critical leading role in your criteria
for the alliance team of United today than in previous years. selection. On a percentage of
Dynamics “AT” Corporation, In today’s economy budgets remaining wall thickness, you
David N. French Metallurgists, are tight and the amount of may be willing to experience
Neundorfer, Inc. and Storm repair work being performed greater degradation before
Technologies. The purpose of in some cases has diminished. reaching repair threshold as a
the alliance team is to assist In lieu of this trend, it is even result of differing pressures however, be cautious of
utility and industry clients in more important that we man- and temperature exposure. operating elements such as
age our repair items, and put The existing life timeframe of fuel switching, soot blower
resolving complex industry our inspection criteria under the piece of equipment is also operational changes, load
challenges which demand a scrutiny. Understanding that important. Wastage rates can variations, etc.
holistic approach. The result of we cannot fix everything, we be used to determine remain-
this team approach provides need to maintain consistency ing life using more than 1 Another key factor to consider
sustainable, reliable, efficient in how we justify our repair data point. The length of time in regard to criteria is consis-
and environmentally sound items. The following 4 consid- before the next scheduled run tency. We have to remain
operations. erations should be reviewed is also important. Repair consistent on our criteria
prior to developing criteria for criteria should be adjusted thresholds and selection.
Stephen Storm, Inc. a particular piece of when run durations increase. Budgets are limited and man-
P.O. Box 398 | 234 Glenbrook Springs equipment: Simply put, if you have to run power can be scarce at times
New London, NC 28127 longer without a tube leak, on our overhauls. Use your
Mobile: (704) 796-2349
1) Component specs (i.e., you will need to upgrade your criteria to effectively address
Office: (336) 461-3015
pressure, temperature, repair criteria on the higher priority items earlier
stephen@stephenstorm.com scheduled overhaul.
soot blowers, fuel). Continued on next page

THE ALLIANCE TEAM


United Dynamics “AT” Corporation David N. French Metallurgists Storm Technologies, Inc. Neundorfer, Inc.
A proven industry leader in utility A full service metallurgical lab A full service and results-oriented A consulting organization serving
boiler inspection and educational offering the latest technology engineering firm providing boiler power utilities and process-based
training services. All UDC field with a state of the art laboratory consulting services, comprehen- heavy industry. The qualified
inspection assessors are trained and facility, experienced staff, sive testing and firing system staff of Neundorfer offers exten-
certified through the AABA (American publications, and educational optimization components. Storm’s sive knowledge and practical
Association of Boiler Assessors) and conferences. DNFM is available manufacturing division provides hands-on experience on
consistently provide the highest to provide all of your high quality performance parts electrostatic precipitators,
quality inspection services metallurgical service and components for various fabric filters (baghouses)
available in the industry. solutions. applications. and flow modeling.
U n i t e d D y n am i c s Looking Ahead...
A d v a n c e d T e c h n ol o g i es
Fossil Generation HRSG Generation Wind Generation Biomass Generation
2681 Coral Ridge Road
Brooks KY, 40165 The future of the power generation industry as a whole will likely be redefined in our
lifetime. The picture of the future trends are emerging and the new direction for the
Phone: 502-957-7525
industry is becoming clearer. We, as leaders are obligated to take a closer look at
Fax: 502-957-5441 the various resources available for power production.
E-mail: Sales@udc.net
The positive effect of the cleaner coal technologies will no doubt play an important
role in the forward momentum and serve as an avenue for smooth transition to new
sources of power generation.

Visit on the web The current trend across the industry is the adoption of unit cycling along with
constant fuel changes, aging existing units and push for continued operation with

www.udc.net fewer shutdowns due to minimized budgets. The result: A call for a holistic approach
to maintenance practices. This holistic approach will tie together all the areas of
operations in order to optimize these valuable assets.

The Name Behind The Flame The overall picture of plant efficiency, availability, emissions and safety which are
solely determined by process inputs and outputs from the coal yard to the stack,
propel the dynamic of this holistic approach. The decision making process for the
maximization of the life of our assets demands we do not suffer lost opportunity.
Therefore we must take into consideration all economic and operating benefits
involved in the overall process and weigh the available options to strategically
manage the asset.

Communication across all areas of generation as well as data compilation and cross
referencing is a must as we move forward to the most efficient power production
possible.

What “Priority Designation” would


CONTINUED FROM PAG E 1
you assign to this inspection In the shutdown. Use your Utilize a repair criteria that
item? criteria to prevent performing fits your program; for exam-
lower priority repairs while ple, some systems will use
canceling higher priority Priority 1, 2 ,3. While other
repairs at the end of the over- elect to use A, B, C. The
haul due to time and funding. important factor to con-
sider is the interpretation of
those criteria lists. Priority 1
for example, should reflect a
certain tube failure or
safety concern before the
next scheduled shutdown.

A breakdown within each


criteria could also be a
benefit. For example, UDC
currently uses an
“Inspection Prioritization
Matrix” that qualifies each
and every repair to better
The inspection team leader or equip the team leader, and
boiler system owner can use allow for optimized deci-
the inspection items found sions. Some P1 repairs may
Written By: and the criteria designation be of greater concern based
Jon Santino Cavote applied to develop the plan of on the severity and/or ac-
Chief Operating Officer/President action on these items. cessibility options available.
Sherri L. Hart
Manager Sales, Marketing, Education

Вам также может понравиться