SMALL POWER UTILITIES GROUP

POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS


As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
I. SPUG - LUZON :
A. MARINDUQUE/QUEZON/NORTH LUZON AREA:
Marinduque Grid
1 . BOAC DPP, Marinduque 1 CKD 1.2240 0.6000 47,289.100 13-Jun-97 Operational Run to failure mode.
(24 hours operation ) 2 CKD 1.2240 0.5000 37,106.800 13-Jun-97 Operational Run to failure mode.
(MARELCO) 3 CKD 1.2240 0.5000 43,329.700 13-Jun-97 Operational Run to failure mode.
7 MAN 1.0000 1.0000 896.820 8-May-17 Operational
8 MAN 1.0000 1.0000 840.370 8-May-17 Operational
9 MAN 1.0000 1.0000 924.590 8-May-17 Operational
10 MAN 1.0000 1.0000 362.340 8-May-17 Operational
11 MAN 1.0000 1.0000 277.070 8-May-17 Operational
Sub-total (owned) 8.6720 6.6000 Contracted Capacity: 3 MW
MONARK EQUIPMENT CORP. (RENTAL) 5 MONARK-RENTAL 5.7150 4.0000 36,819.760 1-Dec-16 Operational Contract Period: 15 Sep 2017 to 14 Dec 2017
Sub-total (rental) 5.7150 4.0000
1 Contracted Capacity: 1.0 MW
Total 14.3870 10.6000 Contract Period: 15 Sep 2017 to 14 Dec 2017

Normal operation. Unit is operating upon the request of


2 . TORRIJOS DPP, Marinduque 2 PERKINS 0.5000 0.4600 3,102.990 9-Mar-07 Operational the load dispatch in the morning for economic
operation.
back-up Sub-total 0.5000 0.4600
(MARELCO)
3 . POWER BARGE 120, Marinduque 1 DAIHATSU 1.8000 1.0000 93,806.340 15-Jun-95 Operational
(24 hours operation ) 2 DAIHATSU 1.8000 1.1500 65,695.570 15-Jun-95 Operational
(MARELCO) 3 DAIHATSU 1.8000 1.0000 94,033.240 15-Jun-95 Operational
4 DAIHATSU 1.8000 1.0500 96,551.750 15-Jun-95 Operational
Sub-total 7.2000 4.2000
Total Marinduque Grid : 22.0870 15.2600 9.460 4.850 5.877 5.800 9.860
4 . MANIWAYA DPP, Marinduque 1 PERKINS 0.0540 0.0500 16,262.800 1-Nov-08 Operational
(8 hours operation) 2 PERKINS 0.0500 0.0480 15,265.450 5-Jun-09 Operational
2
3:00PM-11:00PM 3 CUMMINS 0.1060 0.0800 1,448.100 23-Jun-17 Operational
(MARELCO) Total : 0.2100 0.1780 0.058 0.022 0.039 0.120 0.0780
5 . MONGPONG DPP, Marinduque 1 PERKINS 0.0540 0.0500 22,902.800 1-Nov-08 Operational
(8 hours operation) 2 PERKINS 0.0500 0.0480 10,718.300 26-Jun-09 Operational
3
3:00PM-11:00PM Total : 0.1040 0.0980 0.047 0.016 0.030 0.052 0.0478
(MARELCO)
6 . POLO DPP, Marinduque 1 PERKINS 0.0420 0.0400 5,548.580 1-Nov-08 Operational Stand-by unit thus, low accum. running hours.
(8 hours operation) 2 PERKINS 0.0500 0.0480 16,522.550 25-Jun-09 Operational
4
3:00PM-11:00PM Total : 0.0920 0.0880 0.027 0.006 0.018 0.061 0.0340
(MARELCO)
7 . POLILLO DPP, Quezon 1 MAN-DIESEL 0.5000 0.4500 35,941.880 20-Jan-10 Operational
(24 hours operation) 2 MAN-DIESEL 0.5000 0.4500 35,712.020 19-Nov-09 Operational
(QUEZELCO II) 4 CUMMINS 0.6720 0.6000 2,163.360 4-Feb-17 Operational
5 CUMMINS 0.6720 0.6000 2,682.750 4-Feb-17 Operational
5 7 DALE-PERKINS 0.2600 0.2500 26,398.650 21-Nov-96 Operational
8 FG-WILSON 0.3150 0.3000 3,841.160 14-Apr-16 Operational
10 CUMMINS 0.6720 0.6000 2,324.330 4-Feb-17 Operational
11 CUMMINS 0.6720 0.6000 2,778.350 4-Feb-17 Operational
Total : 4.2630 3.8500 1.435 0.228 0.866 2.415 1.7080
8 . JOMALIG DPP, Quezon 1 DALE-PERKINS 0.1630 0.1500 23,138.970 1-Dec-97 Operational
(16 hours operation) 2 PERKINS 0.2600 0.2400 67,525.090 24-Jun-92 Operational
6
01:00PM-05:00AM 3 FG-WILSON 0.1930 0.1600 3,143.700 26-Oct-16 Operational
(QUEZELCO II) Total : 0.6160 0.5500 0.150 0.070 0.095 0.400 0.2000

SPU-OPA-004.F05
Rev.0 2 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
9 . PATNANUNGAN DPP, Quezon 1 DALE-PERKINS 0.1630 0.1500 36,258.960 27-Nov-97 Operational
Standby unit since it was derated due to repaired
2 DALE-PERKINS 0.2600 0.2000 5,731.010 19-Jan-93 Operational
(16 hours operation) crankshaft spline and hub thus,low accu. running hours.
7
Unit cannot be synch to U1 and U2. Synchronizer and
01:00PM-05:00AM 3 FG-WILSON 0.1930 0.1600 2,937.500 26-Aug-16 Operational
load sharing not yet installed by WMTSD-LOD.

(QUEZELCO II) Total : 0.6160 0.5100 0.255 0.100 0.151 0.255 0.2800
10 . BASCO DPP, Batanes 1 STAMFORD-PERKINS 0.5000 0.2000 24,311.410 7-Aug-04 Operational
(24 hours operation ) 8 MAN B&W 0.5000 0.3500 57,565.647 2-Apr-03 Operational
(BATANELCO)
Unit no. 9 - 7200 kW genset was not operational since
12 Jul 2017 due to cut connecting rod bearing cap bolt
resulting to damaged engine block, fuel pump, crank
0 CUMMINS 0.0000 0.0000 0.000 10-Feb-17 Deactivated shaft, connecting rod and connecting rod bearing cap.
Unit was deactivated on Aug 2017 since restoration of it
cannot be determined due to major damaged in the
generating unit.

10 CUMMINS 0.7240 0.5000 3,319.050 10-Feb-17 Operational


8 11 CUMMINS 0.7240 0.5000 2,640.970 10-Feb-17 Operational
12 CUMMINS 0.6700 0.5000 3,049.120 10-Feb-17 Operational
Sub-total (owned) 3.1180 2.0500
Total 3.1180 2.0500
Unit nos. 1 - 3 Vergnet with 60 kW each wind turbine
11 . WIND TURBINE, Batanes 0 Vergnet 0.0000 0.0000 6,824.000 7-Aug-04 Non-operational
was not operational since 26 June 2006 due to
corrupted main Programmable Logic Controller (PLC);
On Standby 0 Vergnet 0.0000 0.0000 4,885.000 7-Aug-04 Non-operational
damaged propeller since 13 Sept 2016 due to typhoon
"Ferdie"; parts for replacement and no target date of
0 Vergnet 0.0000 0.0000 5,568.000 7-Aug-04 Non-operational
restoration
Sub-total 0.0000 0.0000
Total Grid : 3.1180 2.0500 1.157 0.392 0.694 0.893 1.6880
12 . SABTANG DPP, Batanes 1 DALE-PERKINS 0.1630 0.1500 70,063.530 15-Jan-93 Operational
(24 hours operation) 2 DALE-PERKINS 0.1630 0.1500 24,355.410 15-Jan-93 Operational
(BATANELCO) 3 FG-WILSON 0.1930 0.1600 1,681.300 7-Sep-16 Operational
9
4 PERKINS 0.1100 0.0800 1,032.980 1-Feb-17 Operational
5 PERKINS 0.1100 0.0800 1,177.650 1-Feb-17 Operational
Total : 0.7390 0.6200 0.122 0.037 0.060 0.498 0.150
13 . ITBAYAT DPP, Batanes 1 DALE-PERKINS 0.1630 0.1400 52,110.020 1-Dec-96 Operational
(24 hours operation) 2 DALE-PERKINS 0.1630 0.1400 43,648.170 1-Dec-96 Operational
(BATANELCO) 3 FG-WILSON 0.1930 0.1600 2,017.400 9-Sep-16 Operational
10
4 PERKINS 0.1100 0.0900 520.600 20-Feb-17 Operational
5 PERKINS 0.1100 0.0900 1,262.100 20-Feb-17 Operational
Total : 0.7390 0.6200 0.133 0.035 0.064 0.487 0.170
Not operational; transferred at the new site (Brgy.
Dadao) last Aug. 25, 2017. New power plant cannot be
14 . CALAYAN DPP, Cagayan 1 DALE-PERKINS 0.1630 0.0000 27,027.180 22-Aug-92 Non-operational
used since distribution line of LGU to new site was not
yet completed.
2 DALE-PERKINS 0.1630 0.1500 39,452.760 22-Aug-92 Operational
11
Not operational since 03 October 2017 due to grounded
(12 hours operation) 3 FGWILSON 0.1000 0.0000 11,238.590 3-Mar-08 Non-operational exciter rotor; rotor for rewinding at MRMD; tentative
date of restoration 10 February 2017

12:00NN-12:00MN 4 FG-WILSON 0.3150 0.3000 3,069.640 28-Sep-16 Operational


(LGU-CALAYAN) Total : 0.7410 0.4500 0.159 0.059 0.095 0.291 0.200

SPU-OPA-004.F05
Rev.0 3 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
15 . KABUGAO DPP, Apayao 1 DALE-PERKINS 0.2600 0.2500 65,777.260 8-Mar-93 Operational
(24 hours operation) 2 DALE-PERKINS 0.1630 0.1500 64,253.340 27-Oct-93 Operational

Unit no. 3 - 220 kW genset was not operational since 11


Mar 2016 due to damaged cylinder head and
12 (KAELCO) 0 CKD 0.0000 0.0000 0.000 28-Sep-96 Deactivated
deactivated in July 2017. Unit was already included for
the proposed decommissioning of genset.

