Raw Material Preparation and Crushing Improvem

Plant DMC cement


Start Date 1/Dec/20
End Date 31/Dec/21
Duration 395

Task ID Task Description Assigned to Materials


Required

Raw material preparation and crushing


1. Clearing and standardizing the storage area
1.1. Site selection for each material wonde &Dilnesa
1.2. preparation of the selected sites Wonde and team
Basalt Wonde and team
Sand Wonde and team
Iron ore Wonde and team
Gypsum Wonde and team
Pumice Wonde and team
Local Coal (before Lab result) Wonde and team
Local Coal (after Lab result) Wonde and team
Imported Coal Wonde and team
1.3.Stocking according to the Site selection Wonde and team

2. Preparing basalt for the rainy season operation

2.1. Maintain the road to basalt Quarry Melaku

2.2. prepare optimization plan to mine dry Melaku &Dilnesa


basalt during wet season &Wonde
2.3.Preparing the temporary basalt shade
consuming the material &clearing the
storage area wonde and team
Levelling the inside with Dozer wonde and team
maintaining the shades roof and covering
the side walls
Diverting the drainage away from the construction team
shade construction team
2.4. Surround the additive crusher area with
30cm wall and make drainage line construction team
2.5. Investigate water spillage into belt wonde and
tunnels and avoid mechanics
3. Preparing Coal for the rainy season
operation
3.1. Surround the Coal crusher area with
30cm wall and make drainage line construction team
3.2. crush all the coal available and store
inside the shade
3.3. Prepare tarpaulin covers for Coal wonde and team
covering Dilnesa

4. Preparing Pumice for the rainy season


operation
4.1. Prepare tarpaulin covers for pumice
covering Dilnesa
4.2.. Pumice shade ( long term solution) FM

5. Damping Land levelling


Wonde and
Damping site selection and designing construction team
Damping site levelling(concreting) construction team
d Crushing Improvement Plan

Display week 1

1/Dec/20 8/Dec/20

2/Dec/20

6/Dec/20
1/Dec/20

3/Dec/20
4/Dec/20
5/Dec/20

7/Dec/20
8/Dec/20
9/Dec/20
Progress (%) Duration Start Date End Date

T W T F S S M T W
0% 3/Feb/01 26/Nov/20 31/Dec/21

0% 5 26/Nov/20 30/Nov/20
0% 48 12/Jan/21 6/Dec/20
6 1/Dec/20 6/Dec/20
6 7/Dec/20 12/Dec/20
6 13/Dec/20 18/Dec/20
6 19/Dec/20 24/Dec/20
6 25/Dec/20 30/Dec/20
6 31/Dec/20 5/Jan/21
6 6/Jan/21 11/Jan/21
6 12/Jan/21 17/Jan/21
0% 60 10/Dec/20 7/Feb/21
6 4/Jan/00

6 4/Jan/00

20 1/Feb/21 20/Feb/21

6 1/Jan/21 6/Jan/21
0%

0% 10 1/Dec/20 10/Dec/20
6 11/Dec/20 16/Dec/20

15 26/Dec/20 9/Jan/21
30 31/Dec/20 29/Jan/21

6 1/Feb/21 6/Feb/21
6 11/Dec/20 16/Dec/20

6 4/Jan/00

6 8/Feb/21 13/Feb/21

60 1/Mar/21 29/Apr/21
3 1/Mar/21 3/Mar/21

6 4/Jan/00
3 1/Mar/21 3/Mar/21
1/Jan/22 31/Dec/21
6 4/Jan/00
6 4/Jan/00

0% 10 1/Jan/21 10/Jan/21
0% 30 13/Jan/21 11/Feb/21
T
10/Dec/20

F
11/Dec/20

S
8/Dec/20
12/Dec/20

S
13/Dec/20

M
14/Dec/20
15/Dec/20
16/Dec/20

T W T
17/Dec/20

F
18/Dec/20
S
15/Dec/20

19/Dec/20
S

20/Dec/20
M

21/Dec/20
22/Dec/20
23/Dec/20
T W T

24/Dec/20
F

25/Dec/20
S
22/Dec/20

26/Dec/20
S

27/Dec/20
M

28/Dec/20
29/Dec/20
30/Dec/20
T W T

31/Dec/20
T

7/Jan/21
T
29/Dec/20

14/Jan/21
T

21/Jan/21
ec/20

T
28/Jan/21

T
1
4/Feb/21

T
2
11/Feb/21

T
3
18/Feb/21

T
25/Feb/21 week

T
4/Mar/21 4 5

T
6
11/Mar/21

T
7

18/Mar/21