ESTRUCTURA DE COSTOS N° A59

Proyecto: Piscina Temperada Arq. Nuñez


Cliente: Municipalidad de Uchumayo
Fecha: 6/30/2010
Realizado por: Luis Muñoz Ch.

A.- MATERIALES E INSUMOS

Desperdicio Sub Total


Item Descripcion Unidad Cantidad P.U. (US$)
% (US$)
1.00 Materiales 72177.91 123157.93
1.01 Plancha 3/8" (columnas) kg 37,030.00 0.92 5.00% 35770.98
1.02 Plancha 38 mm (base de Columnas) kg 2899.00 0.92 5.00% 2800.43
1.03 Barra 1 1/2" (anclajes) kg 2122.20 0.92 5.00% 2050.05
1.04 Tuberia SCH 40 Ø 4" kg 8677.00 1.20 5.00% 10933.02 2122.20
1.05 Tuberia SCH 40 Ø 2 1/2" kg 5841.00 1.20 5.00% 7359.66 5841.00
1.06 Tuberia Ø 2" SCH 40 kg 1393.00 1.20 5.00% 1755.18 1393.00
1.07 Tuberia Ø 1 1/2" SCH 40 kg 705.86 1.20 5.00% 889.38 705.86
1.08 Tuberia Ø 2" SCH 40 kg 1392.00 1.20 5.00% 1753.92 1392.00
1.09 Tuberia Ø 1 1/4" SCH 40 kg 1335.00 1.20 5.00% 1682.10 1335.00
1.10 Tubo rectangular 6" x 2" x 3.0 mm (soporte cobertura T kg 6398.00 1.00 5.00% 6717.90 6398.00
1.11 Tubo rectangular 6" x 2" x 3.0 mm (techo en voladizo) kg 1376.00 1.00 5.00% 1444.80 19187.06
1.12 Tubo cuadrado 50 x 100 x3.0 (perimetro pergola kg 354.00 1.00 5.00% 371.70
1.13 Perfil Aluminio 100x40 ml 813.00 3.81 5.00% 3252.41 9970.31
1.14 Cobertura TR6-Curvo m2 1267.00 36.00 0.00% 45612.00
1.11 Cable de acero Ø 3/8" ml 1400.00 0.52 5.00% 764.40
2.00 Insumos
2.01 Soldadura E-7018 kg 1841.85 3.50 6446.48
2.02 Pintura Epoxica glns 64.00 28.00 1792.00
2.03 Pintura Poliuretano glns 64.00 32.00 2048.00
2.04 Solvente glns 36.00 12.00 432.00
2.05 Lijar, Escobillas, otros gbl 200.00 5.00 1000.00
2.05 Pernos y Accesorios gbl 1.00 500.00 500.00
2.06 Oxigeno m3 240.00 4.17 1000.08
2.07 Gas kg 135.00 0.26 34.56
2.08 Discos de Corte glb 100.00 7.00 700.00
2.08 Discos de Desbaste pz 100 3.50 350.00
Total materiales e Insumos $137,461.05

B.- MANO DE OBRA DE FABRICACION

Item Actividad N° Hombres N° Días Horas/Día US$/H-H US$ Parcial


1.00 Armador 6 60 10 3.20 11520.00 3600
2.00 Trazador-Armador 2 60 10 3.20 3840.00 1200
3.00 Oxicortista 2 60 10 3.00 3600.00 1200
3.00 Soldador 3G 4 60 10 4.20 10080.00 2400
4.00 Ayudante 6 60 10 2.20 7920.00 3600
5.00 Pintor 2 60 10 3.21 3852.00 1200
TOTAL HORAS 13200 5.468023621
Total Mano de Obra Fabricación $40,812.00 0.565436142

C.- MANO DE OBRA DE MONTAJE

Item Actividad N° Hombres N° Días Horas/Día US$/H-H US$ Parcial


1.00 Montajista 6 30 10 3.5 6300.00 1800
2.00 Armador 2 30 10 3.8 2280.00 600
3.00 Soldador 3G 2 30 10 4.5 2700.00 600
4.00 Ayudante 5 30 10 2.5 3750.00 1500
5.00 Pintor 2 30 10 3.8 2280.00 600
5100 14.15253173
Total Mano de Obra Fabricación $17,310.00 0.239824062

