Congratulations on your choice.
RIVA COMPACT HE are condensing high efficiency sealed chamber fan flue gas boilers.
They are fully electronically controlled and have electronic ignition.
The materials they are made of and the control systems they are equipped with give you safety,
a high level of comfort and energy savings to allow you to get the greatest benefit out of
independent heating.
RIVA COMPACT HE allow a higher efficiency by reducing the flue gas temperature such that
the water vapour formed during the combustion is condensed out.
This allows a gain of useful heat that otherwise would be lost.
Appliance category II2H3+ Gas G20 20 mbar, G30 29 mbar, G31 37 mbar
Country of destination: United Kingdom (GB) Ireland (IE)
This appliance conforms with the EEC directive 90/396 and, consequently, it has the right to make use
of the brand name
Moreover, the appliance conforms with the EEC directive 87/308 relative to the prevention and elimina-
tion of radio disturbances.
The appliance is built to comply with the regulation now in force regarding gas appliance’s safety and
the European regulation now in force relative to safety of household and similar electrical appliances.
The manufacturer, in the continuous pocess to improve his products, reserves the right to modify the
data expressed in the present documentation at any time and without prior notice.
The present documentation is an informative support and it cannot be considered as a contract to-
wards third parties.
Boiler installation and commissioning tips
n The installation must be carried out by n It is also sensible to initially fire and com-
a qualified person who will be responsible for mission the boiler before connecting any ex-
observing the current Regulations. ternal controls such as a room thermostat. By
this method if you have a subsequent prob-
Installing the boiler... lem following the addition of an external con-
trol you can eliminate the boiler from your
n Do not forget to remove the transit caps fault analysis.
and plugs from the boiler connections these n Do not forget to range rate the boiler to
are fitted to every boiler.
suit the system requirements. This pro-
n Keep the boiler clear of dust during in- cedure is covered in the commissioning sec-
stallation and in particular do not allow any tion of the installation manual.
dust or debris to enter the top of the boiler n If the boiler is fitted with a digital pro-
where the flue connection is made. It is rec-
grammer, when setting the times for auto-
ommended that you put a dust sheet over the
matic operation, remember that for every
top of the boiler until you are ready to make “ON” time there must be an “OFF” time to fol-
the flue connection.
low and that on every occasion you enter a
n Because every boiler is fired and tested time you must also indicate which days that
live at the factory, a small amount of water re- you want the boiler to follow the timed set-
mains within the boiler. It is possible for this tings.
water to initially cause the pump to seize. It is n Some products incorporate an anti cycl-
therefore recommended that the pump rotor
ing time delay. It is normal when first switch-
be manually turned to free its rotation before
ing the boiler on for the boiler to operate on
turning the boiler on. heating for a few seconds then switch off.
n Remember to release the auto air purge After 3 --- 4 minutes has elapsed the boiler will
before filling the boiler. See the instructions to then re ignite and operate perfectly normally.
identify the location of this device. The ignition delay cycle does not prevent
normal operation of the boiler to provide
n Do not remove the cap of the pressure d.h.w.
test points of the air switch (top left side of the
boiler). n If you are in any doubts as to the installa-
tion or operation of the boiler please read the
n You are strongly advised to flush out the instruction manuals thoroughly and then if
system both cold and hot in order to remove necessary contact Biasi UK for advice and
system and installation debris. assistance.