4 CUMMINS 0.3360 0.3000 2,276.790 13-Jan-17 Operational


Total : 0.7590 0.7000 0.190 0.052 0.099 0.510 0.219
16 . PALANAN DPP, Isabela 1 DALE-PERKINS 0.1630 0.1500 30,273.380 1-Aug-95 Operational
(16 hours operation) 2 DALE-PERKINS 0.2600 0.2500 28,429.400 1-Aug-95 Operational
13 8:00AM-12:00MN 3 FG WILSON 0.1000 0.0900 2,730.900 14-Apr-09 Operational
(ISELCO II) 4 FG WILSON 0.1930 0.1600 1,201.200 4-Jul-17 Operational
Note: Increase in OH (12 to 16) on 18 Mar 2017 Total : 0.7160 0.6500 0.160 0.058 0.099 0.490 0.220
17 . CASIGURAN DPP, Aurora 1 MAN 0.5000 0.4000 49,428.050 12-Jul-04 Operational
(24 hours operation) 2 MAN 0.5000 0.4000 57,492.960 12-Jul-04 Operational
(AURELCO) 4 DALE-PERKINS 0.2600 0.1800 51,227.040 2-Aug-92 Operational
5 DALE-PERKINS 0.6750 0.4500 15,782.400 12-Nov-10 Operational
14 6 CUMMINS 0.7240 0.6000 7,840.870 8-May-16 Operational
7 CUMMINS 0.6720 0.6000 2,250.000 17-Feb-17 Operational
Total : 3.3310 2.6300 1.039 0.176 0.549 1.591 1.250
EMS did not resume their operation after being
Eco Market Solutions, Inc. (EMS) 1 Biomass 0.2500 0.0000 2013 Non-operational damaged by typhoon on 12 Aug 2013
B. BICOL AREA:
Catanduanes Grid
Replaced the new generator in October 2016 thus, low
18 . BALONGBONG HEPP, Catanduanes 1 SFW 900-10/1430 0.9000 0.9000 7,885.350 1-Jun-83 Operational
accu. running hours.
(24 hours operation) 2 SFW 900-10/1430 0.9000 0.9000 140,300.300 1-Jun-83 Operational
(FICELCO) Sub-total 1.8000 1.8000
19 . MARINAWA DPP, Catanduanes 1 DALE-PERKINS 0.5600 0.3500 52,275.000 30-Jul-99 Operational
(24 hours operation) 2 DALE-PERKINS 0.5600 0.3500 3,197.000 26-Feb-01 Operational
(FICELCO) 3 DALE-PERKINS 0.5600 0.3500 48,761.000 7-May-14 Operational
4 DALE-PERKINS 0.5600 0.3500 45,817.000 31-May-14 Operational
5 CUMMINS 1.1140 1.0000 3,002.000 11-Aug-16 Operational
6 CUMMINS 1.1140 1.0000 3,164.000 11-Aug-16 Operational
Sub-total 4.4680 3.4000
15
20 . VIGA DPP, Catanduanes 1 DALE-PERKINS 0.5600 0.4000 30,943.910 2-May-03 Operational
(24 hours operation) 2 CUMMINS 0.5000 0.4000 1,881.110 31-Aug-12 Operational
(FICELCO) 3 CUMMINS 0.5000 0.3500 2,885.550 31-Aug-12 Operational Standby unit due to high fuel rate.
4 DALE-PERKINS 0.5600 0.4000 33,853.020 3-May-03 Operational
Sub-total 2.1200 1.5500
Total Catanduanes (NPC) Grid : 8.3880 6.7500
NPP Sun West Water & Electric Co. (Hitoma 1) 1 Hydro 1.5000 1.1500 2010 Operational * - No data from NPP
NPP Sun West Water & Electric Co. (Solong) 1 Hydro 2.1000 2.0000 2010 Operational
NPP Sun West Water & Electric Co. (Solong) 1 Diesel 5.2000 3.2000 2010 Operational
Unit was not operational since 17 October 2017 due to
1 Bunker 3.6000 0.0000 2011 Non-operational non renewal of CPGI contract; operation to be taken
over by NPC;
(FICELCO) Total Catanduanes Grid : 20.7880 13.1000 10.592 4.431 * 2.508 10.633
21 . PALUMBANES DPP, Catanduanes 1 CUMMINS 0.0220 0.0210 7,134.100 1-Feb-15 Operational
2 STAMFORD 0.0400 0.0400 8,187.700 1-Jan-16 Operational
16 (8 hours operation) Total : 0.0620 0.0610 0.026 0.007 0.021 0.035 0.026
4:00PM-12:00MN
(FICELCO)

SPU-OPA-004.F05
Rev.0 4 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
22 . RAPU-RAPU DPP, Albay 1 DALE-PERKINS 0.1630 0.1400 40,215.040 1-Jan-05 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1400 42,608.770 7-Nov-96 Operational
08:00AM-12:00MN 3 PERKINS 0.3000 0.2250 1,296.700 19-Jan-17 Operational
17 (APEC) 4 PERKINS 0.3000 0.2250 1,395.200 19-Jan-17 Operational
5 MAN-DIESEL 0.5000 0.4500 22,057.860 24-Oct-07 Operational
6 FG-WILSON 0.1930 0.1600 179.200 28-Jun-16 Operational
Total : 1.6190 1.3400 0.395 0.152 0.265 0.945 0.513
23 . BATAN DPP, Albay 1 DALE-PERKINS 0.1630 0.1300 41,766.000 1-Aug-91 Operational
(16 hours operation) 2 PERKINS 0.3000 0.2400 2,255.000 20-Jan-17 Operational
8:00AM-12:00MN
(APEC)
Note: Increase in OH (8 to 16) on 26 October 2017 3 DALE-PERKINS 0.1630 0.1300 21,554.000 7-Nov-96 Operational

18
Not operational since 08 Jul 2017 due to oil
contamination at radiator; requested for
4 PERKINS 0.1930 0.0000 2,468.000 9-May-16 Non-operational assessment/repair from technical services group
(WMTSD) on 08 August 2017; target date of completion
after assessment from WMTSD
Total : 0.8190 0.5000 0.305 0.070 0.223 0.195 0.366
Masbate (Mainland) Grid
19 NPP DMCI Power Corporation 1 Bunker 47.4900 27.8400 2010 Operational
(MASELCO) Total Grid : 47.4900 27.8400
Other Islands in Masbate
24 . TICAO DPP, Masbate 1 CUMMINS 0.6700 0.6000 2,563.000 2-May-17 Operational
(24 hours operation) 2 CUMMINS 0.6700 0.6000 2,830.000 2-May-17 Operational
(TISELCO)
Not operational since 22 September 2017 due to
radiator leakage; for replacement of batteries by
3 CUMMINS 0.6700 0.6000 1,526.000 2-May-17 Not operational supplier; awaiting to be repaired by the supplier. No
20 tentative date of restoration. NOTE: for correction in
the MOR database (dep. Cap)

4 CUMMINS 0.6700 0.6000 2,825.000 2-May-17 Operational


5 MAN 0.5000 0.3500 25,536.580 25-Jan-02 Operational
6 FG-WILSON 0.3150 0.3000 1,746.830 14-Dec-15 Operational
Sub-total (owned) 3.4950 3.0500
Total : 3.4950 3.0500 1.884 0.744 1.101 1.166 2.168
25 . SAN PASCUAL DPP, Masbate 1 DALE-PERKINS 0.2600 0.2000 55,192.000 13-Nov-94 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1300 46,392.000 10-May-98 Operational
8:00AM-12:00MN
(LGU San Pascual)

Not operational since 12 May 2017 due to defective


21 3 VOLVO 0.5600 0.0000 2,144.000 21-Sep-12 Non-operational rocker arm; PR S1-BRS17-008 for the replacement part is
still on process; no tentative date of restoration.

4 PERKINS 0.3150 0.3000 4,773.000 3-Dec-15 Operational


Total : 1.2980 0.6300 0.295 0.120 0.177 0.335 0.322
26 . GUINAWAYAN DPP, Masbate 1 FG WILSON 0.0350 0.0346 22,956.200 1-May-07 Operational
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 1,675.100 2-Aug-16 Operational
22
4:00PM-12:00MN Total : 0.1400 0.1146 0.035 0.011 0.025 0.080 0.0350
(LGU - Placer)

SPU-OPA-004.F05
Rev.0 5 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
27 . GILOTONGAN DPP, Masbate 1 FG WILSON 0.0900 0.0810 20,497.660 1-May-07 Operational
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 2,751.400 2-Aug-16 Operational
23
4:00PM-12:00MN Total : 0.1950 0.1610 0.081 0.024 0.062 0.080 0.0890
(LGU - Cawayan)
28 . NABUCTOT DPP, Masbate 1 FG WILSON 0.0250 0.0200 22,906.380 1-May-07 Operational
(8 hours operation) Total : 0.0250 0.0200 0.013 0.007 0.011 0.007 0.0175
24
4:00PM-12:00MN
(LGU - Placer)
29 . PEÑA DPP, Masbate 1 FG WILSON 0.0900 0.0720 22,654.720 1-May-07 Operational
(8 hours operation) Total : 0.0900 0.0720 0.036 0.012 0.027 0.036 0.0360
25
4:00PM-12:00MN
(LGU - Cawayan)
30 . CHICO DPP, Masbate 1 FG WILSON 0.0350 0.0320 20,797.800 1-May-07 Operational
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 2,823.100 2-Aug-16 Operational
26
4:00PM-12:00MN Total : 0.1400 0.1120 0.032 0.015 0.024 0.080 0.0370
(LGU - Cawayan)
31 . NARO DPP, Masbate 1 FG-WILSON 0.1050 0.0800 3,113.900 3-Apr-16 Operational
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 1,829.900 3-Apr-16 Operational
27 4:00PM-12:00MN Total : 0.2100 0.1600 0.059 0.018 0.040 0.101 0.0600
(LGU - Cawayan)

Not operational since 12 November 2017 due to low


water supply; excessive leak at water pump; unit under
32 . DANCALAN DPP , Masbate 1 FG WILSON 0.0800 0.0000 10,532.900 27-May-12 Non-operational repair; non availability of shaft seal at the area; for
ordering of shaftseal; tentative date of restoration
28
February 2018.
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 1,580.900 1-Aug-16 Operational
4:00PM-12:00MN Total : 0.1850 0.0800 0.032 0.014 0.018 0.048 0.0320
(LGU San Pascual)
Not operational since 17 December 2017 due to burnt
33 . MABABANGBAYBAY DPP, Masbate 1 FG WILSON 0.0600 0.0500 12,037.400 24-Apr-12 Operational stator windings; tentative date of restoration 04 January
2018.
29
(8 hours operation) Total : 0.0600 0.0500 0.019 0.009 0.014 0.031 0.0200
4:00PM-12:00MN
(LGU Claveria)
34 . MALAKING ILOG DPP , Masbate 1 FG WILSON 0.0600 0.0500 14,250.500 9-Apr-12 Operational
(8 hours operation) Total : 0.0600 0.0500 0.024 0.009 0.016 0.026 0.0290
30
4:00PM-12:00MN
(LGU San Pascual)
35 . OSMENIA DPP , Masbate 1 FG WILSON 0.0800 0.0650 11,636.300 10-Jul-12 Operational
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 1,641.700 1-Aug-16 Operational
31
4:00PM-12:00MN Total : 0.1850 0.1450 0.033 0.015 0.025 0.112 0.0360
(LGU Claveria)
36 . PEÑAFRANCIA DPP, Masbate 1 FG WILSON 0.0800 0.0650 11,187.400 10-Jun-12 Operational
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 1,449.700 1-Aug-16 Operational
32
4:00PM-12:00MN Total : 0.1850 0.1450 0.024 0.010 0.018 0.121 0.0280
(LGU Claveria)
37 . QUEZON DPP, Masbate 1 FG WILSON 0.0600 0.0500 12,499.400 7-Jun-12 Operational
(8 hours operation) Total : 0.0600 0.0500 0.017 0.006 0.013 0.033 0.0200
33
4:00PM-12:00MN
(LGU-Claveria)
38 . LAHUY DPP, Camarines Sur 1 CUMMINS 0.1200 0.0960 11,674.000 6-Apr-09 Operational
(8 hours operation) Total : 0.1200 0.0960 0.055 0.011 0.040 0.041 0.0700
34 4:00PM-12:00MN
(CASURECO IV)
Note: Increase in OH (4 to 8) on 25 Feb 2017

