: TOK-QCP-DU-01
Rev. : 2
PROJECT NAME: TOKUSHIMA Date : 18-Feb-2021
*This quality inspection plan is intended to inform the vendor about the minimum extent of inspection foreseen for the order by SPG DC Contractor, Client and/or their representatives.
General
*Vendor is required to issue own Inspection and Test Plan (ITP) and develop necessary quality procedures in accordance to applicable Client and SPG DC requirements specified in SPG DC Technical Purchase Specification (TPS)
Note:
*Applicable Client Technical Specifications are listed in SPG Technical Purchase Specification TPS2000
*3 *3
Abbreviation: RD = Review Documentation RI = Random Inspection WP = Witness Point HP = Hold Point NA = Not Applicable; TPS = SPG Technical Purchase Specification DSH = Data Sheet BoM = Bill of Material
*1 *2
CLIENT Owner Third Party
Posco SPG DC Remarks
Pos. Rev. Test description Evaluation Procedures Evaluation criteria Verification documents
Inspection
Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date
Frequence
1 VENDOR APPROVAL
2 DESIGN
ITP comply with SPG TPS4010, SPG QCP4010, ASME VIII Div.1, and Approved Posco
3.1 ITP /QCP Review Posco ITP /QCP HP RD N/A RD RD
structural AWS D1.1 + Client Specifications
ITPs
WPQRs comply with ASME IX for pressure parts and AWS D1.1 for
3.3 WPQR Review Approved WPQRs RD N/A RD RD
structural parts, SPG TPS4010 + Client Specifications
Posco WPQRs HP
WPSs comply with ASME IX for pressure parts and AWS D1.1 for
3.4 WPS and Welding Map Review structural parts, SPG TPS4010 + Client Specifications. WPS certified Approved WPSs HP RD N/A RD RD
Posco WPSs and Welding Map by WPQR.
Welder Qualification Certificates Welder Qualification Certificates comply with ASME IX for pressure Approved Welder
3.5 Posco Welder Qualification Certificates parts and AWS D1.1 for structural parts, SPG TPS4010 + Client HP RD N/A RD RD
Review Specifications Certificates
- Visual Testing Procedure for Ducting VT Procedure comply with ASME VIII Div.1, ASME section V Article 9
3.7 Posco Visual Testing Procedure and AWS D1.1 for structural parts, SPG TPS4010 + Client Approved VT Procedure HP RD N/A RD RD
- Visual Testing Procedure for Specifications
structural parts
Dimensional Control Procedure Procedure comply with ASME VIII Div.1, and AWS D1.1 for structural Approved Test
3.12 Posco Dimensional Control Procedure HP RD N/A RD RD
parts, SPG TPS4010 + Client Specifications
Review Procedure
QUALITY CONTROL PLAN FOR DUCTING Doc. : TOK-QCP-DU-01
Rev. : 2
PROJECT NAME: TOKUSHIMA Date : 18-Feb-2021
*This quality inspection plan is intended to inform the vendor about the minimum extent of inspection foreseen for the order by SPG DC Contractor, Client and/or their representatives.
General
*Vendor is required to issue own Inspection and Test Plan (ITP) and develop necessary quality procedures in accordance to applicable Client and SPG DC requirements specified in SPG DC Technical Purchase Specification (TPS)
Note:
*Applicable Client Technical Specifications are listed in SPG Technical Purchase Specification TPS2000
*3 *3
Abbreviation: RD = Review Documentation RI = Random Inspection WP = Witness Point HP = Hold Point NA = Not Applicable; TPS = SPG Technical Purchase Specification DSH = Data Sheet BoM = Bill of Material
*1 *2
CLIENT Owner Third Party
Posco SPG DC Remarks
Pos. Rev. Test description Evaluation Procedures Evaluation criteria Verification documents
Inspection
Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date
Frequence
Procedure comply with ASME VIII Div.1, Ducting drawings, SPG Approved Test
3.13 Trial Assembly Procedure review Posco Trial Assembly Procedure N/A
TPS4010 + Client Specifications
Procedure HP RD RD RD
Painting Procedure incl paint material Posco Painting Procedure comply with SSPC or ISO 12944, Surface N/A
Posco Painting Procedure; Preservation
3.14 DSHs and manufacturers; preparation Sa 2,5 ISO 8501-1, (for preservation Sa 2), and SPG Approved Painting Procedure HP RD RD RD
Procedure
Preservation Procedure (anti-rust) TPS4010 + Client Specifications
Shipping, Packing & Marking Posco Shipping, Packing & Marking Approved
3.15 SPG TPS4010 + Client Specifications HP RD RD RD
Procedure review Procedure Procedure N/A
4 MATERIAL
5 MANUFACTURING INSPECTION
Venodor Ducting Drawings Comply with Ducting Drawings, Posco WPS, VT and Signed QCP or
5.2 Assembly, Fit-up Inspection HP RD N/A RD RD
Posco WPS, VT procedure Dimensional control procedure, ASME VIII Div.1, AWS D1.1 Weld Log
Signed QCP or
5.3 Welding monitoring Posco WPSs Welding comply with Posco WPSs and performed by certified welder HP RD N/A RD RD
Weld Log
Comply with ASME VIII Div.1, ASME section V Article 9, WPSs, AWS
5.4 VT examination of All welds Posco VT procedure VT report HP RI 10% RD RD
D1.1 for structural parts, Drawings, TPS4010
QUALITY CONTROL PLAN FOR DUCTING Doc. : TOK-QCP-DU-01
Rev. : 2
PROJECT NAME: TOKUSHIMA Date : 18-Feb-2021
*This quality inspection plan is intended to inform the vendor about the minimum extent of inspection foreseen for the order by SPG DC Contractor, Client and/or their representatives.