Please remember that if you are in any doubt about the installation of this product you can contact our
Technical Helpline on tel. 0121 506 1350
TABLE OF CONTENTS
USE
2.2 Refilling procedure . . . . . . . . . . . . . . 4
1.2 Control panel . . . . . . . . . . . . . . . . . . 2 2.3 Ignition . . . . . . . . . . . . . . . . . . . . . . . . 5
1.3 Isolation valves . . . . . . . . . . . . . . . . . 2 2.4 C.h. circuit temperature . . . . . . . . . . 5
2.5 D.h.w. temperature . . . . . . . . . . . . . . 6
1.4 Technical data . . . . . . . . . . . . . . . . . 2 2.6 Extinguishing . . . . . . . . . . . . . . . . . . 7
1.5 Operation lights . . . . . . . . . . . . . . . . 3 2.7 Built in time switch . . . . . . . . . . . . . . 7
INSTALLATION
3.2 Frost protection . . . . . . . . . . . . . . . . 10 6.2 Precautions for installation . . . . . . . 25
3.3 Condensate drain . . . . . . . . . . . . . . 10 6.3 Installing the bracket . . . . . . . . . . . . 25
3.4 Periodic maintenance . . . . . . . . . . . 10 6.4 Overall dimensions . . . . . . . . . . . . . 26
3.5 External cleaning . . . . . . . . . . . . . . . 10 6.5 Joints . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.6 Operational faults . . . . . . . . . . . . . . . 10 6.6 Mounting the boiler . . . . . . . . . . . . . 26
4 Technical information . . . . . . . . . . 12 6.7 Fitting the flue system . . . . . . . . . . . 27
4.1 Overview . . . . . . . . . . . . . . . . . . . . . . 12 6.8 Choice of flue . . . . . . . . . . . . . . . . . . 27
4.2 Main diagram . . . . . . . . . . . . . . . . . . 13 6.9 Electrical connections . . . . . . . . . . . 29
4.3 Hydraulic specifications . . . . . . . . . 14 6.10 External frost protection . . . . . . . . . 30
4.4 Expansion vessel . . . . . . . . . . . . . . . 14 7 Commissioning . . . . . . . . . . . . . . . 32
4.5 Technical data mod. M96.24SM/... . 15 7.1 Electrical installation . . . . . . . . . . . . 32
4.6 Technical data mod. M96.28SM/... . 17 7.2 Gas supply installation . . . . . . . . . . 32
4.7 Technical data mod. M96.32SM/... . 19 7.3 Filling the d.h.w. system . . . . . . . . . 32
5 General requirements . . . . . . . . . . 21 7.4 Initial filling of the system . . . . . . . . 32
5.1 Related documents . . . . . . . . . . . . . 21 7.5 Condensate pipe and traps . . . . . . 33
5.2 Location of appliance . . . . . . . . . . . 21 7.6 Lighting the boiler . . . . . . . . . . . . . . 33
5.3 Flue system . . . . . . . . . . . . . . . . . . . . 21 7.7 Checking gas pressure at the burner 33
5.4 Gas supply . . . . . . . . . . . . . . . . . . . . 22 7.8 Checking the burner ignition . . . . . 34
5.5 Air supply . . . . . . . . . . . . . . . . . . . . . 22 7.9 Adjustment of useful c.h. output . . 35
5.6 Ventilation . . . . . . . . . . . . . . . . . . . . . 22 7.10 Checking the ignition device . . . . . 37
5.7 Condensate drain . . . . . . . . . . . . . . 22 7.11 Checking the flue system . . . . . . . . 37
5.8 Water circulation (c.h.) . . . . . . . . . . . 23 7.12 Checking condensate drain pipe . . 37
5.9 Domestic water . . . . . . . . . . . . . . . . . 24 7.13 Instructing the user . . . . . . . . . . . . . 37
5.10 Water treatment . . . . . . . . . . . . . . . . 24
5.11 Electrical supply . . . . . . . . . . . . . . . . 24
16
15
14
13
2 11
12
3
Fig. 1.2 (bottom view of the boiler)
Fig. 1.1
11 Condensate drain pipe
1 Case front panel
12 C.h. return valve
2 Control panel
13 D.c.w. inlet valve
3 Control panel cover
14 Gas inlet valve
15 D.h.w. outlet pipe
1.2 Control panel
16 C.h. flow valve
4 C.h. circuit temperature and pressure gauge
5 Time switch (c.h. control) 1.4 Technical data
6 Lock--- out signal lamp
For detailed technical data see section 4.5 or 4.6
7 Lockout reset button of this manual.
8 Function selector and c.h. temp. control knob
9 D.h.w. temperature control knob
10 Appliance operation lights
10 9 8 7 6 5 4
Fig. 1.3
2
Appliance description
USE
each of the possible light combinations and their
meaning. Flashing lamp, alone or simultaneously
with an other lamp.