SPU-OPA-004.F05
Rev.0 6 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
39 . HAPONAN DPP, Camarines Sur 1 CUMMINS 0.0350 0.0280 6,821.000 29-Jul-09 Operational Plant on standby; CASURECO IV requested to stop its
35 (on standby) Total : 0.0350 0.0280 - - - 0.028 0.0000 operation due to low collection efficiency
(CASURECO IV)
40 . QUINALASAG DPP, Camarines Sur 1 CUMMINS 0.1500 0.1200 14,216.000 14-Dec-09 Operational
(8 hours operation) Total : 0.1500 0.1200 0.084 0.010 0.062 0.036 0.0920
36
4:00PM-12:00MN
(CASURECO IV)
41 . ATULAYAN DPP, Camarines Sur 1 CUMMINS 0.0220 0.0180 7,030.000 1-Jun-14 Operational
(6 hours operation) Total : 0.0220 0.0180 0.009 0.002 0.006 0.009 0.0103
37
5:00PM-11:00PM
(CASURECO IV)
C. MINDORO/ROMBLON AREA:
Oriental Mindoro Grid
NPP Power One Corporation 1 Bunker 15.3000 11.4200 2012 Operational
NPP Ormin Power, Inc. 1 Bunker 9.6000 6.4000 2011 Operational
NPP Linao Mini Hydro (Lower Cascade) 1 Hydro 2.1800 2.1000 2012 Operational
NPP Linao Mini Hydro (Upper Cascade) 1 Hydro 3.0000 3.0000 2012 Operational No data from NPP
38
NPP Mindoro Grid Corporation (Calapan) 1 Diesel 6.6000 5.0000 2013 Operational
NPP Mindoro Grid Corporation (Bongabong) 1 Diesel 6.6000 5.0000 2013 Operational
NPP DMCI Power Corporation 1 Bunker 15.0000 15.0000 2015 Operational
(ORMECO) Total Or. Mindoro Grid : 58.2800 47.9200
Occidental Mindoro (San Jose) Grid
NPP Occidental Mindoro Consolidated Power Corp. 1 Bunker 8.0000 7.5600 19-Apr-17 Operational
(OMECO) 2 Bunker 8.0000 7.5600 19-Apr-17 Operational
3 Bunker 8.0000 7.5600 19-Apr-17 Operational
39 Total : 24.0000 22.6800
42 . POWER BARGE 106, Occidental Mindoro 2 DAIHATSU 3.6000 2.2000 82,664.830 1-Sep-92 Operational
(on standby) 3 DAIHATSU 3.6000 2.2000 63,790.200 1-Sep-92 Operational
Sub-total 7.2000 4.4000 2.100 1.000 1.839 2.300 2.200
Total Occ. Min. (San Jose) Grid : 31.2000 27.0800 - - - 27.080 15.000 No data from NPP
Contracted Capacity: 6 MW from Pulang Lupa started on
43 Occidental Mindoro (MAPSA) Grid 4 AGGREKO MODULAR 6.7200 6.0000 3,156.580 14-Aug-17 Operational 15 August 2017

MAMBURAO DPP, Occidental Mindoro Total Occ. Min. (MAPSA) Grid : 6.7200 6.0000 4.700 1.000 1.976 1.300 5.000
40
(24 hours operation)
(OMECO)
AGGREKO MODULAR GENSET (RENTAL)
44 . LUBANG DPP, Occidental Mindoro 1 CXZ-MAN 0.5000 0.4000 32,852.980 25-Mar-08 Operational
(24 hours operation) 2 CXZ-MAN 0.5000 0.4000 35,755.170 25-Mar-08 Operational
(LUBELCO) 3 CUMMINS 0.7040 0.6000 27,206.810 8-Jun-09 Operational
5 CUMMINS 0.7240 0.6000 3,174.120 14-Feb-16 Operational
41 Sub-total (owned) 2.4280 2.0000
Contracted Capacity: 1 MW
MONARK EQUIPMENT CORP. (RENTAL) 6 MONARK-RENTAL 1.1790 1.0000 10,296.510 25-Sep-16 Operational
Contract Period: 16 Jul 2017 to 15 Jan 2018
Sub-total (rental) 1.1790 1.0000
Total : 3.6070 3.0000 0.774 0.323 0.493 2.226 0.887
45 . CABRA DPP, Occidental Mindoro 1 CUMMINS 0.0600 0.0550 9,808.100 1-Dec-12 Operational
(8 hours operation) 2 CUMMINS 0.0600 0.0550 2,540.560 1-Dec-12 Operational
42
4:00AM-6:00AM/5:00PM-11:00PM 3 PERKINS 0.0600 0.0400 711.150 1-Jan-10 Operational
(LUBELCO) Total : 0.1800 0.1500 0.045 0.019 0.030 0.105 0.055

SPU-OPA-004.F05
Rev.0 7 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
46 . TINGLOY DPP, Batangas 2 DALE-PERKINS 0.2600 0.1500 27,266.420 24-Dec-94 Operational
(12 hours operation) 3 DALE-PERKINS 0.2600 0.1500 41,580.400 24-Dec-94 Operational
12:00NN-12:00MN 4 MAN CXZ 0.5000 0.3750 30,052.120 24-Aug-09 Operational
43 (BATELEC II) 5 CUMMINS 0.6700 0.6000 1,557.000 24-Mar-17 Operational
6 CUMMINS 0.6700 0.6000 1,441.000 24-Mar-17 Operational
7 CUMMINS 0.6700 0.6000 202.000 24-Mar-17 Operational
Total : 3.0300 2.4750 0.569 0.250 0.407 1.906 0.618
Romblon (Mainland) Grid
47 . ROMBLON DPP, Romblon 1 TIDE-POWER 0.6000 0.4000 20,146.980 8-Oct-08 Operational
(24 hours operation) 2 FG WILSON 0.6000 0.4000 33,346.310 10-Dec-08 Operational
(ROMELCO) 3 FG WILSON 0.6000 0.4000 21,010.400 29-Nov-08 Operational
4 FG-WILSON 0.6000 0.4000 18,204.710 25-Apr-07 Operational
5 CUMMINS 0.6700 0.6000 2,885.450 20-Jan-17 Operational
Total : 3.0700 2.2000
48 . POWER BARGE 114, Romblon 2 FG WILSON 0.6500 0.4000 33,526.000 1-Jun-09 Operational
44
(24 hours operation) 4 FG WILSON 0.6500 0.4000 37,034.000 3-May-10 Operational
(ROMELCO) Total : 1.3000 0.8000
49 . POWER BARGE 109, Romblon 1 PERKINS 0.6000 0.4500 12,605.700 3-Dec-13 Operational
3 FG WILSON 0.6000 0.4500 22,764.100 7-Aug-17 Operational
(24 hours operation) 4 CUMMINS 0.9100 0.6500 1,938.100 22-Sep-08 Operational
Total : 2.1100 1.5500
Note: PB 109 was transferred to Romblon Mainland on
Total Romblon (Mainland) Grid : 6.4800 4.5500 1.920 0.455 1.155 2.630 2.001
19 Apr 2017
Romblon (Tablas Island) Grid
45 NPP Sun West Water & Electric Co. (SUWECO) 1 Diesel 8.8000 7.7000 2015 Operational
(TIELCO) Total Tablas Is. Grid : 10.9100 9.2500
50 . SIBUYAN DPP, Romblon 4 DALE-PERKINS 0.1630 0.1400 59,989.090 2-May-97 Operational
Unit no. 6 - 600 kW Caterpillar is owned by ROMELCO
0 Caterpillar 0.0000 0.0000 0.000 16-Feb-05 Non-operational and was deactivated in August 2017 since ROMELCO
(24 hours operation) did not renew its PTO.
(ROMELCO) 7 MAN 0.5000 0.4500 27,104.170 30-Dec-07 Operational
46 8 MAN 0.5000 0.4000 35,936.900 31-Dec-07 Operational
9 CUMMINS 0.6720 0.5500 416.000 8-May-17 Operational
10 CUMMINS 0.6720 0.5500 525.000 8-May-17 Operational
11 CUMMINS 0.6720 0.5500 124.000 8-May-17 Operational
Sub-total 3.1790 2.6400
NPP Cantingas Mini-Hydro Corporation 1 Hydro 0.9000 0.9000 Operational
Total Grid : 4.0790 3.5400 1.634 0.755 * 1.906 1.751 * - No data from NPP
51 . BANTON DPP, Romblon 1 DALE-PERKINS 0.1630 0.1450 34,432.250 7-Apr-99 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1450 31,959.470 16-Apr-96 Operational
47 4:00AM-11:00AM/2:00PM-11:00PM 3 FG-WILSON 0.1930 0.1600 4,661.730 1-Jul-16 Operational
4 CUMMINS 0.3300 0.3000 129.930 9-Dec-17 Operational
(ROMELCO) Total : 0.8490 0.7500 0.151 0.028 0.086 0.599 0.184
52 . SAN JOSE DPP, Romblon 1 DALE-PERKINS 0.1630 0.1200 15,691.340 1-Dec-04 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1400 48,881.970 1-May-97 Operational
48 2:00PM-6:00AM 4 FG-WILSON 0.3150 0.3000 7,805.170 8-Jun-16 Operational
(TIELCO) Total : 0.6410 0.5600 0.386 0.190 0.234 0.174 0.387

53 . CORCUERA DPP, Romblon 2 DALE-PERKINS 0.1630 0.1200 23,057.700 30-Jan-97 Operational


