Phase-1 overview
Particulars
Fuel Coal
Environment Obtained
Water Obtained
Aviation Obtained
Financial Achieved
Closure
Technology
8
Highlights - Engineering
• Concreting – 97% released
• Concept notes & Technical specifications for all packages have been released.
9
Procurement Progress
10
Highlights – Procurement
• All Major long delivery packages ordered to globally reputed companies &
manufacturing in advance stage.
• Short delivery packages are being ordered under umbrella contract to cut
short procurement cycle.
• Material received from HPE, China : 76%
• 100% material receipt at site is expected by Oct – 10
Highlights – Procurement (Contd…)
12
Construction Progress
13
Major Milestones of the Project during 2010
14
Milestones achieved during 2010
• Cooling water piping erection completed without any hurdle to other erection
activities
15
Highlights – Construction
• Concreting – 81% completed
16
Upcoming Milestones
17
HSE
18
HSE Statistics
20
EPGL Phase – 2 : 1320 MW
21
EPSL : 600 MW
• 4 X 150 MW Sub critical – CFBC Boilers
• Pet coke
22
Plot plan – Phase – 1/2/3
23
Progress Photographs
Phase-1
24
Salaya Administration Building (SAB)
BTG BLOCK
CHIMNEY
BOILER #1 BOILER #2
TG #2
SWITCH YARD TG #1
BOILER #1- SIDEVIEW
5th B –LAYER
5th A –LAYER
4th B -LAYER
4th A -LAYER
3rd B-LAYER
3rd A-LAYER
2ND LAYER
1ST LAYER
BOILER #2- APH
APH #2
APH #1
MAIN CONTROL BUILDING ERECTION
BEARING HOUSING #3
PLACED IN POSITION
LP #2 BOTTOM CASING
PLACED IN POSITION
TG # 1 – CONDENSER ERECTION
HP SIDE CONDENSER TUBE
SHEET ALIGNMENT & ERECTION
IN PROGRESS
TG #1 LP HEATER - 5
TG #1 LP HEATER - 6
TG # 1 – MAIN OILTANK (MOT) ERECTED
AXIS-A12 AXIS-A15
AXIS-B17
AXIS-A13
AXIS-B21
AXIS-A11
AXIS-B18
AXIS-A14
CST #1 CST #2
UNIT # 1 BUNKER ERECTION
UNIT # 1 BUNKER TOP
ESP # 1 ERECTION (SECTION-A, 1376/3526
COLLECTING PLATES ERECTED)
INSULATOR ERECTION ON INNER FRAME IN
PROGRESS
FOUNDATION FOR
INTERMIDIATE FLY ASH SILO
CW PUMP HOUSE SUPER STRUCTURE
ERECTION (PHOTOGRAPH TAKEN DURING RAIN)
MAINTENANCE BAY SUPER STRUCTURE
ERECTION IN PROGRESS
UT- 1A
UT- 1B
SWITCH YARD – OVERVIEW