Flashing lamp, alternate with another
A short pulse every 4 lamp.
seconds:
stand--- by condition
Function selector in
position.
Anti--- freeze system active
1 second pulse every 2
seconds: normally
operating boiler. Function
selector in or
position
C.h. operation
D.h.w. operation
3
2 INSTRUCTIONS FOR USE
2.1 Warnings 2.2 Refilling procedure
Biasi UK Ltd support the Benchmark initiat- 1 Isolate the boiler from the electrical supply at
ive. The Benchmark Log Book is located at the fused spur. Reconnect the filling loop as
the back of this manual and should be com- demonstrated in Fig. 2.1.
USE
4
Instructions for use
2.3 Ignition
1 Check that the valves located in the lower part
of the boiler are open (Fig. 2.3).
USE
10 8
Fig. 2.5
Fig. 2.4
4 If d.h.w. supply only is required, position the
function selector 8 as in Fig. 2.5.
The appliance operation light 10 will flash
every 2 seconds (operating boiler).
5
Instructions for use
Minimum
USE
Minimum 9
Maximum
Maximum
Fig. 2.8
Fig. 2.6 Adjustment of the d.h.w. temperature is complete-
ly separate from that of the c.h. circuit.
Adjustment
The adjustment system integrated within the
In order to achieve optimal settings for economy boiler automatically controls the flow of gas to the
and comfort, we recommend adjusting the oper-
burner in order to keep the temperature of d.h.w.
ating temperature of the c.h. water according to
delivered constant, between the limits of maxi-
the outside temperature, positioning the knob as
mum and minimum output.
follows:
Where the demand is at a low level or with the tem-
From 5 to 15 ˚C
perature set to the minimum, it is normal to see a
Between cycle of lighting and extinguishing of the burner
--- 5 and +5 ˚C when running.
Adjustment
It is advisable to adjust the d.h.w. temperature to
Lower than a level commensurate with the demand, minimis-
--- 5 ˚C ing the need to mix with cold water. In this way, the
automatic control facilities will be fully exploited.
Fig. 2.7
Moreover, where the amount of limescale present
Your qualified installer will be able to recommend in the water may be particularly great, not exceed-
the most suitable adjustment for your system. ing the position in Fig. 2.9 of the d.h.w. tempera-
The temperature and pressure gauge (4, Fig. 1.3 ture control knob 9 corresponding to about 50°C
on page 2) will allow you to check that the set tem- (Fig. 2.9), minimises annoying incidences of scale
perature is obtained. deposits and clogging.
6
Instructions for use
USE
9
Fig. 2.9
In these cases, however, it is advisable to install a
small water treatment device or softener. With
such a device you should avoid periodic descal- 14
ing. Closed position
Consequently, the d.h.w. heat exchanger will keep Fig. 2.11
its performance consistent for a longer period of
time with resulting gas savings.
If the demand for d.h.w. is so great as to prevent 2.7 Built in time switch
reaching a high enough temperature, have the ap-
propriate output limiting valve installed by your in- The boilers are equipped with a built in electronic
staller or an Authorised Service Engineer. time switch (5, Fig. 1.3 on page 2) which controls
the c.h. operation.
2.6 Extinguishing
G H
To turn the boiler off set the function selector 8 to
the position shown in Fig. 2.10.
The appliance operation light 10 will flash every 4
seconds.
A
10 8
F E D C B
Fig. 2.10 Fig. 2.12
When you do not expect to use the boiler for a long
period: Display and control panel
1 Switch off the electricity supply to the boiler, by A Mode selector switch
means of the fused spur isolation switch; B Reset button
2 Shut off the gas supply cock 14 and the valves C Enter button
for the water circuits fitted under the boiler D Increase “+” setting button
(Fig. 2.11).
E Decrease “ --- ” setting button
3 Empty the water circuits, if necessary, as
F On--- off button
shown in section General access and emptying
hydraulic circuits in the service manual. G Time display
7
Instructions for use
H ON --- OFF display
A A
Fig. 2.13
Fig. 2.16
Setting the switching time
Note: when the mode selector switch A is in the
20 memory locations are available, corresponding AUTO position and the boiler is switched off at the
to 10 on--- off sequences. fused spur isolation switch, the display H indicates
Set the mode selector switch A to the C1 position. only the OFF state. The other indications are
The symbols shown in Fig. 2.14 appears in the blanked.
display.