(16 hours operation) 3 MAN 0.5000 0.4000 27,324.160 20-Apr-07 Operational
49 4:30AM-6:30AM/8:00AM-3:00PM/5:00PM-12:00MN 4 FG-WILSON 0.3150 0.3000 4,465.280 25-Jun-16 Operational
(ROMELCO) 5 CUMMINS 0.3360 0.3000 211.160 25-Jan-17 Operational Operational but cannot be synchronized .
Total : 1.3140 1.1200 0.300 0.160 0.189 0.820 0.370

SPU-OPA-004.F05
Rev.0 8 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
54 . CONCEPCION DPP, Romblon 1 DALE-PERKINS 0.1630 0.1450 35,201.800 11-Mar-97 Operational
Standby for emergency use only until PMS ( Major
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1450 35,367.400 1-Jan-01 Operational
Overhauling)
50
4:00AM-8:00AM/1:00PM-1:00AM 3 CUMMINS 0.3360 0.3000 2,484.020 24-Jan-17 Operational
(LGU Concepcion) Total : 0.6620 0.5900 0.160 0.075 0.101 0.430 0.180
Note: Increase in OH (8 to 16) on 26 Jan 2017
D. PALAWAN AREA :
Palawan (Mainland) Grid
NPP Palawan Power Generation, Inc. (Puerto Princesa) 1 Bunker 14.0000 7.2700 2008 & 2010 Operational
NPP Palawan Power Generation, Inc. (Narra) 1 Bunker 5.0000 4.5000 2008 & 2010 Operational
No data from NPP
51 NPP DMCI Power Corporation 1 Diesel 31.4500 20.8800 2013 Operational
NPP Delta P 1 Bunker 16.0000 13.5000 2009 Operational
(PALECO) Total Palawan (Mainland) Grid : 66.4500 46.1500
55 . EL NIDO DPP, Palawan 1 MAN 0.5000 0.4000 33,371.290 14-Apr-09 Operational
Not operational since 16 Feb 2017 due to major
mechanical breakdown (engine seizure; stuck main
2 TIDE POWER 0.6750 0.0000 0.000 10-Sep-09 Non-operational bearings); PR no S1-END17-007 for the needed spare
parts is still on process; target date of restoration is on
(24 hours operation) 30 November 2017
(PALECO) 4 CUMMINS 0.6720 0.6000 3,278.000 5-May-17 Operational
5 CUMMINS 0.6720 0.6000 3,745.000 1-Apr-17 Operational
Sub-total (owned) 2.5190 1.6000
Contracted Capacity: 1.5 MW
52 8 MONARK 0.9100 0.8000 1,000.000 4-May-15 Operational
Contract Period: 18 July 2017 to 17 July 2018
9 MONARK 0.9100 0.8200 7,053.000 4-May-15 Operational
Contracted Capacity: 1.0 MW
MONARK EQUIPMENT CORP. (RENTAL) 10 MONARK 0.5440 0.4500 4,928.000 1-Apr-14 Operational Contract Period: 10 Dec 2017 to 09 Dec 2018

11 MONARK 0.9100 0.8000 1,687.000 12-Nov-17 Operational

12 MONARK 0.4550 0.4500 1,161.000 12-Nov-17 Operational

Sub-total (rental) 3.7290 3.3200


Total : 6.2480 4.9200 3.071 1.044 2.020 1.849 3.071
56 . TAYTAY DPP, Palawan 2 DALE-PERKINS 0.2600 0.1800 42,571.000 20-May-92 Operational
(24 hours operation) 3 MAN CXZ 0.5000 0.4000 36,810.000 4-Jun-09 Operational
(PALECO) Sub-total (owned) 0.7600 0.5800
MONARK EQUIPMENT CORP. (RENTAL) 5 MONARK-RENTAL 0.4550 0.3500 2,655.000 2-Oct-14 Operational Contracted Capacity: 1 MW
53
6 MONARK-RENTAL 1.0000 0.9500 9,792.000 6-Aug-16 Operational Contract Period: 26 July 2017 to 25 July 2018
8 MONARK-RENTAL 1.0000 0.9500 4,164.000 6-Aug-16 Operational
Sub-total: 2.4550 2.2500
Total : 3.2150 2.8300 1.055 0.400 0.652 1.775 1.055
57 . SAN VICENTE DPP, Palawan 1 DALE-PERKINS(PAL) 0.1630 0.1200 37,131.800 19-Jan-95 Operational
(24 hours operation) 3 DALE-PERKINS(PAL) 0.2600 0.2200 78,629.000 22-Apr-02 Operational
(PALECO) 4 MAN CXZ 0.5000 0.4000 48,178.070 14-Nov-08 Operational
54
5 CUMMINS 0.6720 0.6000 3,248.000 7-Mar-17 Operational
6 CUMMINS 0.6720 0.6000 2,985.000 7-Mar-17 Operational
Total : 2.2670 1.9400 0.651 0.333 0.422 1.289 0.701

SPU-OPA-004.F05
Rev.0 9 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
58 . RIZAL DPP, Palawan 1 DALE-PERKINS 0.2600 0.2300 51,016.640 3-Aug-93 Operational

Not operational since 28 Feb 2017 due to defective


water pump; for PR preparation of the replacement part
(24 hours operation) 2 JOHN DEERE-CUMPER 0.2560 0.0000 33,770.400 17-Dec-07 Non-operational
(awaiting approval of adjusted PPMP); tentative date of
55 restoration is in November 2017

(PALECO) 3 DALE-PERKINS 0.1630 0.1300 30,051.950 3-Aug-93 Operational


4 FG WILSON 0.3150 0.2700 7,973.360 29-Dec-15 Operational
5 PERKINS 0.3050 0.2700 2,650.400 22-Mar-17 Operational
Total : 1.2990 0.9000 0.358 0.172 0.216 0.542 0.378
Other Islands in Palawan
NPP Calamian Island Power Corp. (Busuanga) 1 Diesel 8.1200 2013 Operational
7.7200
56 NPP Calamian Island Power Corp. (Coron) 1 Diesel 0.7000 2013 Operational
(BISELCO) Total : 8.8200 7.7200
QTP Power Source Philippines, Rio Tuba 1 Diesel 1.6900 0.5900 2010 Operational
57
Total : 1.6900 0.5900
59 . CULION DPP, Palawan 1 DALE-PERKINS 0.1630 0.1500 51,355.770 29-Aug-98 Operational
(24 hours operation) 2 DALE-PERKINS 0.2600 0.2350 78,478.220 12-Dec-92 Operational
(BISELCO) 3 DALE-PERKINS 0.2600 0.2350 87,398.610 26-Feb-15 Operational
58 4 DALE-PERKINS 0.2600 0.2350 80,162.350 26-Feb-15 Operational
5 FG-WILSON 0.1800 0.1500 0.000 6-Jun-08 Operational
6 CUMMINS 0.6720 0.6000 4,500.000 23-Sep-16 Operational
Total : 1.7950 1.6050 0.504 0.278 0.327 1.101 0.510
60 . LINAPACAN DPP, Palawan 2 VISA-PERKINS 0.0540 0.0300 20,019.530 19-Sep-02 Operational
(12 hours operation)
3 PERKINS 0.1050 0.1000 15,485.910 17-Sep-11 Operational
59 12:00NN-12:00MN
(BISELCO) 4 DALE-PERKINS 0.1630 0.1500 39,480.760 9-Feb-92 Operational
Total : 0.3220 0.2800 0.119 0.033 0.091 0.161 0.128
61 . CUYO DPP, Palawan 1 MAN-CXZ 0.5000 0.4000 45,258.970 1-Apr-08 Operational
(24 hours operation) 2 MAN-CXZ 0.5000 0.4000 40,015.630 1-Apr-08 Operational
(PALECO) 3 MAN-CXZ 0.5000 0.4000 47,113.150 1-Apr-08 Operational
4 MAN-CXZ 0.5000 0.4000 49,324.250 1-Apr-08 Operational
60
7 CUMMINS 0.6720 0.6000 3,239.430 16-Mar-17 Operational
8 CUMMINS 0.6720 0.6000 2,534.630 16-Mar-17 Operational
Sub-total (owned) 3.3440 2.8000
Total : 3.3440 2.8000 1.099 0.360 0.698 1.701 1.260
62 . ARACELI DPP, Palawan 1 DALE-PERKINS 0.1630 0.1500 62,015.950 19-Jun-95 Operational
(24 hours operation) 2 DALE-PERKINS 0.1630 0.1500 21,034.270 16-Jul-93 Operational
61 (PALECO) 3 DALE-PERKINS 0.2600 0.2500 45,402.170 9-Feb-92 Operational
4 FG-WILSON 0.1930 0.1600 4,505.100 28-May-16 Operational
Total : 0.7790 0.7100 0.180 0.055 0.103 0.530 0.180
63 . BALABAC DPP, Palawan 1 DALE-PERKINS 0.1630 0.1500 23,757.380 1-Apr-03 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1500 45,753.080 5-Feb-97 Operational
62
2:00PM-6:00AM 3 FG-WILSON 0.1930 0.1600 4,212.700 21-Aug-16 Operational
(PALECO) Total : 0.5190 0.4600 0.141 0.060 0.087 0.319 0.153
64 . CAGAYANCILLO DPP, Palawan 1 DALE-PERKINS 0.1630 0.1600 42,978.580 14-Aug-97 Operational
63 (8 hours operation) 2 FG-WILSON 0.1930 0.1600 3,708.400 30-Apr-16 Operational
(PALECO) Total : 0.3560 0.3200 0.134 0.040 0.095 0.186 0.140
65 . AGUTAYA DPP, Palawan 1 DALE-PERKINS 0.1630 0.1500 6,108.900 20-Dec-10 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1500 32,203.110 5-Jun-98 Operational
64
8:00AM-12:00MN 3 FG-WILSON 0.1930 0.1600 5,126.090 8-May-16 Operational
(PALECO) Total : 0.5190 0.4600 0.089 0.038 0.050 0.371 0.089
II. SPUG - VISAYAS :
A. WESTERN VISAYAS AREA:
65 NPP Bantayan Island Power Corporation 1 Bunker 8.3400 4.8900 2015 Operational
(BANELCO) Total : 8.3400 4.8900

SPU-OPA-004.F05
Rev.0 10 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
QTP Power Source Philippines (Malapascua, Cebu) 1 Diesel 1.0500 0.9300 2014 Operational
66
Total : 1.0500 0.9300
66 . GUINTARCAN DPP, Cebu 1 KUMATSU 0.1000 0.0850 14,530.450 21-Sep-07 Operational
2 DALE-PERKINS 0.1630 0.1300 37,518.120 5-Mar-93 Operational
(16 hours operation)
67 3 FG-WILSON 0.1930 0.1600 2,051.000 19-Jan-17 Operational
10:00AM-2:00AM
Total : 0.4560 0.3750 0.133 0.045 0.068 0.242 0.138
(BANELCO)

67 . DOONG DPP, Cebu 1 DALE-PERKINS 0.1630 0.1300 32,782.010 25-Apr-93 Operational


(24 hours operation) 2 DALE-PERKINS 0.1630 0.1300 33,718.710 25-Apr-93 Operational
68 (BANELCO) 3 CUMMINS 0.3360 0.3000 2,061.900 21-Mar-17 Operational
Note: Increase in OH (8 to 16) on 01 Feb 2017 Total : 0.6620 0.5600 0.190 0.080 0.103 0.370 0.197
and from 16 hours to 24 hours on 01 April 2017
68 . CAMOTES DPP, Cebu 1 MAN B&W 0.3000 0.2100 161,221.320 8-Feb-88 Operational
(24 hours operation) 2 MAN B&W 0.3000 0.2200 144,889.910 8-Feb-88 Operational

Not operational since 07 October 2017 due to engine


(CELCO) 3 DALE-PERKINS 0.5600 0.0000 0.000 1-Nov-04 Non-operational knocking and defective fuel injection pump. Tentative
date of restoration 31 March 2018.

