Replenishment
In IS-Retail new type of MRP/RP procedure has been introduced W – Replenishment (IS
Retail) . At the beginning it’s worth to mention that it can be used only for stores and Customers
and not for distribution centers. The solution is quite similar to MRP with reorder point or time
phase planning but I leave it for you to decide at the end of this article.
Configuration starts with setting in article master. First decision is how inventory management is
going to be used for replenishment.
In Replenishment, you have the option of using the detailed inventory management in Materials
Management (MM). Alternatively, you can use Replenishment-Based Inventory Management,
which is designed for a more simplified system. Recommended approach is to use as much as
possible full MM oriented setting which is more accurate and allow more options (like ATP
influence) in calculation of required quantity. On the other hand it has some limitations like the
fact it can only be used on articles with value and quantity update. Second option is mandatory in
case if you have articles managed on merchandise category basis (value-only article).
Calculation of required quantity is much simpler comparing to MM option. Calculation logic is
based only on stock on-hand (anticipated goods receipts might be taken into account if
parameter Correct RS is set in article master data), which by simplifying means expected stock is
equal to stock on-hand. In this article only MM oriented approach is presented.
Second step of configuration is setting up configuration data for store. As in Sap Manufacturing
outcome of MRP is either internal production (production/process orders ) or external
procurement (purchase requisition/schedule line for schedule agreement). In SAP Retail logic is
a bit different and it’s important to decide what type of document is created as result of run of
planning. This information comes from Store Order control parameters which is part of POS
Inbound profile.
Store Order profile
As shown on the screenshot above, system decides what type of document to create based on
source of processing (replenishment or store order) and type of source of supply assigned in
article ( 1 – standard, external, 2 – internal, from distribution center). As mentioned before, Store
Order profile is included in setting of POS inbound profile which is assigned to the site. If no
assignment exist then system by default creates Sales Order type TAV (Standard Order (VMI)).
Additionally different POS Inbound profile can be assigned per merchandise category
Assignment of POS Inbound profile to site/merchandise category
As mentioned POS Inbound profile consists of several settings including beside Store Order
profile as well: Aggregated sales, Sales as per receipts which are used for inbound sales Idoc
communication from POS systems (respectively Idocs: WPUUMS01, WPUBON01). Even if these
settings are not so much important for “classic” replenishment but are very important for multi
step replenishment.
In order to exclude articles that use Replenishment from standard requirements planning, the
articles must be assigned RP procedure W (Replenishment (IS Retail)) via replenishment type.
RP (replenishment)
RF (replenishment with dynamic target stock)
RS (time-phased replenishment)
RR (time-phased replenishment with dynamic target stock)
Replenishment types RS and RR are same as respectively RP and RF beside they are used in
Multi-step replenishment which is described later on.
The major difference between RP and RF is how target stock is calculated. RP type use static
calculation and target stock value is set in logistic view of store in article master data. Future
GR/GI or forecasted sales can be taken into account as an option. This approach is very similar
to MRP procedure reorder point used in for example V1 or V2 MRP types. RF type use dynamic
calculation by automatically calculating the target stock by totaling the predicted consumption
values for the period today plus target range (replenishment parameter set in article master data
in logistic view) of article and store concerned. Target stocks are determined on the basis of
forecasted sales means, a forecast run is a prerequisite for this method.
Calculation example:
Article 906 has RP type RF(dynamic target stock) with target coverage 7 days. Current stock is
10EA. Forecast is done on weekly base for next 3 periods. Based on consumption following
values forecast were calculated:
Planning is run on 07/01 (Sunday) for next 7 days. Forecast for the article for whole week is
21EA. In this case target coverage period is 7 days means is equal to whole week but if
coverage period would be 3 days then system should forecast quantity as 21EA (total forecast
for period)/5 (number of working days) * 3 (number of working days to cover) = 12,6 EA (rounded
to 13EA).
Based on settings in Store Order profile and source of supply of article, STO Purchase Order
should be created as follow-on document.
Multi-Step Replenishment
Special form of Replenishment is multi-step replenishment where whole process has been
divided into two or three steps. The purpose for it is mainly to increase performance by split of
work as limitation it can only be used for stores. Replenishment includes a program for
determining requirements calculation data – compile and save the master data required
for requirements calculation.
requirements calculations – determine requirements.
generate follow-on documents – follow-on documents are generated.
Within multistep replenishment, the two-step procedure only uses the programs for requirements
calculation and follow-on document creation. The program for determining the requirements
calculation data is not used in the two-step procedure. The three-step procedure uses all three of
the programs in multistep replenishment.
To be able to use multi-step replenishment POS Inbound profile needs to be update. This profile
is assigned on site master data or in site/merchandise category level. For both Aggregated sales,
Sales as per receipts field “Update replenishment-based inventory management” must be set to
1 – Special Replenishment-Based Inventory Management.
RP type RR is assigned.
Planned delivery time is 1 day
Source of supply 2 – stock transfer order
Forecast period indication W- week
Forecast historical periods 6
Forecast period 3
Target coverage 7 days
Current stock 100EA
Sales data are sent from POS system via Idocs: aggregated transactions – WPUUMS01,
Individual transactions: WPUBON0 1. (Tables WRPL,WRPT are updated).
POS Inbound monitor. GI not yet posted but available for sales forecast calculation
Display of consumption data and forecasted values. Sum of not posted consumption is 91EA
Logic for determining target stock is the same as described above. Due to current stock is 9EA
(Initially 100EA – 91 EA posted from POS Inbound Idocs) system calculated required quantity to
11 EA. In second (or third depending on approach) step transaction (WRSO) for generation of
follow-on document is run. Based on settings in Store Order profile and source of supply of
article, STO Purchase Order should be created as follow-on document.