D.- MAQUINARIA, EQUIPOS Y HERRAMIENTAS

Item Actividad N° Maq N° Días Horas/Día US$/H-Maq US$ Parcial


1.00 Fabricación 9420.00
1.01 Equipo Oxicorte 8 60 10 0.50 2400.00
1.02 Maquina de Soldar 400 A 6 60 10 0.54 1944.00
1.03 Esmeril de Desbaste 8 60 10 0.22 1056.00
1.04 Equipo de Pintado 2 60 10 0.80 960.00
1.05 Herramientas Manuales 6 60 10 0.85 3060.00
2.00 Desmontaje y Montaje 2712.00
2.01 Maquina de Soldar 400 A 4 30 8 0.64 614.40
2.02 Equipo de Oxicorte 2 30 8 0.50 240.00
2.03 Esmeril de Desbaste 8 30 8 0.22 422.40
2.04 Taladro Manual 4 30 8 0.22 211.20
2.05 Herramientas Manuales 6 30 8 0.85 1224.00
0.00
Total Mano de Obra Fabricación $12,132.00

E.- ENERGIA ELECTRICA

Item Actividad Horas Dias % Aplicable US$/H US$ Parcial


1.00 Energia Electrica 10 60 15 3 1800.00

Total Mano de Obra Fabricación $1,800.00

F.- MANO DE OBRA INDIRECTA

Item Actividad N° Hombres N° Días Horas/Día US$/H-H US$ Parcial


Ingeniero Residente 1 90 10 4.5 4050.00
Ingeniero de Seguridad 1 90 10 3.8 3420.00
Asistente 1 90 10 1 900.00
0.00
0.00
0.00
0.00
0.00
Total Mano de Obra Indirecta $8,370.00

G.- INGENIERIA

Item Actividad N° Hombres N° Días Horas/Día US$/H-H US$ Parcial


1.00 Ing. Proyectista 1 5 8 5.00 200.00
2.00 Dibujante CAD 1 10 8 2.50 200.00
0.00
0.00
Total Ingeniería $400.00

H.- SERVICIOS EXTERNOS

Item Actividad Unidad Cantidad $ Unidad $ Parcial Sub-total


1.00 Arenado SSPC-SP6 Comercial m2 724 3.2 2316.80 2,316.80
2.00 Servicio de Corte y Plegado kg 37000 0.2 7400.00 7,400.00
3.00 Servicio de Mecanizado 0.00
Servicio de Rolado 0.00
Total Servicos Externos: $9,716.80
I.- GASTOS DE OBRA

Item Descripción N° Hombres N° Días Horas/Día US$/H-H US$ Parcial


Alimentación Personal 0.00
Alojamiento Personal 0.00
Movilidad del Personal 0.00
0.00
Total Ingeniería $0.00

J.- GASTOS DE TRANSPORTE Y GRUA

Item Descripción Unidad Cantidad $ Unidad $ Parcial Sub-total


Transporte kg 72177.91 0.09 6496.012062 6,496.01
Camion Grua H-Maq 120 40 4800 4,800.00
0.00
0.00
Total Ingeniería $11,296.01

RESUMEN

DESCRIPCION INCIDENCIA
MATERIAL E INSUMOS 137,461.05 97.12% 137,461.05
MANO DE OBRA FABRICACION 40,812.00 40,812.00
MANO DE OBRA MONTAJE 17,310.00 17,310.00
MAQUINARIA EQUIPOS Y HERRAMIENTAS 12,132.00 12,132.00
SERVICIOS EXTERNOS 9,716.80 9,716.80
GASTOS DE OBRA 0.00 0.00
GASTOS DE TRANSPORTE Y GRUA 11,296.01 11,296.01
IMPREVISTOS 3% 0.00 0.00
0.00
COSTO DIRECTO 228727.8627
2.88%
INGENIERIA 400.00
ENERGIA ELECTRICA 1,800.00 1,800.00
MANO DE OBRA INDIRECTA
GASTOS ADMINISTRATIVOS 1% 231015.1413 2,287.28
GASTOS FINANCIEROS 1% 231015.1413 2,287.28
COSTO PRECIO DE PRECIO 3%
DIRECTO DÓLAR SOLES IMPROVISTOS
COSTO INDIRECTO 6,774.56 230,527.86 3.4 783,794.73 807,308.58

COSTO DE OPERACIÓN 235502.4199

UTILIDAD 15% 35325.36299

VALOR DE VENTA 270827.7829

$/kg: 3.752225247
Arequipa, 21 de Junio del 2010.