5 MAN CXZ 0.5280 0.4000 109,851.050 2-Mar-02 Operational


6 MAN CXZ 0.5000 0.3800 74,546.010 2-May-07 Operational

Unit no. 7 - 500 kW genset was not operational since 23


August 2017 due to cooling water leaks at cylinder liners
no. 1 to 8. Said unit was already overdue for PMS but
0 MAN 0.0000 0.0000 0.000 1-Dec-13 Deactivated
due to lack of spare parts the implementation of which
was deferred. Unit was deactivated on 03 October 2017
since budget for the spare parts was not yet approved.

8 CUMMINS 0.7240 0.5500 8,494.220 8-May-16 Operational


69 9 Cummins 0.3000 0.2100 0.000 18-Oct-17 Operational
Sub-total 3.2120 1.9700
69 . POWER BARGE 113, Cebu 1 MITSUBISHI 0.7500 0.4400 21,856.900 7-Sep-08 Operational

Not operational since 25 November 2017 due to oil


(24 hours operation) 2 MITSUBISHI 0.7500 0.0000 28,001.500 14-Jul-08 Non-operational contamination at radiator tank; clock up charge air
cooler. Tentative date of restoration 31 March 2018.

(CELCO) 6 PERKINS 0.6000 0.4100 13,071.190 1-Dec-13 Operational


Sub-total 2.1000 0.8500

70 POWER BARGE 116 1 DALE-PERKINS 0.5600 - 0.000 17-Jun-93 Non-operational

(24 hours operation) 2 DALE-PERKINS 0.5600 - 0.000 17-Jun-93 Non-operational Incomplete data entry for the month of December 2017.
(CELCO) 3 DALE-PERKINS 0.5600 - 0.000 6-Dec-93 Non-operational For preparation of request for completion of data entry
7 PERKINS 0.6000 0.4500 0.000 1-Dec-13 Operational in the MOR database by Plant Head.
11 CUMMINS 0.9600 0.6000 0.000 Operational
12 CUMMINS 0.9600 0.6000 0.000 Operational
Sub-total 4.2000 1.6500
Total-Grid 9.5120 4.4700 2.640 1.092 1.566 1.830 2.745
71 PILAR DPP, Cebu 1 DALE-PERKINS 0.1630 0.1400 45,982.800 3-Nov-93 Operational
(24 hours operation) 2 DALE-PERKINS 0.1630 0.1400 45,229.520 3-Nov-93 Operational
70 (CELCO) 3 DALE-PERKINS 0.2500 0.2000 44,802.900 13-Dec-04 Operational
4 PERKINS 0.3150 0.3000 8,100.580 4-Mar-16 Operational
Total : 0.8910 0.7800 0.382 0.108 0.197 0.398 0.392
Siquijor Grid
NPP Siquijor Island Power Corporation 1 Bunker 6.4640 6.4640 10-Feb-15 Operational
71
(PROSIELCO) Total : 6.4640 6.4640

SPU-OPA-004.F05
Rev.0 11 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
72 . GIGANTES DPP, Iloilo 1 DALE-PERKINS 0.1630 0.1304 27,677.830 17-Apr-97 Operational
(24 hours operation) 2 DALE-PERKINS 0.1630 0.1304 25,389.600 23-Aug-07 Operational
72 3 CUMMINS 0.3360 0.2688 4,591.820 25-Oct-16 Operational At 260kW load is already showing red hot condition
(IlECO III)
Note: Increase in OH (8 to 16) on 25 Feb 2017 4 CUMMINS 0.3360 0.2688 109.660
Increase in OH (16 to 24) on 11 Dec 2017 Total : 0.9980 0.7984 0.351 0.104 0.201 0.447 0.375

73 . CALUYA DPP, Antique 1 DALE-PERKINS 0.1630 0.1304 46,174.110 21-Sep-92 Operational


(24 hours operation) 2 DALE-PERKINS 0.1630 0.1304 47,147.510 21-Sep-93 Operational
(ANTECO) 5 CUMMINS-STAMFORD 0.3640 0.2912 1,975.430 8-May-14 Operational
73 6 CUMMINS-FILGEN 0.3200 0.2560 9,641.910 30-May-15 Operational
7 CUMMINS-FILGEN 0.3200 0.2560 3,988.930 13-Aug-15 Operational
8 CUMMINS 0.3000 0.2400 2,073.320 4-May-17 Operational
Total : 1.6300 1.3040 0.340 0.102 0.202 0.964 0.422
74 . BAGONGBANWA DPP, Bohol 1 PERKINS 0.0380 0.0320 36,959.000 23-Dec-99 Operational
(8 hours operation) Total : 0.0380 0.0320 0.023 0.007 0.021 0.009 0.0252
74
4:00PM-12:00MN
(BOHECO I)
75 . BALICASAG DPP, Bohol 1 PERKINS 0.0380 0.0323 31,379.840 23-Dec-99 Operational
(24 hours operation) 2 PERKINS 0.1050 0.0800 2,643.000 22-Jan-17 Operational
(BOHECO I)
3 CUMMINS 0.1060 0.0800 757.600 25-Oct-17 Operational
Note: Increase in OH (6 to 8) on 01 Jan 2017
75
Increase in OH (8 to 24) on 04 Sept 2017 4 CUMMINS 0.1060 0.0800 816.500 27-Sep-17 Operational
Total : 0.3550 0.2723 0.033 0.004 0.016 0.239 0.0460

76 . BATASAN DPP, Bohol 1 PERKINS 0.0560 0.0476 39,642.000 23-Dec-99 Operational


(8 hours operation) Total : 0.0560 0.0476 0.017 0.006 0.013 0.031 0.0272
76
4:00PM-12:00MN
(BOHECO I)
77 . BILANGBILANGAN DPP, Bohol 1 PERKINS 0.0150 0.0128 33,136.000 14-Apr-16 Operational
(8 hours operation) Total : 0.0150 0.0128 0.006 0.002 0.005 0.006 0.0119
77 4:00PM-12:00MN
(BOHECO I)
Note: Increase in OH (4 to 8) on 01 Jan 2017
78 . CABUL-AN DPP DPP, Bohol 1 CUMMINS 0.0640 0.0563 5,631.400 14-Nov-13 Operational
(8 hours operation) 2 FG-WILSON 0.1050 0.0800 1,902.200 6-Dec-16 Operational
78 4:00PM-12:00MN 3 CUMMINS 0.0800 0.0800 669.700 27-Jan-17 Operational
(BOHECO I) Total : 0.2490 0.2163 0.071 0.021 0.050 0.145 0.0800
Note: Increase in OH (6 to 8) on 01 Jan 2017

Not operational since 04 July 2017 due to white smoke


and engine breather; unit was overdue for PMS ;
79 . CUAMING DPP, Bohol 1 PERKINS 0.0860 0.0731 34,931.850 23-Oct-99 Non-operational
tentative date of restoration is on 31 March 2018;NOTE:
For correction of dependable capacity in the MOR
79
(8 hours operation) 2 FG WILSON 0.1050 0.0800 1,170.000 25-Jun-17 Operational
4:00PM-12:00MN Total : 0.1910 0.1531 0.057 0.006 0.040 0.096 0.0600
(BOHECO I)

80 . HAMBONGAN DPP, Bohol 1 PERKINS 0.0200 0.0170 32,742.300 23-Dec-99 Operational


(8 hours operation) Total : 0.0200 0.0170 0.013 0.004 0.009 0.005 0.0170
80 3:00PM-11:00PM
(BOHECO I)
Note: Increase in OH (4 to 8) on 01 Jan 2017

SPU-OPA-004.F05
Rev.0 12 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
81 . MANTATAO DPP, Bohol 1 PERKINS 0.0380 0.0323 31,951.000 23-Dec-99 Operational
(8 hours operation) Total : 0.0380 0.0323 0.015 0.005 0.013 - 0.0170
81 3:00PM-11:00PM
(BOHECO I)
Note: Increase in OH (4 to 8) on 01 Jan 2017
82 . MOCABOC DPP, Bohol 1 CUMMINS 0.0200 0.0170 33,129.750 23-Dec-99 Operational
(8 hours operation) Total : 0.0200 0.0170 0.011 0.004 0.008 0.006 0.0157
82 4:00PM-12:00MN
(BOHECO I)
Note: Increase in OH (5 to 8) on 01 Jan 2017
83 . PAMILACAN DPP, Bohol 1 PERKINS 0.0560 0.0476 35,814.200 23-Dec-99 Operational
'(24 hours operation) 2 CUMMINS 0.0800 0.0800 2,626.500 13-May-17 Operational
83
(BOHECO I) Total : 0.1360 0.1276 0.041 0.007 0.019 0.087 0.0550
Note: Increase in OH (8 to 24) on 05 Sept 2017
84 . PANGAPASAN DPP, Bohol 1 PERKINS 0.0380 0.0323 26,853.000 23-Dec-99 Operational
(8 hours operation) Total : 0.0380 0.0323 0.013 0.005 0.009 0.020 0.0200
84 4:00PM-12:00MN
(BOHECO I)
Note: Increase in OH (5 to 8) on 01 Jan 2017
85 . UBAY DPP, Bohol 1 KUBOTA 0.0120 0.0102 11,694.000 23-Dec-99 Operational
(8 hours operation) Total : 0.0120 0.0102 0.005 0.003 0.004 0.005 0.0090
85 4:00PM-12:00MN
(BOHECO I)
Note: Increase in OH (5 to 8) on 01 Jan 2017
B. EASTERN VISAYAS AREA:
86 . MARIPIPI DPP, Biliran 1 DALE-PERKINS 0.1630 0.1390 48,931.150 26-Sep-94 Operational

(24 hours operation) 2 DALE-PERKINS 0.1630 0.1390 47,934.160 26-Sep-94 Operational


86
Note: Increase in OH (16 to 24) on 15 Nov 2017 3 CUMMINS 0.1500 0.1280 13,959.780 19-Oct-98 Operational
(MMPC) 4 FG-WILSON 0.3150 0.2680 4,595.860 13-Sep-16 Operational
Total : 0.7910 0.6740 0.195 0.085 0.106 0.479 0.214
87 . LIMASAWA DPP, Southern Leyte 1 DALE-PERKINS 0.1630 0.1400 41,595.910 26-Jul-95 Operational
(24 hours operation)
Unit no. 2 - 163 kW Dale Perkins was not operational
since 12 Nov 2016 due to damaged crankshaft; PR nos.
(SOLECO)
S2-LIM17-004 and S2-LIM17-010 for repair of engine
Note: Increase in OH (16 to 24) on 02 October 2017
block, crankshaft and camshaft and replacement parts
2 DALE-PERKINS 0.0000 0.0000 0.000 24-Jul-02 Non-operational
are still on process. The genset is also due for 20K PMS
87 which shall be performed simultaneously with the
corrective maintenance; genset was deactivated since
November 2017.

