METHOD
D STATEME NT FOR STA
ATIC PILE LO
OAD TEST 

(LO
OADING TEST) 

PRO
OJECT: STA RTS PHNOM
MPHENH HO
OEL 

LOC
CATION: PH
HNOMPENH
H – CAMBODIA 

Noovember, 20
015 

         

00  30/11/20
015  1st Issuance  TTHM
M  NXD 
Rev  Date  Deescription  Prepareed by  Revieweed & Approved by 
   


 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
1. Introductio
on 

Thiss document describes tthe methodds and equip pment used
d in static looad 
com
mpression teesting of fou
undation pi le using equ
uipment specifically deeveloped fo
or 
the purpose. 

2. TTest Objecttives 

Instrumented SStatic Pile Lo
oad Tests a re carried o
out to deterrmine: 
- Bea
aring capacity of the tessted pilot piiles 
- The Load‐Settleement behaaviour of tessted pilot piiles 
3. Load test P
Principle 

The  test is carrried out by applying static axial load to the  pile head sso that thee pile 


penetrates into o the groun nd. The axiaal load is created by on ne or moree hydraulic jjacks 
settting on top oof the pile aand acting aagainst a reaction syste
em. 
4. Equipmentt 
The  test  equip
pment  consists  of  appaaratus  for  applying 
a loa
ad,  reactionn  system  and  a 
systtem of moveement meaasurement.
a. App
paratus for applying lo
oad 
The  apparatus  for applyin
ng load conssists of hyd
draulic jack((s) poweredd by a hydraulic 
pum
mp with preessure gauge. The folloowing apparratus for ap pplying loadd will be use
ed in 
the test: 
 5 H
Hydraulic jaack(s): maxim
mum load 8
8,000kN/Jacck. 
 1 H
Hydraulic puum: Maximum Operatiion Pressuree of 10,000
0psi. 
 1 P
Pressure ga uge: Pressu
ure range 0‐‐60 Mpa 

   

 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 

   
Installation
I n of hydraullic Jacks and
d dial gagees 
b. Reaaction system 
The  reaction  system 
s con
ntains  test  beam  (maain  beam),  cross  beaam,  Kent  le
edge 
(deaadweight off concrete b
blocks) and  ground ancchorage (scrrew piles). 
Apppendix  I‐“Teest  Layout  and  Setupp”  present  a  detailed
d  calculatioon  and  tessting 
arraangement oof each pile size: 
- Apppendix I‐1 –RReaction Syystem Capacity ‐ Ancho or pile detaails and capa acity 
(com
mpression  and 
a tensio n)  are  estiimated  from  the  Geootechnical  data 
madde  availablle  by  Cliennts.  Also  included 
i iss  the  field  load  testt  for 
verif
ification of a
anchor pile  capacity 
- App
pendix I‐2 – Example off Testing Arrrangementt is illustrateed including
g the 
deta
ails dimensiion and num
mber of each member 
 
 

 

 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
Insstallation o
of anchor piiles 
The  ground  an nchor  consists  of  stee l  tube  segm
ment  of  3mm  with  screewing  blade es  of 
400mm.  The  screw  piles  are  installeed  into  the  ground  byy  using  a  toorque  conve erter 
mou unted on a excavator aand powereed by the hyydraulic systtem of the eexcavator. Each 
screew  pile  is  installed  to  a  pre‐deteermined  de epth  with  the 
t applyin g  torque  being b
mon nitored  and d  recorded  to  ensure  it  has  sufficient  capaccity.  The  sc rew  piles  serve 
s
the two purposses: 
- Befoore  the  test  while  buiilding  up  th he  Kent  led
dge  (stackinng  the  conccrete 
bloccks),  the  scrrew  piles w
will  support  all  the  weiight  of  the  Kent  ledge and 
elim
minate the p possibility off excessive settlement and instabiility (Kent leedge 
colla
apsing).  Du uring  this  sttage,  the  sccrew  piles  support 
s thee  Kent  ledg
ge  by 
mob bilizing the compressivve capacity.
- Durring  the  loa
ad  test,  the  uplifting  force 
fo from  the 
t hydraullic  jacks  wiill  be 
balaanced  by  fiirst  the  Kennt  ledge  (w
weight  of  co
oncrete  bloocks);  once,,  the 
uplif
ifting force reaches thee capacity o of the Kent ledge, the ffurther reacction 
is prrovided by tthe pull‐outt (tension) ccapacity of tthe screw piiles.  
 

