TEST REPORT OF NUMERICAL RELAY

CLIENT OPAL DAHEJ TESTED ON


PLANT CPP TESTED BY
SWBD TAG PMCC-1
FEEDER 4F2, O/G FDR-01 FOR HRSG MCC-1

1.0 Name Plate Details of Relay :

Make Relay MLFB No Relay Serial No. In Aux. Supply


SIEMENS 7SJ626_OG1_HRSGMCC1 4F2 BF1304526236 250/5 A 110V DC

2.0 MEASUREMENT :

VOLTAGE Ratio:- CURRENT Ratio:- 250/5 A


Phase Injected Volts Meas. Volts (KV) Phase Injected Current Measured Current
R-Y - - R 5A 246
Y-B - - Y 5A 247
B-R - - B 5A 248
  N 0 0

3.0 OVER CURRENT CHARACTERISTIC TEST :

Expected Operating time in seconds


SETTING PSM
Time (Sec) R Y B
Ip 5.0 A 2 26.66 27.38 27.38 27.38
TMS - 1.0 - - - - -
Curve EI - - - - -

Expected Operating time in seconds


SETTING PSM
Time (Sec) R Y B
Ip 0.5 A - - - - -
TMS - 1.0 5 3.333 3.421 3.421 3.421
Curve EI 10 0.808 0.622 0.622 0.622

Expected Operating time in seconds


SETTING PSM
Ip Time (Sec) R Y B
(ELCON 7.5 A 2 9.450 9.633 9.633 9.633
SETTING) TMS - 0.7 - - - - -
Curve VI - - - - -

Expected Operating time in seconds


SETTING PSM
Time (Sec) R Y B
Ip 0.6 A 5 3.333 3.420 3.420 3.420
TMS - 1.0 - - - - -
Curve EI - - - - -

I>(50-1) SETTING Phase Inj. Current (Amp) Operating Time

Client Name & Sign. Testing Engineer


R 15.1 0.599 Sec
ELCON SETTING 15.0 A Y 15.1 0.599 Sec
Set Time 0.5 Sec B 15.1 0.599 Sec

4.0 EARTH FAULT CHARACTERISTIC TEST :

Expected Operating time in seconds


SETTING PSM
Time (Sec) E/F
Iep 4.0 A 2 26.66 27.66
TMS - 1.0 - - -
Curve EI - - -

Expected Operating time in seconds


SETTING PSM
Time (Sec) E/F
Iep 0.5 A - - -
TMS - 1.0 5 3.333 3.432
Curve EI 10 0.808 0.834

Expected Operating time in seconds


SETTING PSM
Iep Time (Sec) E/F
ELCON 1.0 A 2 9.450 9.748
SETTING TMS - 0.7 - - -
Curve VI - - -

Expected Operating time in seconds


SETTING PSM
Time (Sec) E/F
Iep 0.6 A 2 26.66 -
TMS - 1.0 5 3.333 3.444
Curve EI 10 0.808 -

Ie> SETTING Inj. Current (Amp) Operating Time


ELCON 5 A 5.1 0.537 Sec.
SETTING Set Time -0.5 Sec  - -

5.0 General check-up :

Sr. No. Description Remarks


5.1 Service setting restored OK
5.2 Marshalling of command relay and signaling relay checked OK
5.3 LED programming checked OK

6.0 Remark : TESTED OK

Client Name & Sign. Testing Engineer