3 PERKINS 0.3000 0.2800 4,250.700 21-Dec-16 Operational


4 DALE-PERKINS 0.3150 0.3000 982.180 6-Dec-16 Operational
Total : 0.7780 0.7200 0.186 0.053 0.096 0.534 0.206

SPU-OPA-004.F05
Rev.0 13 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
Plant shutdown on 15 - 17 December 2017 due to
88 . ZUMARRAGA DPP, Western Samar 1 DALE-PERKINS 0.1630 0.1380 61,638.790 14-Jun-94 Operational
typhoon Urduja
(24 hours operation) 2 DALE-PERKINS 0.1630 0.1380 37,315.510 13-Sep-94 Operational
(SAMELCO II) 3 DALE PERKINS 0.1630 0.1380 41,645.280 14-Jun-09 Operational

Not operational since 08 Jun 2017 due to defective fuel


88
injection pump and controller; PR no. S2-ZDP17-018 for
4 PERKINS 0.1000 0.0000 8,982.700 1-Mar-09 Non-operational
the replacement parts is still on process; tentative date
of restoration is on 28 February 2018

5 CUMMINS 0.3360 0.3000 4,935.810 20-Nov-16 Operational


Total : 0.9250 0.7140 0.321 0.038 0.148 0.393 0.382
89 . TAGAPUL-AN DPP, Western Samar 1 DALE-PERKINS 0.1630 0.1390 21,766.650 3-Aug-96 Operational
(8 hours operation) 2 DALE-PERKINS 0.1000 0.0850 16,032.060 8-Feb-09 Operational
89
4:00PM-12:00MN 3 DALE-PERKINS 0.1630 0.1390 1,379.100 26-Nov-16 Operational
(SAMELCO I) Total : 0.4260 0.3630 0.125 0.040 0.078 0.238 0.125
90 . ALMAGRO DPP, Western Samar 1 PERKINS 0.1630 0.1300 32,930.320 5-Apr-97 Operational
Not operational since 06 December 2017 due to brunt
(8 hours operation) 3 DALE-PERKINS 0.1000 0.0900 13,980.650 18-Sep-09 Non-operational stator winding. Tentative date of restoration on 28
90
February 2018.
4:00PM-12:00MN 4 PERKINS 0.1930 0.1600 810.000 9-Apr-17 Operational
(SAMELCO I) Total : 0.4560 0.3800 0.084 0.020 0.061 0.296 0.105
91 . STO. NIÑO DPP, Western Samar 1 DALE-PERKINS 0.1630 0.1400 31,414.170 28-Feb-97 Operational
(8 hours operation) Total : 0.1630 0.1400 0.119 0.028 0.083 0.021 0.130
91
4:00PM-12:00MN
(SAMELCO I)
92 . CAMANDAG DPP, Western Samar 2 CUMMINS 0.1060 0.0900 1,475.000 4-Apr-17 Operational
(8 hours operation) Total : 0.1060 0.0900 0.070 0.009 0.041 0.020 0.074
92
4:00PM-12:00MN
(SAMELCO I)
93 . SAN ANTONIO DPP, Northern Samar 1 DALE-PERKINS 0.1630 0.1300 43,816.510 1-Nov-96 Operational
(24 hours operation) 2 DALE-PERKINS 0.2500 0.2000 47,573.140 1-Nov-96 Operational

Scheduled for maintenance on July 2015 but no spare


parts available; PR (S2-ANT17-004) for the needed parts
93 (NORSAMELCO) 3 DALE-PERKINS 0.1630 0.0000 39,282.240 5-Jun-05 Non-operational
is still on process; tentative date of restoration is on 28
February 2018.

4 CUMMINS 0.3360 0.3000 6,696.300 20-Dec-16 Operational


Total : 0.9120 0.6300 0.239 0.053 0.128 0.391 0.325

Not operational since 08 December 2017 due to seizure


94 . CAPUL DPP, Northern Samar 1 DALE-PERKINS 0.1630 0.1300 33,972.430 1-Jul-95 Operational of cylinders 3 and 4; observed spark at generator.
Tentative date of restoration 28 February 2018.

(24 hours operation) 2 DALE-PERKINS 0.1630 0.1300 36,185.250 1-Jul-95 Operational

Increased in operation from 16 hrs to 24 hrs on 01 Nov


3 FG-WILSON 0.1925 0.1600 3,300.100 19-Oct-16 Operational
2017
94
Not operational since 25 November 2017 due to low
lube oil pressure; lube oil was contaminated with diesel
(NORSAMELCO) 4 FG-WILSON 0.1925 0.1600 0.000 19-Oct-16 Not operational fuel. Under warranty bvy the supplier. No tentative
date of restoration. NOTE: for correction in the MOR
(dep. cap.)

Note: Increase in OH (8 to 16) on 07 Feb 2017 Total : 0.7110 0.5800 0.232 0.045 0.086 0.348 0.290

SPU-OPA-004.F05
Rev.0 14 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
95 . SAN VICENTE DPP, Northern Samar 1 DALE-PERKINS(VIS) 0.1630 0.1380 31,072.220 26-May-97 Operational

Failed to start on 12 Jul 2017; no fuel flow from Fuel


Injection Pump to injectors; defective electronic
controller and lift pump; VMTSD personnel repaired and
(16 hours operation) 2 PERKINS(VIS) 0.1000 0.0000 14,135.583 12-Mar-09 Non-operational
95 installed the fuel injection pump but the engine still
failed to start; FIP for repair and calibration in Cebu City;
tentative date of restoration is on 28 February 2018.

8:00AM-12:00MN Total : 0.2630 0.1380 0.078 0.016 0.047 0.060 0.098


(NORSAMELCO)
Note: Increase in OH (8 to 16) on 06 Feb 2017
Not operational since 23 December 2017 due to burnt
96 . BIRI DPP, Northern Samar 1 DALE-PERKINS 0.1630 0.1300 35,353.160 4-Dec-97 Operational generator stator. For replacement of generator stator.
Tentative date of restoration on 28 February 2018.
96
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1300 39,856.300 6-Dec-97 Operational
8:00AM-12:00MN 3 DALE PERKINS 0.1630 0.1300 20,693.000 12-Aug-09 Operational
(NORSAMELCO) 4 CUMMINS 0.3360 0.3000 3,582.510 6-Dec-16 Operational
Total : 0.8250 0.6900 0.226 0.073 0.160 0.464 0.357
97 . BATAG DPP, Northern Samar 1 CUMMINS 0.0500 0.0430 6,049.000 19-Mar-13 Operational
(8 hours operation) Total : 0.0500 0.0430 0.039 0.010 0.017 0.004 0.039
97 4:00PM-12:00MN
(NORSAMELCO)
Note: Increase in OH (6 to 8) on 06 Feb 2017
III. SPUG - MINDANAO :
A. WESTERN MINDANAO AREA:
Basilan Grid
Not operational since 26 September 2017 due to
98 . BASILAN DPP, Basilan 1 CKD 1.2240 0.0000 20,016.900 7-Sep-98 Non-operational defective main & conrod bearing #1. No tentative date
of restoration.

Not operational since 16 November 2017 due to


(24 hours operation) 4 CUMMINS 0.5450 0.0000 5,952.870 3-Aug-11 Non-operational
defective fan belt. No tentative date of restoration.

(BASELCO) 5 CUMMINS 0.5450 0.3800 7,722.810 3-Aug-11 Operational

Not operational since 16 November 2017 due to


6 CUMMINS 0.5450 0.0000 6,868.690 3-Aug-11 Non-operational
defective fan belt. No tentative date of restoration.

Sub-total (owned) 2.8590 0.3800


MONARK EQUIPMENT CORP. (RENTAL) 7 CATERPILLAR-RENTAL 1.5000 1.2000 32,597.000 25-Sep-13 Operational Contracted Capacity: 2 MW
8 CATERPILLAR-RENTAL 1.5000 1.2000 26,988.640 25-Sep-13 Operational Contract Period: 01 Aug 2017 to 31 Jul 2018
9 CATERPILLAR-RENTAL 1.5000 1.2000 34,222.600 25-Sep-13 Operational
10 CATERPILLAR-RENTAL 0.6000 0.5000 11,285.000 1-Feb-15 Operational Contracted Capacity: 3 MW
98
11 CATERPILLAR-RENTAL 1.0000 0.8500 9,305.000 24-Feb-16 Operational Contract Period: 02 Sept 2017 to 01 Sept 2018
12 CATERPILLAR-RENTAL 1.0000 0.8500 8,456.000 24-Feb-16 Operational
13 CAT-RENTAL 1.2500 1.0000 10,442.000 2-Aug-16 Operational Contracted Capacity: 3 MW
14 CAT-RENTAL 1.2500 1.0000 9,950.000 2-Aug-16 Operational Contract Period: 26 May 2017 to 25 May 2018
15 CATERPILLAR-RENTAL 0.6000 0.5000 8,913.000 1-Apr-17 Operational
16 CATERPILLAR-RENTAL 0.6000 0.5000 4,091.000 1-Apr-17 Operational
17 CAT-RENTAL 1.2500 1.0000 956.000 2-Aug-17 Operational
Sub-total (rental) 12.0500 9.8000
Total : 14.9090 10.1800