 
Insttallation off loading fra
ame 
Usin
ng  the  com
mbined  systtem  of  groound  ancho
or  and  Ken
nt  ledge  haas  some  major 
m
advaantages oveer the pure Kent ledge : 
- Usin
ng less deaddweight as  reaction, th
his leads to the safer ttesting proggram 
with
h  significan
nt  improvem
ment  in  terrm  of  accid
dent  prevenntion  and  Kent 

 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
ledgge collapse. The deadw
weight is firm
mly supportted by grounnd anchors thus 
reduucing the ground movvement duriing testing  – improvingg the quality of 
setttlement readdings. 
- The  reaction  comes 
c from
m  both  deaadweight  an
nd  ground  anchors  hence 
allowing a mucch higher teest load. 
- Minnimize  the  ground  ppreparation  (ground  strengtheni
s ing  –  suchh  as 
commpacted cru ushed stone,, steel platees and in so
ome cases stteel or conccrete 
piless) to supporrt the Kent lledge system. 
- Costt  effective  since  a  ssizeable  po
ortion  of  test  expensse  comes  from 
f
tran
nsportation and handlinng of deadw weight.  
On  each  test  site, 
s prior  to 
t setting  uup  the  reacction  system
m,  one  anchhor  pile  will  be 
testted for bothh compression/tensionn to verify tthe capacityy. The testinng procedu ure is 
show wn in Appendix I‐1. 
 
The design
n drawings classic reacction system
m  


 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
 

      

 

 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
 

  
Main b
beam

Cross beeam

Base block   

 
Instaallation of b
beams and b
blocks 


 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
c. Systtem of Movvement Meeasurementt 
The  system of  settlement measurem ment consistts of by 4 diial gauges pplaced firmlly on 
the  two stable reference  beams. Thee referencee beams should be staably installe ed to 
ensu ure  no  influence  of  soil 
s movem
ment  or  defformation  of  equipmeent.  The  4  dial 
gaugges with maximum strroke 100 m m accuracyy 0.01 mm w will be usedd for measu uring 
setttlement of p pile head.  
Furtthermore,  observation
o ns  of  any  m
movements  of  the  reference  fram
me  will  be  made 
m
by  llevelling  orr  other  method  conseented  by  th
he  Employe er’s  Repressentative  an
nd  a 
checck shall be  made of the movemennt of the pile head rela ative to an  external daatum 
duriing the proggress of the e test. 
Befo
ore  testing,,  the  inspecction  and  ccalibration  certificates 
c of  the  diall  gauges  will  be 
subm
mitted to thhe Owner and Consultaant. These ccertificates are attacheed hereinaftter.  
5. TTest Proced
dure 
a. Preparration workks 
Befo
ore testing, the following works shhould be prrepared: 
- Testt site preparration: cleaaring, levelling and draiining of the 
e ground; 
- Prep
paration forr test pile hhead: removving and recast the pille head – th
his is 
done by piling ccontractor;
- Mob
bilization off test equipm
ment to tesst site; 
- Insttallation of ttest equipm
ment;  
b. Loading procedurre 
eloading 
1) Pre
Prelloading  will  be  carried  out  beefore  testing  for  che
ecking  opeeration  of  test 
equipment and d for making good connnection between test beam and  hydraulic jaacks. 
The  preloadingg  will  be  performed  by  application  of  about  5%  oof  design  load, 
l
maintaining forr 10 minute es and then  fully unload
ding. 
   