Proyecto: Estructuras Metalicas Piscina Temperada


REF: ACU Fabricacion de Estructura Metalica

1.0 METRADO DE ESTRUCTURA METALICA


Item Descripción Und Metrado Repet. Total Cantidad

Anclajes
Pl 9,0 x350x300 m2 0.11 2.00 0.21 10.00
Pl 9,0x400x400 m2 0.16 2.00 0.32 10.00
Vigas VM-2
Angulo 1" x 1" x 1/8" ml 4.03 2.00 8.06 136.00
Barra lisa Ø 1/2" ml 3.50 1.00 3.50 136.00
Barra lisa Ø 3/8" ml 0.37 14.00 5.18 136.00
Vigas VM-3
Angulo 1" x 1" x 1/8" ml 4.82 2.00 9.64 17.00
Barra lisa Ø 1/2" ml 4.20 1.00 4.20 17.00
Barra lisa Ø 3/8" ml 0.39 16.00 6.24 17.00
Tensores
Barra lisa Ø 1/2" ml 4.80 15.00 72.00 9.00
Vigas VM-1
Angulo L 2 1/2 "x 2 1/2" x 3/16" ml 48.02 2.00 96.04 10.00
Angulo L 1 1/2 "x 1 1/2" x 1/8" (Motantes) ml 1.20 34.00 40.80 10.00
Angulo L 1 1/2 "x 1 1/2" x 1/8" (Diagonales) ml 1.92 32.00 61.44 10.00
Angulo L 1" x 1" x 1/8" ml 0.96 32.00 30.72 10.00
Pl est. 3/16"x0.125x0.125 m2 0.04 99.00 4.36 10.00
Cruz de San Andres
Barra lisa Ø 3/8" ml 5.00 8.00 40.00 72.00
Pl 1/8" x 0.025 x 0.025 m2 0.00 32.00 0.02 10.00
Detalles de Fijacion
Esparragos Galv. Ø 5/8" ml 0.25 4.00 1.00 20.00

ACU - SUMINISTRO, FABRICACION LIMA

Ítem Descripción Und Metrado C.U. C.Tot.


1.00 Acero kg 12,967.74 1.111 14,407.74
2.00 Desperdicio 8% kg 1,037.42 1.111 1,152.62
3.00 Servicio de corte kg 960.70 0.080 76.86
4.00 Servicio de corte y doblez kg 587.81 0.100 58.78
5.00 Pernos glb 1.00 0.00 0.00
6.00 Servicio de roscado glb 1.00 0.00 0.00
7.00 Arenado SSPC-SP6 m2 803.49 2.760 2,217.64
8.00 Pintura a 8.0 mils + 15% m2 924.02 2.970 2,744.33
9.00 Consumibles pintura m2 803.49 0.200 160.70
10.00 Equipos kg 12,967.74 0.025 324.19
11.00 Consumibles kg 12,967.74 0.030 389.03
12.00 Gases kg 12,967.74 0.045 583.55
13.00 Soldadura 2,5% kg 324.19 3.000 972.58
14.00 Fletes a obra kg 12,967.74 0.050 648.39
15.00 Fletes internos kg 12,967.74 0.020 259.35
16.00 Mano de obra fabricacion vigas laminadas kg 9,394.52 0.200 1,878.90
17.00 Mano de obra fabricacion barandas kg 199.55 2.200 439.01
18.00 Mano de obra fabricacion detalles kg 3,573.22 0.400 1,429.29
19.00 Mano de obra pintura taller m2 1,606.98 0.520 835.63
20.00 Mano de obra pintura obra m2 0.00 0.870 0.00
21.00 Retoques de pintura m2 0.00 0.200 0.00
22.00 Embalaje kg 12,967.74 0.020 259.35
23.00 Mano de obra montaje kg 0.00 0.220 0.00
24.00 Grua Telescopica Dias 0.00 810.000 0.00
25.00 Camion Hiab Dias 4.00 170.000 680.00
26.00 Montacargas Dias 8.00 40.000 320.00
27.00 Ensayos no destructivos kg 12,967.74 0.015 194.52
28.00 Uniformes y EPPS Glb 1.00 200.000 200.00
29.00 Articulos seguridad glb 1.00 200.000 200.00
30.00 Seguros Mes 1.00 400.000 400.00
31.00 Otros Glb 1.00 250.000 250.00

ACU - SUMINISTRO, FABRICACION AREQUIPA

Ítem Descripción Und Metrado C.U. C.Tot.