SPU-OPA-004.F05
Rev.0 15 of 20
SMALL POWER UTILITIES GROUP
98
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
99 . POWER BARGE 119, Basilan 2 DAIHATSU 1.8000 1.2000 89,159.550 1-Jun-95 Operational
3 DAIHATSU 1.8000 1.3000 119,893.220 1-Jun-95 Operational
(24 hours operation) 4 DAIHATSU 1.8000 1.3000 116,539.550 1-Jun-95 Operational
(BASELCO) Sub-total 5.4000 3.8000
KUMALARANG Mini-Hydro 1 WILKS 0.3400 0.2000 1998 Operational
2 WILKS 0.3400 0.2000 1998 Operational
Sub-total (Hydro) 0.6800 0.4000
Total Basilan Grid : 20.9890 14.3800 9.320 4.830 * 5.060 9.864 * - No data from Coop Mini-Hydro
100 . JOLO DPP, Sulu 1 DAIHATSU 1.8000 1.2000 157,739.350 1-May-95 Operational
(24 hours operation) 3 DAIHATSU 1.8000 1.2000 167,130.250 1-Sep-95 Operational
(SULECO) Sub-total (owned) 3.6000 2.4000
MONARK EQUIPMENT CORP. (RENTAL) 4 CAT-RENTAL 1.0000 0.8000 2,082.350 22-Mar-16 Operational Contracted Capacity: 1.5 MW
5 CAT-RENTAL 1.3600 1.1000 12,581.870 26-Jan-16 Operational Contract Period: 11 Jul 2016 to 10 Jan 2018 (extended)
6 CAT-RENTAL 1.3600 1.1000 11,455.020 26-Jan-16 Operational
7 CAT-RENTAL 1.3600 1.1000 7,880.000 26-Jan-16 Operational Contracted Capacity: 3 MW
99
8 CAT-RENTAL 1.3600 1.1000 12,622.730 26-Jan-16 Operational Contract Period: 25 Jul 2016 to 24 Jan 2018 (extended)
9 CAT-RENTAL 1.3600 1.1000 18,371.330 26-Jan-16 Operational
10 CAT-RENTAL 1.3600 1.1000 19,645.100 26-Jan-16 Operational Contracted Capacity: 3 MW
11 CAT-RENTAL 1.3600 1.1000 5,762.040 1-Aug-16 Operational Contract Period: 25 May 2017 to 24 May 2018
12 CAT-RENTAL 0.5450 0.4000 4,500.770 1-Aug-16 Operational
Sub-total (rental) 11.0650 8.9000
Total : 14.6650 11.3000 8.600 1.400 5.864 2.700 8.850
101 . LUUK DPP, Sulu
100
(on standby) Total : 0.0000 0.0000 - - - - 0.000 Note: All units are deactivated since 20 Apr 2017
102 . PANGUTARAN DPP, Sulu 1 PERKINS 0.1930 0.1600 1,511.300 28-Mar-17 Operational
(8 hours operation)
On standby this period due to higher capacity compared
Increased in operation from 6 hrs to 8 hrs on 11
101 2 PERKINS 0.3000 0.2100 133.700 28-Mar-17 Operational to unit#1 which is being utilized for the whole period
December 2017
due to lower plant demand.
Not operational since 30 November 2017 due to fan
5:00PM-1:00AM Total : 0.4930 0.3700 0.090 0.054 0.070 0.280 0.090
adaptor bearing seizure. Restored on 05 December
(SULECO)
Not operational since 30 November 2017 due to fan
103 . SIASI DPP, Sulu 2 CUMMINS 0.6750 0.6000 5,016.000 13-Mar-17 Operational adaptor bearing seizure. Restored on 05 December
2017.
(24 hours operation) 3 PERKINS 0.6000 0.4200 5,075.000 30-Apr-14 Operational
(SIASELCO) 4 DALE-PERKINS 0.2600 0.2000 47,662.000 1-Oct-91 Operational
102 Not operational since 25 October 2017 due to dettached
conrod cap at cylinder #5; conduct evaluation and
5 MAN - DIESEL 0.5000 0.0000 38,994.250 24-May-08 Non-operational
assessment on the root cause of the accident; no
tentative date of restoration.

6 MAN-DIESEL 0.5000 0.4000 40,401.000 25-May-08 Operational


Total : 2.5350 1.6200 0.790 0.377 0.473 0.830 0.820

SPU-OPA-004.F05
Rev.0 16 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
Tawi-Tawi (Mainland) Grid
104 . BONGAO DPP, Tawi-Tawi 4 PERKINS 0.5440 0.3500 11,229.720 7-Feb-09 Operational
(24 hours operation) Sub-total (owned) 0.5440 0.3500
(TAWELCO) 5 CAT-RENTAL 1.0000 0.7000 13,853.000 1-Apr-16 Operational Contracted Capacity:4 MW
MONARK EQUIPMENT CORP. (RENTAL) 6 CAT-RENTAL 1.0000 0.7000 14,329.000 1-Apr-16 Operational Contract Period: 20 Sep 2017 to 19 Sep 2018
7 CAT-RENTAL 1.5000 1.0000 7,502.000 12-May-16 Operational
9 CAT-RENTAL 1.3600 1.0000 3,086.000 17-Sep-17 Operational Contracted Capacity:1 MW
10 CAT-RENTAL 1.3600 1.0000 1,029.000 20-Sep-17 Operational Contract Period: 25 Oct 2017 to 24 Oct 2018
11 CAT-RENTAL 0.9100 0.6000 8,243.000 22-Sep-17 Operational
12 CAT-RENTAL 1.3600 1.0000 7,874.000 26-Nov-17 Operational
Sub-total (rental) 8.4900 6.0000
Total 9.0340 6.3500
103 Unit no. 1 - 1.800 MW was not operational since 12 Jun
2017 due to seizure of connecting rod journal no. 4;
requested price reference to include in the budget for
105 . POWER BARGE 108, Tawi-Tawi 0 DAIHATSU 0.0000 0.0000 95,219.690 1-Mar-92 Deactivated adjusment and bases for PR preparation of ABC and
adjusted PPMP/APP; said PR shall be processed once
completed and approved; deactivated in November
2017

Power barge was not operational since 07 October 2017


(24 hours operation) 0 DAIHATSU 0.0000 0.0000 102,379.960 1-Mar-92 Non-operational due to rapid intrusion of sea water at bottom bilge.
Power barge was deactivated on 27 November 2017

(TAWELCO) Sub-total 0.0000 0.0000


Total Bongao Grid : 9.0340 6.3500 4.020 2.700 2.930 2.330 4.250
106 . BALIMBING DPP, Tawi-Tawi 1 DALE-PERKINS 0.1630 0.1500 33,577.400 13-Jan-97 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1500 29,869.450 1-Jul-98 Operational
Weekdays 2:00 PM-6:00AM 3 CUMMINS 0.1500 0.1300 8,580.810 12-Oct-11 Operational
Weekends 12:00NN-4:00AM
(TAWELCO) Series of testing was conducted since Jan 2017 but
cannot synchronize; declared not operational on 26 Apr
2017 due to seizure of bearing and defective connecting
104 rod & crankshaft; requested technical assistance from
4 CUMMINS 0.2500 0.0000 6,898.530 4-Mar-11 Non-operational
MMTSD for corrective maintenance and awaiting for the
arrival of the needed spare parts (PR no. S3-BAD17-002
for award to the winning bidder). No tentative date of
restoration.

5 CUMMINS 0.3360 0.3000 1,838.280 11-Mar-17 Operational


Total : 1.0620 0.7300 0.235 0.130 0.156 0.495 0.245
107 . TANDUBAS DPP, Tawi - Tawi 3 CUMMINS 0.1500 0.1300 14,847.500 6-Aug-09 Operational
(8 hours operation) 4 PERKINS 0.3000 0.2100 2,374.700 26-Feb-17 Operational
105
4:00PM-12:00MN Total : 0.4500 0.3400 0.209 0.074 0.152 0.131 0.209
(TAWELCO)
108 . SIBUTU DPP, Tawi-Tawi 1 DALE-PERKINS 0.1630 0.1400 41,898.290 2-Nov-98 Operational
(16 hours operation) Not operational since 01 Jun 2017 due to damaged
2:00PM-6:00AM crankshaft gear oil pump; borrowed crankshaft
2 DALE-PERKINS 0.1630 0.0000 26,515.690 12-Apr-03 Non-operational
(TAWELCO) assembly from Ninoy Aquino DPP; no tentative date of
106
Note: Increase in OH (12 to 16) on 16 Apr 2017 restoration
3 PERKINS 0.1930 0.1600 4,734.900 30-Jun-16 Operational
4 PERKINS 0.3000 0.1900 2,184.880 25-Feb-17 Operational
Total : 0.8190 0.4900 0.225 0.065 0.148 0.265 0.280

SPU-OPA-004.F05
Rev.0 17 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
109 . SITANGKAI DPP, Tawi-Tawi 1 CUMMINS 0.2800 0.1200 2,029.000 19-Aug-09 Operational
(16 hours operation) 3 PERKINS 2800 0.5440 0.4900 6,900.520 27-Feb-10 Operational
107 2:00PM-6:00AM 5 FG-WILSON 0.1930 0.1600 2,430.500 23-Jul-16 Operational
(TAWELCO) 6 FG-WILSON 0.3150 0.3000 3,499.010 30-Jan-17 Operational
Note: Increase in OH (12 to 16) on 16 Feb 2017 Total : 1.3320 1.0700 0.354 0.081 0.261 0.716 0.360
110 . MANUK-MANGKAW DPP, Tawi Tawi 1 DALE-PERKINS 0.1630 0.1500 40,747.920 14-Jul-97 Operational
(8 hours operation) Total : 0.1630 0.1500 0.100 0.030 0.083 0.050 0.120
108 4:00PM-12:00MN
(TAWELCO)
Note: Increase in OH (6 to 8) on 27 May 2017
111 . WEST SIMUNUL DPP, Tawi-Tawi 1 PERKINS 0.3000 0.2100 2,156.360 28-Feb-17 Operational High fuel rate
(14 hours operation) 2 CUMMINS-2 0.2500 0.1300 9,514.150 10-Aug-09 Operational High fuel rate
109 4:00PM-6:00AM 3 DALE-PERKINS 0.2600 0.2200 55,013.810 25-Sep-02 Operational
(TAWELCO) 4 PERKINS 0.1630 0.1500 11,668.020 30-Mar-11 Operational
Note: Increase in OH (8 to 14) on 27 May 2017 Total : 0.9730 0.7100 0.450 0.130 0.205 0.260 0.450
112 . LANGUYAN DPP, Tawi-Tawi 1 PERKINS - FG WILSON 0.1050 0.0800 50.910 Operational
(8 hours operation) 2 PERKINS - FG WILSON 0.1050 0.0800 38.520 Operational
110 4:00PM-12:00MN Total : 0.2100 0.1600 0.076 0.022 0.075 0.084 0.076
(TAWELCO)
Note: Starts of commercial oper on 19 Sept 2017
113 . MAPUN DPP, Tawi-Tawi 1 DALE-PERKINS 0.2600 0.2000 33,363.750 26-Sep-92 Operational
(16 hours operation) 3 MAN 0.5000 0.4300 22,378.350 16-Oct-08 Operational
111 2:00PM-6:00AM 4 FG-WILSON 0.3150 0.3000 1,861.480 7-May-16 Operational
(CASELCO) 5 CUMMINS 0.6720 0.6000 1,821.000 4-Jul-17 Operational
Note: Increase in OH (12 to 16) on 25 Jul 2017 Total : 1.7470 1.5300 0.400 0.200 0.259 1.130 0.480
114 . TANDUBANAK DPP, Tawi-Tawi 1 Cummins 0.2750 0.1700 1,457.330 22-Aug-09 Operational
(12 hours operation) 2 CUMMINS 0.1600 0.1100 1,281.500 22-Aug-09 Operational
112 12:00NN-12:00MN 3 FG-WILSON 0.1930 0.1600 2,067.100 22-Jul-16 Operational
(TAWELCO) 4 PERKINS 0.3000 0.2100 1,612.600 16-Mar-17 Operational
Note: Increase in OH (8 to 12) on 01 May 2017 Total : 0.9280 0.6500 0.235 0.070 0.150 0.415 0.235

115 . SACOL DPP, Zamboanga 1 CUMMINS 0.1500 0.1400 17,701.200 6-Sep-08 Operational

Not operational since 27 September 2017 due to hard


(16 hours operation) 2 PERKINS 0.1050 0.0000 3,830.000 2-Apr-16 Non-operational
113 starting. No tentative date of restoration.