Reading the timed settings
A Set the mode selector switch A to the C1 position.
The symbols shown in Fig. 2.14 appears in the
display.
Press the “enter” button C. Each time the button
is pressed the display shows the details of the next
setting.
Fig. 2.14 Changing or deleting the timed settings
Press the buttons D or E to set the desired ON Set the mode selector switch A to the C1 position.
time. The symbols shown in Fig. 2.14 appears in the
Press the “enter” button C to confirm the setting display.
and to continue programming the OFF time. Press the “enter” button C until the display shows
Set the OFF time as explained above for the ON the setting to be modified or deleted.
setting and confirm by pressing the “enter” button The time setting can be modified now by pressing
C. Proceed in the same way for other settings. button D or E and the operation can be switched
Setting example shown in Fig. 2.15: on or off by pressing the button F.
A --- ON time 7.45.
B --- OFF time 10.30.
8
Instructions for use
To delete a time set press the button D or E until the The time delay can be set within the following
symbols shown in Fig. 2.14 appears in the time ranges:
display G. 1 to 23 hours with steps of 1 hour
The new settings are memorized by moving the 1 to 27 days with steps of 1 day
switch A to a different position. The time delay setting is activated by moving the
USE
switch A to the AUTO position.
Manual operation
The ON--- OFF display H flashes indicating that the
The operation of the time switch can be forced on current state of operation has been forced.
or off constantly or for a timed period.
To delete the timed delay setting, set the mode se-
To force constantly on or off the timer operation lector switch A in the TIMER position, press the
set the mode selector switch A to the TIMER posi- button D or E until the symbols shown in Fig. 2.17
tion. The symbols shown in Fig. 2.17 appears on appears in the display and then set the mode se-
the display. lector switch A to the AUTO position
Setting example shown in Fig. 2.18:
forced ON state for 4 hours.
Fig. 2.17
The operation can be switched permanently on or
off by pressing the button F and leaving the switch Fig. 2.18
A in the TIMER position.
To force a timed delay on or off operation, set the Resetting
mode selector switch A in the TIMER position. To completely reset the timer, press the reset but-
Set the time delay by pressing the button D or E ton with a pointed object (pencil).
and the operation can be forced on or off by pres- CAUTION: pushing the reset button will complete-
sing the button F. ly erase the settings as well as all the data, includ-
ing the current time.
9
3 USEFUL ADVICE
3.1 Central heating cleaning by an Authorised Service Centre En-
gineer, at least once a year.
For reasonably economical service install a room
thermostat. During the service, the most important compo-
nents of the boiler will be inspected and cleaned.
Never shut off the radiator in the area where the This service can be part of a maintenance con-
USE
10
Useful advice
Safety lock--- out may occour even in case of an If in time, a reduction in domestic hot water
blockage of the condensate drainage (e.g. supply is observed...
plugged drain pipe). The likely causes may be impurities caught in the
It is advisable to check the condensate drainage domestic hot water flow switch filter or limescale
pipe and traps for cleaness. deposited in the domestic hot water heat ex-
USE
In case of persistent lock--- out call a competent changer. It is advisable to have the appliance
and responsible service engineer. cleaned out by an Authorised Service Centre En-
gineer.
If noises due to air bubbles are heard during
operation... If water should occasionally leak from the
boiler...
you should check that the pressure on the tem-
perature and pressure gauge (Fig. 2.2 on page 4) shut off the valves positioned under the boiler
is not below the correct setting. (Fig. 2.11 on page 7) and call an Authorised Ser-
If required, top up the system correctly, as de- vice Centre Engineer.
scribed in the section 2.2 of this manual.
If the left appliance operation light 10 (Fig. 3.3)
Bleed any air present in the radiators, if necessary.
flashes very quickly the boiler is detecting a
If the pressure on the temperature and pres- fault.
sure gauge (4 on page 2) has gone down...