1.00 Acero kg 12,967.74 1.111 14,407.74
2.00 Desperdicio 7% kg 907.74 1.111 1,008.54
3.00 Servicio de corte kg 960.70 0.100 96.07
4.00 Servicio de corte y doblez kg 587.81 0.100 58.78
5.00 Pernos glb 1.00 0.00 0.00
6.00 Servicio de roscado glb 1.00 0.00 0.00
7.00 Arenado SSPC-SP6 m2 803.49 4.150 3,334.49
8.00 Pintura a 8.0 mils + 15% m2 924.02 2.970 2,744.33
9.00 Consumibles pintura m2 803.49 0.250 200.87
10.00 Equipos kg 12,967.74 0.025 324.19
11.00 Consumibles kg 12,967.74 0.030 389.03
12.00 Gases kg 12,967.74 0.045 583.55
13.00 Soldadura 2,5% kg 324.19 3.000 972.58
14.00 Fletes Lima Arequipa kg 12,967.74 0.090 1,167.10
15.00 Fletes a obra kg 12,967.74 0.050 648.39
16.00 Fletes internos kg 12,967.74 0.030 389.03
17.00 Mano de obra fabricacion vigas laminadas kg 9,394.52 0.200 1,878.90
18.00 Mano de obra fabricacion barandas kg 199.55 2.400 478.92
19.00 Mano de obra fabricacion detalles kg 3,573.22 0.500 1,786.61
20.00 Mano de obra pintura taller m2 1,606.98 0.600 964.19
21.00 Mano de obra pintura obra m2 1,606.98 0.000 0.00
22.00 Retoques de pintura m2 1,606.98 0.000 0.00
23.00 Embalaje kg 12,967.74 0.000 0.00
24.00 Mano de obra montaje kg 0.00 0.000 0.00
25.00 Grua Telescopica Dias 0.00 810.000 0.00
26.00 Camion Hiab Dias 0.00 170.000 0.00
27.00 Montacargas Dias 10.00 40.000 400.00
28.00 Ensayos no destructivos kg 12,967.74 0.000 0.00
29.00 Uniformes y EPPS Glb 1.00 200.000 200.00
30.00 Articulos seguridad glb 1.00 200.000 200.00
31.00 Seguros Mes 1.00 300.000 300.00
32.00 Otros Glb 1.00 250.000 250.00
Total Final A.U. A. Tot. P.U. P. Tot C.U. C. Tot

2.10 2.00 4.20 70.65 148.37 65.00 136.50 0.92


3.20 2.00 6.40 70.65 226.08 65.00 207.99 0.92

1,096.16 0.10 111.37 0.94 1,030.39 1.13 1,236.47 1.20


476.00 0.04 18.99 0.99 471.24 0.99 471.24 1.00
704.48 0.03 20.24 0.57 401.55 0.57 401.55 1.00

163.88 0.05 8.33 0.94 154.05 1.13 184.86 1.20


71.40 0.04 2.85 0.99 70.69 0.99 70.69 1.00
106.08 0.03 3.05 0.57 60.47 0.57 60.47 1.00

648.00 0.04 25.85 0.99 641.52 0.99 641.52 1.00

960.40 0.25 243.94 4.60 4,417.84 5.52 5,301.41 1.20


408.00 0.15 62.18 1.80 734.40 2.16 881.28 1.20
614.40 0.15 93.63 1.80 1,105.92 2.16 1,327.10 1.20
307.20 0.10 31.21 0.94 288.77 1.13 346.52 1.20
43.56 2.00 87.12 35.33 1,538.76 33.21 1,446.43 0.94

2,880.00 0.03 82.73 0.57 1,641.60 0.57 1,641.60 1.00


0.20 2.00 0.40 25.51 5.10 28.06 5.61 1.10

20.00 0.05 1.00 1.55 31.00 2.33 46.50 1.50

803.49 12,967.74 14,407.74 1.111


13,875.48
374.45

1,183.45

1,840.32
1,473.21
8,085.69

2,103.62