Not operational since 01 November 2017 due to hard


1:00PM-5:00AM 3 FG-WILSON 0.1050 0.0800 2,517.740 27-Dec-16 Operational
starting. Restored 23 December 2017.
(ZAMCELCO)
Total : 0.3600 0.2200 0.092 0.040 0.069 0.128 0.099
Note: Increase in OH (12 to 16) on 27 May 2017

SPU-OPA-004.F05
Rev.0 18 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
B. EASTERN MINDANAO AREA:
Dinagat Grid
116 . DINAGAT DPP, Dinagat 1 MAN 0.5000 0.3800 26,558.570 22-Sep-09 Operational
(24 hours operation) 2 MAN 0.5000 0.3800 27,869.300 22-Sep-09 Operational
(DIELCO) 3 CUMPER-PERKINS 0.2750 0.1900 40,155.080 27-Feb-05 Operational
4 CUMPER 0.2750 0.1900 44,317.010 17-Jul-05 Operational
5 CUMPER 0.2750 0.1900 38,906.980 25-Nov-04 Operational
6 CUMPER 0.2750 0.2000 43,513.640 24-Nov-04 Operational
7 CUMPER 0.2750 0.2000 44,123.980 17-Jul-05 Operational
17 CUMMINS 1.6000 1.5000 100.200 17-Jul-05 Operational
Sub-total (owned) 3.9750 3.2300
MONARK EQUIPMENT CORP. (RENTAL) 9 CAT-RENTAL 0.6800 0.5500 10,923.200 1-Dec-14 Operational Contracted Capacity: 2 MW
12 CAT-RENTAL 0.9100 0.7400 11,183.000 17-Mar-16 Operational Contract Period: 16 August 2017 to 15 Aug 2018
114
13 CAT-RENTAL 0.5450 0.4200 11,308.200 17-Mar-16 Operational
14 CAT-RENTAL 0.6800 0.5500 10,340.400 25-Sep-16 Operational
15 CAT-RENTAL 0.9100 0.7400 7,031.000 8-Oct-16 Operational Contracted Capacity: 0.5 MW
16 CAT-RENTAL 0.7240 0.5800 7,796.400 1-Mar-17 Operational Contract Period: 25 Sep 2016 to 25 Dec 2017 (contract
18 CAT-RENTAL 0.9100 0.7400 101.900 20-Dec-17 Operational no. LOG MSSP 2016-06-068-JPP)
19 CAT-RENTAL 0.5450 0.4200 1,108.000 20-Dec-17 Operational
20 CAT-RENTAL 0.5450 0.4200 1,353.300 20-Dec-17 Operational
Sub-total (rental) 6.4490 5.1600
Total 10.4240 8.3900
117 . LORETO DPP, Dinagat 3 MANS 0.5000 0.3800 13,084.650 6-Oct-07 Operational
Back-Up/On Standby Sub-total 0.5000 0.3800
(DIELCO) Total Dinagat Grid : 10.9240 8.7700 3.801 1.646 2.198 4.969 3.845
118 . HIKDOP DPP, Surigao del Norte 1 DALE-PERKINS 0.1630 0.1550 41,600.180 5-Sep-93 Operational

Not operational since 24 Mar 2017 due to defective fuel


injection pump; PR no. S3-HKD17-013 dated 30 Mar
(16 hours operation) 2 CUMMINS 0.1200 0.0960 8,619.210 6-Oct-10 Non-operational
2017 is still on process; No tentative date of restoration.
115
NOTE: for MOR correction (dep cap)

12:00NN-04:00AM 3 FG-WILSON 0.1930 0.1600 994.500 13-Oct-16 Operational


(SURNECO) 4 FG-WILSON 0.1050 0.0800 2,366.100 13-Oct-16 Operational
Total : 0.5810 0.4910 0.130 0.040 0.078 0.361 0.147
119 . KALAMANSIG DPP, Sultan Kudarat 1 FG WILSON,PERKINS 0.6000 0.4000 24,134.500 17-Mar-16 Operational
(24 hours operation) 3 PERKINS 0.6000 0.4000 16,133.020 17-Mar-16 Operational
4 PERKINS 0.5400 0.3500 14,273.000 25-Sep-16 Operational
6 PERKINS 0.5600 0.3500 62,878.700 11-Jul-09 Operational
21 PERKINS 0.5600 0.3000 48,996.960 17-Jun-93 Operational Recommissioned on 20 Jan 2017.
24 CUMMINS 0.6720 0.6000 699.560 19-Feb-17 Operational
25 CUMMINS 0.6720 0.6000 693.010 19-Feb-17 Operational
116 Sub-total (owned) 4.2040 3.0000
MONARK EQUIPMENT CORP. (RENTAL) 23 MONARK-RENTAL 0.7250 0.6000 5,892.000 30-Jan-17 Operational Contracted Capacity: 3 MW
26 MONARK-RENTAL 0.9100 0.7000 8,519.000 28-Feb-17 Operational Contract Period: 25 Feb 2017 to 24 Feb 2018
27 MONARK-RENTAL 1.3600 1.0000 3,948.000 27-Jul-17 Operational
28 MONARK RENTAL 0.9100 0.8000 2,261.000 17-Sep-17 Operational
29 MONARK-RENTAL 0.9100 0.8000 2,240.000 29-Nov-17 Operational
Sub-total (rental) 4.8150 3.9000
Total : 9.0190 6.9000 4.228 1.402 2.432 2.672 4.228
120 . SEN. NINOY AQUINO DPP, Sultan Kudarat 1 DALE-PERKINS 0.1630 0.1450 49,759.520 27-Mar-98 Operational
(16 hours operation) 2 DALE-PERKINS 0.2600 0.1800 54,249.160 22-Mar-98 Operational
8:00AM-12:00MN 3 PERKINS 0.2600 0.1800 49,168.950 11-May-11 Operational
117 (SUKELCO) 4 PERKINS 0.1630 0.1450 46,788.600 1-Feb-15 Operational
10 CUMMINS 0.6720 0.6000 2,585.070 23-Feb-17 Operational
Sub-total (owned) 1.5180 1.2500
Total : 1.5180 1.2500 0.859 0.303 0.493 0.391 0.859

SPU-OPA-004.F05
Rev.0 19 of 20
SMALL POWER UTILITIES GROUP
POWER PLANTS/POWER BARGES OPERATIONAL REPORT FOR EXISTING AREAS
As of December 25, 2017

PLANT, PROVINCE GENSETS PARTICULARS SYSTEM DEMAND MAXIMUM


GROSS
Grid Plant (Operating Hours) ACCUMULATED SYTEM COMM'SNG
RESERVE STATUS REMARKS
No. No. Time of Operation RUNNING HOURS DEMAND DATE
(DEFICIENCY)
(Distribution Utility) UNIT RATED DEP. MAX MIN AVE (2017)
MAKE
NO. (MW) (MW) (MW) (MW) (MW)
121 . PALIMBANG DPP, Sultan Kudarat 1 DALE-PERKINS 0.1630 0.1500 44,925.420 28-Apr-99 Operational
(16 hours operation)
8:00AM-12:00MN
(SUKELCO) Not operational since 07 Jul 2017 due to cracked
2 Cummins 0.2750 0.1200 8,482.590 21-Dec-10 Non-operational cylinder head; awating for the replacement part from
Sitangkai DPP; Restored 10 December 2017.
118

3 DALE-PERKINS 0.2600 0.1800 85,513.020 12-May-13 Operational


4 FG-WILSON 0.1930 0.1600 3,255.900 18-Oct-16 Operational
5 FG-WILSON 0.1050 0.0800 1,000.700 18-Oct-16 Operational
Total : 0.9960 0.6900 0.330 0.070 0.197 0.360 0.331

122 . BALUT DPP, Davao Occidental 1 DALE-PERKINS 0.1630 0.1400 29,913.640 27-Sep-97 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1500 27,378.550 16-Jan-98 Operational
12:00NN-4:00AM 3 DALE-PERKINS 0.1630 0.1400 50,183.660 11-Nov-15 Operational
119 (DASURECO) 4 FG-WILSON 0.1930 0.1600 4,480.160 26-Sep-16 Operational
5 FG-WILSON 0.1050 0.0800 42.200 20-Dec-16 Operational
Total : 0.7870 0.6700 0.176 0.061 0.121 0.494 0.179

123 . TALICUD DPP, Davao del Norte 1 DALE-PERKINS 0.1630 0.1300 43,945.450 26-Aug-96 Operational
(16 hours operation) 2 DALE-PERKINS 0.1630 0.1300 33,017.620 26-Aug-96 Operational
12:00NN-4:00AM 3 DALE-PERKINS 0.2600 0.1900 49,107.300 18-Dec-91 Operational
120
(DANECO) 4 FG-WILSON 0.1930 0.1600 4,129.500 8-Oct-16 Operational
5 FG-WILSON 0.1050 0.0800 51.600 26-Oct-16 Operational
Total : 0.8840 0.6900 0.278 0.100 0.193 0.412 0.295

SUMMARY (EXISTING POWER PLANT AND BARGES) :


NO. OF SYSTEM DEMAND GROSS
SMALL POWER UTILITIES GROUP
PLANTS RATED DEP. MAX MIN AVE RESERVE
TOTAL LUZON 203 112.190 87.242 49.7128 19.415 23.103 71.859
Land-Based 59 90.589 72.717
Power Barge 4 17.810 10.950
Mini-Grid 3 0.629 0.540
Wind 1 0.000 0.000
Hydro 1 1.800 1.800
PRES 135 1.362 1.235
TOTAL VISAYAS 46 23.563 15.724 6.7868 2.221 3.953 8.920
Land-Based 30 15.423 11.920
Power Barge 2 6.300 2.500
Mini-Grid 14 1.840 1.304
TOTAL MINDANAO 26 79.789 59.131 34.9980 13.825 16.605 24.533
Land-Based 24 74.389 55.331
Power Barge 2 5.400 3.800
TOTAL PHILIPPINES 275 215.542 162.097 91.4976 35.461 43.662 105.312

SPU-OPA-004.F05