 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
2) Staandard load
ding proced
dure 
The  loading  annd  unloadinng  shall  be  carried  outt  in  stages  as  shown  iin  below  Taable. 
Follo
owing each h applicationn of an incrrement of lo oad the load shall be hheld for nott less 
thann the period d shown orr until the raate of settlement is less than 0.2 5 mm/hr and is 
slow
wing down.  The rate off settlemennt shall be ccalculated frrom the sloope of the ccurve 
obtaained  by  plotting  values  of  settleement  versu
us  time  and d  drawing  aa  smooth  curve 
c
thro
ough  the  points.Each  stage  of  u nloading  sh hall  procee ed  after  thee  expiry  off  the 
periiod shown in the below w Tables: 

Table 1 –– Working  Load Test 
 
Loadd(kN) 
C
Cycle  Hoolding Time 
(T
Tension & CCompressioon) 
0.25x Wo rking Load 300 minutes 
0.50x Wo rking Load 300 minutes 
0.75x Wo rking Load 300 minutes 
1.00x Wo rking Load 6 Hours 
C
Cycle 1 
0.75x Wo rking Load 155 minutes 
0.50x Wo rking Load 155 minutes 
0.25x Wo rking Load 155minutes 
00  3 Hours 
0.50x Wo rking Load 300 minutes 
1.00x Wo rking Load 300 minutes 
1.25x Wo rking Load 300 minutes 
1.50x Wo rking Load 300 minutes 
1.75x Wo rking Load 300 minutes 
2.00x Wo rking Load 224 Hours 
C
Cycle 2 
1.75x Wo rking Load 155 minutes 
1.50x Wo rking Load 155 minutes 
1.25x Wo rking Load 155 minutes 
1.00x Wo rking Load 155 minutes 
0.50x Wo rking Load 155 minutes 
00      6 Hours 
At thee end of Cycle 2, the rresidual setttlement shaall be meassured until  the recovery rate 
less th
han 0.1mm//hr observe ed in a periood of not lesss than 15 m
minutes.  
   


 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
3) Pro
ocedure of data record
ding 
The reading freequency is sshown in th e below Table as stipulated in thee Specificatiions. 

Instrume
ent  ency of Moonitoring 
Freque
After 5min, 
A 10 min, 15  min and every 
Dial Gagge  15 minutees 
thereafterr 
After 5min, 
A 10 min, 15  min and every 
Hydraulic Presssure Gage  15 minutees 
thereafterr 
Optical Le
evel  Evvery 60 min utes 

 
i. Abandonm
ment of load
d test 
Testt shall be discontinued if any of thhe followingg occurs: 
 Pre‐jacking or pre‐lo
oading befoore the com
mmencemen
nt of the tesst 
 Impropeer setting off datum 
 Disturbeed or unstab
ble bench m
marks or scaales 
 Faulty off pile cap orr instability  of the kenttledge 
 Failure o
of concrete to reach th e design co
ompressive strength 
 Faulty jaack or gauge
e. 
 Pile head
d crack or b
broken. 
 Initial readings are incorrect. 
ii. Failure of ttest pile 
The  test pile sh
hall be deemed to havve failed if  any one of the follow
wing criterions is 
reacched: 
- Pile materiaal is brokenn; 
- A settlemen
nt ≥10% pilee diameter;; 
- The  rate  of  settlem
ment  contin
nues  undim
minished  w
without  furrther 
increment oof load. 
- Residual settlement >==1/2 Total se
ettlement 
6. TTest Resultts 

10 
 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
The test resultss willbe presented in tw
wo formats, tabular an
nd graphicall. 
a. Tabular form 
The  data includding readings of load,  time and settlement ttaken and rrecorded du uring 
testting for tested pile shalll be presennted in "Pile
e Load Test Record" annd “Summarrised 
Testt Results”.   
b. Graphical form

