REEFER PROCEDURES April 2010

PTI GUIDELINE for Lindt cargo REEFER


DEPARTMENT

By Sylvain ONO DIT BIOT

This guideline must be respected in case of demand from Agency about a specific
customer. You can find in this guideline the same instruction as a normal PTI for a
reefer plus the additional control for sensitive cargo.
This Pti is done to take a maximum precaution about the status of the reefer and to
assure a perfect condition during the Trip.

Each steps of Additional Actions for PTI must be respected

1) The age of the container should not excess 8 years

2) The structure of the reefer must be in perfect condition (gasket patch seal
ect...) in case of doubt the container will be rejected

3) The roof must be imperatively checked by the depot and in good


condition.

4) Before the release to the trucker, the depot must check there is no
humidity in the container. In case of humidity, the container must be dried.

5) No “major corosion” on the external structure of the container accepted.


Patch are accepted but must be “double checked” by the depot and must
be perfectly watertight.

6) Before the PTI the container must run 30 minutes at -18°c (to inc rease
pressure of gas) A full control (outside/inside) of leaks gas will be done with an

PTI + PROCEDURE FORDEPOT


electronic detector. The depot will be liable about the good condition of the
piping.

7) An auto Pti must be launched on the reefer

8) All drains (inside the container and drain tubes for defrost) must be washed
and cleaned.

9) The possibility of download must be check and tested (plug cable soft ect...)
no impossibility to extract the data will be permitted.

10) The save battery must be in perfect order and perfect charged.

11) The correct charge of gas will be duly verified, and in case of any doubt a
process to extract and reload will be done to back to correct value.

12) No important corrosion will be accepted Compressor and condenser must


be in good condition .

13) The version of the data recorder soft must be controlled and adjusted to the
right one

14) The dehumidify sensor must be check and must be in good condition.

For information we repeat the normal process for Pti on Mira.

In case of PTI, the Auto-PTI must be launched on Data Logger (will be recorded).

This record will prove that PTI has been done,

In case no Record in the Data Logger CMA-CGM will consider the PTI not done

and will keep the depot responsible and liable in case or cargo claim.

GENERALITIES

●Use AUTO-PTI Function - (AUTO-PTI Average Duration : 2,50 Hours).

●If machinery need repair - Check the warranty validity, see here under owned by
CMA-CGM :
►CARRIER Whole unit : 3 years / Fan Motor : 3 years / Compressor : 5
years

PTI + PROCEDURE FORDEPOT


►THERMO-KING Whole unit : 3 years (1 year+2 year exten)/Motor : 3
years/Compressor 3 years
►DAIKIN Whole unit : 5 years / Compressor 7 : years
In case of queries or doubt contact local dealers or M+R Co-ordinators.

Before starting PTI following items must be checked:

●Container Identification Number


Date and Time (GMT)
Software Version

●Machinery must have the recent software upgrade (except particular cases).
●Check the Bolts/ Securing / Covers / Tightness of the Motors and Compressor
● Make sure there is no leakage of Oil / Gas
●Refrigerant Moisture Indicator / Wiring and Cables / Control Box / Electric Terminals
should be verified
●Level of Refrigerant must be checked after 30 minute running (in case of doubt
about low-charge or overcharged).
●Function of Drain Hose, Gutter and Drain Cups must be verified and should be
functional.
●During the container washing the drain tube must be clean in using the high
pressure from steam washing.
●Old PTI Labels or Out of Date PTI labels must be removed

CABLE

●The 380/440 volts power cable should be electrically safe. No cuts or cracks
allowed.
●Quantity of proper splices are unlimited.
●Minimum length should be 12 Mts.
●Check the Plug, if the pin is missing, replacement is mandatory.
●220 Volts power cable + plug on dual voltage machineries should not be inspected /
repaired /extended
.
COMPRESSOR SECTION

●Verify Junction Box.


●Verify Compressor Oil Level
●Compressor guard dented or cut, as long as functional, no action required.
●Service valve caps missing: need to be replaced.

CONDENSOR SECTION
●Blocked coils due to dust or corroded fins must be cleaned by compressed air only.

PTI + PROCEDURE FORDEPOT


ELECTRICAL BOX
●Box should be Wind / Watertight
●Schematics missing: No Action

DATALOGGER
In case of exchange the following data should be set :
Container Identification Number
Date and Time (GMT)
All relays and parts must be properly fitted and attached inside the electric box. No
element must be free off (loose).

EVAPORATOR SECTION

●Motors and Fan: Check for abnormal noise vibration; verify no alarm is active in
controller.
●Drains: Must be free of dirt enabling evacuation of water.

MISCELLANEOUS

●Mainframe: No repairs unless operation is affected or panels/welding holed,


cracked or broken.
●Reefer man advises M+R for the defect seen in first place. Repetitive part failure
must be reported with container ID + part name and ref n° + photos if possible.

PARTLOW

●If the machinery is equipped with a Data-logger and Digital Display below must be
followed up :
- Box should be Wind / Watertight only (if the door is missing, repair only with a
plastic cover).
- Partlow is out of use and does not require repairs / replacement.
- Labels may be ordered / supplied locally.
-In case the Partlow is out of order following label should be fitted on the
partlow door window.

This is to avoid service calls on board vessels or terminals.

PTI + PROCEDURE FORDEPOT