A PROPOSAL

FOR

DEVELOPING PORTABLE LUGGAGE CARRIERS

SUBMITTED TO THE COUNCIL OF DESIGNERS MACHINE DEVELOPMENT


MUMBAI

BY

ROHIT SINGHAL
ELECTRONICS AND ELECTRICAL ENGINEER
IIT KANPUR

DR. A P J A K TECHNICAL UNIVERSITY


LUCKNOW
SUMMARY
1. Proposal Title: A proposal for developing portable luggage carriers
2. Name and Designation of the proposer: Rohit Singhal Mechanical Engineer
3. Address of the Proposer: A-90, Adarsh Nagar Kanpur-526012
4. Name of the institution where the work is to be done: Asheesha Manufacturing Works, Kanpur.
5. (a) Time required for commencement of work: Two months after approval
(b) Duration: Six months after commencement

6. Amount required: Rs. 220,000.00

7. Proposal Summary: The project is envisaged to develop a portable luggage

carrier. It would be a folding system designed to carry the

burden at all places, at all time and for all.


Table of Contents
Summary ............................................................................................ ii

1. INTRODUCTION ............................................................................................................. 2
1.1..................................................................................................................... The Work Done
…………………………………………………..…………………………………………… 2
1.2..................................................................................................................... The Problem
……………………………………………………… …………………………………………….. .................. 2
1.3..................................................................................................................... The
Objective……………………………………………………………………………………………………. .... 2
1.4..................................................................................................................... Scope and
Limitation……………………………………………………………………………………..…................. 2
2. WORK PROPOSED
2.1 Description of the project……………………………………………………………………………………. 3
2.2 Methodology……………………………………………………………………………………………………….. 3
2.3 Significance……………………………………………………………………………………………………….. 3
3. MANAGEMENT
3.1 Facilities Available ………………………………………………………………………………………………
3.2 Facilities Required ………………………………………………………………………………………………

4. COST ESTIMATE……………………………………………………………………………………………………….. ...…..


1. INTRODUCTION
1.1 The Work Done:

With the advancement of civilization the life of man has signed in mobility. When people move from one place
to another, they carry some languages with them. We have porters and luggage carriers made available at the
railway stations and airports.

1.2 The Problem:

Sometimes the hiring of the services of a porter is not advisable, and sometimes the luggage carrier is not available. In such circumstances
people have to face a great problem. They can neither abandon their goods nor carry them.

1.3 Scope and Limitations:

The only factor that can limit the scope of the proposed machine is that since it’s a portable device, it will have its limitations in terms of size and
capacity.

2. WORK PROPOSED:
2.1 Description of the project:

The portable luggage carrier is to be a system that can move some load without causing any inconvenience. It is to be developed on
the following two lines:
(i) The material used should be light (ii) The design should be folding

2.2 Methodology:
The project work will be distributed among the following three units as:
(i) The Design Unit: It will work on the development of a proper design in accordance with the needs
described.
(ii) The Material Unit: It will make experiments to decide which material will be most suitable to retain
the lightness of the Portable Porter.
(iii) The Coordination Unit: It will maintain a link between the above two units.

2.3 Significance:
The project assumes significance in the context of its human and economic benefits. Economically too the project is not only viable
but also profitable.

3. MANAGEMENT:
3.1 Facilities Available: A well equipped workshop at Asheesh Manufacturing Works, Kanpur exists. Power and
water supply is adequate.
3.2 Facilities Required: Manpower requirements will consist of two skilled and five semi-skilled technical
personnel.

4. COST ESTIMATE:

Name of Unit Cost


product/service
Equipment 3 90,000.00
Raw Material 10,000.00
Wages 100,000.00
Travel 5,000.00
Contingency 15,000.00
Total Cost: 2,20,000.00