General
*Vendor is required to issue own Inspection and Test Plan (ITP) and develop necessary quality procedures in accordance to applicable Client and SPG DC requirements specified in SPG DC Technical Purchase Specification (TPS)
Note:
*Applicable Client Technical Specifications are listed in SPG Technical Purchase Specification TPS2000
*3 *3
Abbreviation: RD = Review Documentation RI = Random Inspection WP = Witness Point HP = Hold Point NA = Not Applicable; TPS = SPG Technical Purchase Specification DSH = Data Sheet BoM = Bill of Material
*1 *2
CLIENT Owner Third Party
Posco SPG DC Remarks
Pos. Rev. Test description Evaluation Procedures Evaluation criteria Verification documents
Inspection
Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date
Frequence
NON-DESTRUCTIVE TESTING OF
6
WELDS
- Longitudinal & circumferential; Comply with ASME VIII Div.1, ASME section V Article 6, SPG N/A
6.1 Posco Dye Penetrant Testing Procedure PT report HP RD RD RD
- Nozzle welds TPS4010
N/A
*4RT of longitudinal, circumferential Comply with ASME VIII Div.1, ASME section V Article 2, SPG
6.2 RT Report HP RD RD RD
and nozzle butt welds (5%) TPS4010
Posco Radiographic Testing Procedure
*4UT of longitudinal, circumferential
N/A
and nozzle butt welds (5%) Comply with ASME VIII Div.1, ASME section V Article 4, SPG
6.3 Posco Ultrasonic Testing Procedure UT Report HP RD RD RD
*UT testing is acceptable only if RT is TPS4010
not possible
Posco Magnetic Particle Testing N/A
6.4 *4PT or MT of Structural Welds (10%) Comply with AWS D1.1, ASME section V Article 6 or 7, SPG TPS4010 PT or MT report HP RD RD RD
Procedure
7 DIMENSIONAL TESTING
Trial assembly & Dimensionnal check Ducting drawings, Posco Trial assembly
7.1 Comply with Ducting drawings, Trial assembly procedure Test report HP *3WP 100% RD RD
(1 per type) procedure
Dimensional check
Dimensions comply with ducting Drawings, Posco Dimensional Control
General Visual inspection incl. fixation Ducting Drawings, Posco Dimensional 100%
7.2 Procedure, ASME /AWS requirements No visual defects, mechanical Test report /As built drawings HP *3WP RD RD
materials, supports
damages, excessive grinding…
Control Procedure
Painting inspection:
- Touch-up
Other Painting Inspection such as Comply with SSPC or ISO 12944, Surface preparation Sa
8.2 Posco Painting Procedure 2,5, ISO 2409, ISO 4624, SPG TPS4010 + Client Painting Manufac. Report HP RD N/A RD RD
Cross-cut, pull-off test, Mock-up etc (1
per paint batch).
Specifications
Preservation Visual Inspection
Posco Painting or Preservation Posco Procedure comply with SPG TPS4010 + Client
(100%):
8.3 - Surface Preparation Check Procedure Specifications, Surface preparation Sa 2 ISO 8501-1 Signed QCP HP RD N/A RD RD
*3 *3
Abbreviation: RD = Review Documentation RI = Random Inspection WP = Witness Point HP = Hold Point NA = Not Applicable; TPS = SPG Technical Purchase Specification DSH = Data Sheet BoM = Bill of Material
*1 *2
CLIENT Owner Third Party
Posco SPG DC Remarks
Pos. Rev. Test description Evaluation Procedures Evaluation criteria Verification documents
Inspection
Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date Code Sign. & date
Frequence
10 DOCUMENTATION REVIEW
- Review Manufacturing Data Book Comply with Purchase order, SPG TPS4010, QCP4010 and Compiled Data N/A
Reports as per "verification document"
10.1
column of this QCP
- Declaration of conformity Client specifications Book HP RD RD RD
*2. SPG DC and CLIENT reserves the rights to request Posco a WP (witness point) in case of any devation of quality requirements or delays
*4. The test frequency indicates the % to be checked for each weld type and welder. It is Posco's responsibility to ensure testing up to the extent required by the respective codes/ spec.or inspection plan is performed. The most stringent one prevails
*5. Splicing of any members is strictly forbidden without the approval of SPG DC prior to the fabrication.
*6. UT can be applied for materials with thickness > 8 mm and only if RT is not possible. UT testing in lieu of RT is allowed only if approved by SPG
*7. Shipment of items is not allowed without prior approval of release note by SPG DC and CLIENT