Вы находитесь на странице: 1из 6

We reserve all rights in this document and in the information contained therein.

Reproduction, use or disclosure to third parties without express


authority is strictly forbidden. Ó ABB

ABB India Limited.


Phone : +91-80-22948647
IT Park, South Wing, Plot No.1/2/3/4
Fax :
Rajajinagar Industrial Estate, Bangalore - 560 010

DOCUMENT TRANSMITTAL
To,
Indian Oil Corporation Limited Dated : 23.08.2014
Gujarat State Office Our Ref : IOCL/TAS/DUM-029
‘Indian Oil Bhavan’ Your Ref : 24183062
205,Near Sola Flyover , SG Highway , Dated : 20 Jun 2014
Sola , Ahmedabad – 380060.
Page No. : 1 of 1
Attn: Ms. Pradnya A Nikam,
Engineering Officer

PROJECT NAME : Upgradation of Terminal Automation System at Dumad Terminal in Gujarat

Dear Sir, Information Only


Review
We enclose herewith documents listed below for Approval/Comments
Enquiry
Upgradation of Terminal Automation System at
Placement of Order
Dumad Terminal in Gujarat.
As Built
Other Purposes

No. of
S. No Document / Drawing No. Description Rev No. Purpose Copies
Pages
System Configuration
1 3BYN560906-SCD 6 0 Approval
Drawing

Remarks / Notes:
Each set contains: : ( Description of Drawing )

Yours sincerely
Please return Acknowledgement copy duly For ABB India Limited

Signed :

Signatures :

Date: Meera Kamal


Project Manager
ESSAR PROJECTS (INDIA) LTD
IOCL MB LAL PROJECT

Name of the Vendor ABB INDIA LIMITED

Document Title System Configuration Drawing

Vendor Document No. 3BYN560906-SCD Vendor Rev 1

IOCL PO No. 24183062

Location DUMAD TERMINAL

Equipment Tag Nos.

Base Descipline INSTRUMENTATION

PROJECT DOCUMENT NUMBER

3BYN560906-SCD 1
Document Number Revision

0 19.07.2014 ISSUED FOR APPROVAL AK RRK NS


Prepa Checked Approved
Rev Date Purpose of Issue
red by by by
LSTK-A ENGINEERING REVIEW
Document Status Code Comments

1 - Rejected (Revised and Resubmitted)

2 - Comments as Noted (Work may proceed subject to


acceptance and incorporation of comments by
CONTRACTOR)

3 - Minor Comments Acceptable (Minor comments


Work may proceed subject to compliance with and
Incorporation of comments)

4 - No Comments/Final (Work may Proceed)

5 - Information only (Accepted for Information only)

Permission to proceed does not constitute acceptance of approval of design details, calculations, analyses, test
methods or materials developed/ selected by the CONTRACTOR and does not relieve the CONTRACTOR from full
compliance with AGREEMENT obligations.
Reviewed by :

Name of the Dept.


Date
Sign & Name of the D D M M Y Y
Engineer
9224-VEN-001-R00
PROJECT: UPGRADATION OF TERMINAL AUTOMATION SYSTEM
AT
IOCL DUMAD TERMINAL
ABB
TITLE :System Configuration Drawing DOC. NO. : 3BYN560906-SCD

Comment Resolution Sheet


Sr. No. Essar Comments ABB Reply

Confirm for Existing CCTV Workstation Confirmed, Exisiting CCTV interface to ESD system
1

Where is the Security Room Interfacing During Site Survey noticed that, there was no system
2 availablity for intefacing of security room.

1.A engineering workstation with Confirmed & noted, Specified in the Techincal notes.
engineering,maintenance and associated Refer Revised Drawing -Rev01.
software essential for set up configuration,trouble
shooing and maintenance.
2.TAS PLC shall have following redundancies
-Processor redundancy
-Communication Redundancy
3
-Power supply redundancy.
3.Safety PLC shall have following redundancies with
TMR/QMR Architecture
-I/O redundancy
-Communication Redundancy
-Power supply redundancy

This Cable shall be Serial link Cable Incorporated, Refer revised Drawing-Rev01
4
LEGENDS :-

ABBREVIATIONS:- TECHNICAL NOTES :-

Reviewed By Issued Dept


Description:
Approved By
Degn. Chkd by Yr Wk Project:
Dwg Chkd By
Rev. Sheet
Drawn By ABB REF No:
Scale Con.
No. Revision Appd Year Wk ABB Automation Drawing No:
PWR PWR
ERR ERR
RUN RUN

P/S P/S
BATT BATT

SD SD

RESET RESET

TOGGLE TOGGLE

RUN RUN
STOP STOP

1 1 L+ 1 1 L+
ETH4 ETH2 2 2 L+ ETH4 ETH2 2 2 L+

3 3 M 3 3 M

4 4 M 4 4 M
5 5 FE 5 5 FE

6 6 6 6
SEF 7
SEF 7
SEF 7
SEF 7
8 8 8 8

9 9 9 9
ETH3 ETH1 ETH3 ETH1

F F F F

R R
R R
P P

Tx1 B Tx1 B

P RIN P RIN
Rx1 DUAL Rx1 DUAL

Tx2 Tx2
INIT INIT

Rx2 Rx2

Tx Tx Tx Tx Tx Tx Tx Tx

CI853 CI853
Rx Rx Rx Rx Rx Rx Rx Rx

L+ L+

L- L-

SA SA

SB SB

CN1 CN2 COM3 COM4 CN1 CN2 COM3 COM4


CON1 CON2 CON1 CON2

Reviewed By Issued Dept


Description:
Approved By
Degn. Chkd by Yr Wk Project:
Dwg Chkd By
Rev. Sheet
Drawn By ABB REF No:
Scale Con.
No. Revision Appd Year Wk ABB Automation Drawing No:

Вам также может понравиться