From
m the test d
data, the following curvves shall be
e established: 
 Load ‐ Seettlement C
Curve 
 Settlemeent ‐ Time C
Curve 
 Load ‐ Tiime Curve 
 Load ‐ Seettlement ‐ Time Curvee 
c. Textt part 
In th wing conten ts should be mentione
he text partt, the follow ed: 
 Introducction; 
 Details o
of test pile; 
 Test purp
rpose; 
 Test metthod; 
 Test equ
uipment; 
 Loading procedure; 
 Test resu
ults; 
 Conclusiions and reccommendattions.   
d. App
pendices  
In th
he appendixx part, the ffollowing coontents sho
ould be men
ntioned: 
 Recordin
ng sheets off test data;
 Layout o
of test piles;; 
 Documents of soil cconditions;
 Certifica
ates of test eequipment.
7. Safety at W
Work 

11 
 
KH
HMER D&C TECHN
NICAL CO
ONSULTA
ANT co.lt
td
Address :  No.D15, Stre
eet Betong, Sangkat toul Sanngke, Khan Russsey Keo, Phno
ompenh

KMOR
RE THA
AN YOU
UR NEEDS 
 
 
During  testing,,  besides  obeying 
o reggulations  off  safety  at  work  in  coonstruction,,  the 
follo
owing rules should be o observed:
 No entryy to test sitee for unauthhorized peop
ple; 
 All buildiing waste, m
mud, oil… oon test area should be ccleaned; 
 It  is  neccessary  to  have 
h protecction  metho
od  for  test  equipment 
t  from  rain,  sun 
shine; 
 Hydrauliic jacks, pummp, system  of hydrauliic hoses, vallves and connnectors sh
hould 
periodiccally checkeed and cleanned. Replacce timely the
e damaged  parts; 
 The mob bilisation an
nd de‐mobiilisation of kkentledge a
and test eq uipment sh
hould 
safety, d
do not block public traf
affic; 
 Should  have 
h safetyy  method  ffor  installattion  of  kentledge.  Peoople  stay  under 
crane and in opera
ation area of
of crane 
At eeach site, a  dedicated  safety officcer will be aassigned full‐time. Thiss employee e will 
be  iin  charge  of 
o all  HSE  re
egulations  aand  has  the
e  authority  to  stop  woork  if  necesssary 
untiil correctivee action and d preventionn in‐place.
8. Certificate of equipme
ent and layo
out for worrking pile 
- Appendix I‐‐“Test Equippment Certificates” 
- Appendix II‐“Layout foor working p
pile” 
 
 
 

12 
 
Reaction Capacity for D 1400 mm ( 2 cycle Type: 1640 ton x 1,2 = 1968 ton).

Unit Capacity Total Capacity


No Description Quantity Remarks
(ton) (ton)

1 Test Beam 1 15 15 1,800x600x12,000


2 Cross Beams 16 3,5 56 900x300x12,000
3 Sleeper Beams 6 3 18 600x600x12,000
4 Base Blocks (4,6 ton) 28 4,6 128,8 1,000x1,000x2,000
5 Weight Blocks 138 4,6 634,80 1,000x1,000x2,000
6 Screw Anchor Piles 56 20 1.120,00 8m
Total Uplift Reaction Capacity (tons) 1.972,60
Test load = 1968 Ton <<1972,6 Ton.
Reaction Capacity for D 1200 mm ( 2 cycle Type: 1300 ton x 1,2 = 1560 ton).
Unit Total
No Description Quantity Capacity Capacity Remarks
(ton) (ton)
1 Test Beam 1 15 15 1,800x600x12,000
2 Cross Beams 12 3.5 42 900x300x12,000
3 Sleeper Beams 6 3 18 600x600x12,000
4 Base Blocks (4,6 ton) 20 4.6 92 1,000x1,000x2,000
5 Weight Blocks 112 4.6 515.20 1,000x1,000x2,000
6 Screw Anchor Piles 44 20 880.00 8m
Total Uplift Reaction Capacity (tons) 1,562.20
Test load = 1560 Ton <<1562.2 Ton.