10
it is necessary to top up the appliance with water
again, so as to raise the pressure to an adequate
level as described in the section 2.2 of this manual.
If topping up with water has to be done very fre-
quently, have the system checked for leaks.
11
4 TECHNICAL INFORMATION
4.1 Overview 15 D.h.w. outlet pipe
32 33 34 35 36 37 16 C.h. flow valve
17 Condensate trap
18 Main circuit drain valve
19 Automatic air purger valve
20 Pump
21 Pump vent plug
22 Modulation gas valve
23 D.h.w. temperature probe NTC
INSTALLATION
12
Technical information
INSTALLATION
35
46
32
31
37
43
27
29 19
28 20
41 44
17 25 48
47
22 24
26
40 38
42 39
11
45 23
18
14 12 16 13 15
Fig. 4.2
13
Technical information
4.3 Hydraulic specifications The height difference between the pressure relief
valve and the highest point in the system may be
kPa bar 7m at most.
60 0.6
For greater differences, increase the pre--- load
50 0.5 pressure in the expansion vessel (44 on page 12)
and the system, when cold, by 0.1 bar for each
40 0.4 additional 1m.
30 0.3
For 24 Kw and 28 Kw
20 0.2
Capacity l 6,0
INSTALLATION
10 0.1
Pre--- load pressure kPa 100
0 0.0
bar 1,0
0 200 400 600 800 1000 1200 1400
Maximum volume of water l 132
l/h in the system *
14
Technical information
INSTALLATION
(in 1000 l/h) bar 0,25
Maximum kW 24,6
BTU/h 83 973
Seasonal efficiency band B
G20 (B) % 87,7
Minimum kW 10,2
BTU/h 34 936 Seasonal efficiency band B
G30 G31 (B) % 87,0
Maximum condensing kW 26,6
BTU/h 90 754
Minimum condensing kW 11,1 Domestic hot water
BTU/h 37 871 Maximum temperature ˚C 55
Minimum temperature ˚C 35
Useful output G30 G31
Maximum pressure kPa 1 000
Maximum kW 23,7 bar 10
BTU/h 80 894
Minimum pressure kPa 30
Minimum kW 10,2 bar 0,3
BTU/h 34 936
Flow rate
Maximum condensing kW 26,6
minimum l/min 2,5
BTU/h 90 754
Minimum condensing kW 10,8 30˚ rise (C) l/min 12,1
BTU/h 36 997 35˚ rise (C) l/min 10,1
40˚ rise (C) l/min 8,7
15
Technical information
Injectors
Other specifications
Natural G20 130
Height mm 803
Butane G30 75
Width mm 400
Propane G31 75
Depth mm 350
Weight (dry) kg 42,5
Electrical Data
Water volume in the boiler l (kg) 2,1
Voltage V~ 230 (up to 1 bar)
Frequency Hz 50
Power consumption W 140
Protection degree IPX4D
External fuse rating A 3
Internal fuse rating A F1--- F2 3,15 AF
(D) Values refer to tests with a 1 m chimney working at the nominal heat input
16
Technical information
INSTALLATION
(in 1000 l/h) bar 0,25
Maximum kW 28,3
BTU/h 96 488
Seasonal efficiency band B
G20 (B) % 87,6
Minimum kW 12,1
BTU/h 41 284 Seasonal efficiency band B
G30 G31 (B) % 87,1
Maximum condensing kW 30,7
BTU/h 104 602
Minimum condensing kW 13,2 Domestic hot water
BTU/h 44 965 Maximum temperature ˚C 55
Minimum temperature ˚C 35
Useful output G30 G31
Maximum pressure kPa 1 000
Maximum kW 27,4 bar 10
BTU/h 93 599
Minimum pressure kPa 30
Minimum kW 12,1 bar 0,3
BTU/h 41 284
Flow rate
Maximum condensing kW 30,7
minimum l/min 2,5
BTU/h 104 602
Minimum condensing kW 12,9 30˚ rise (C) l/min 14,0
BTU/h 44 016 35˚ rise (C) l/min 11,7
40˚ rise (C) l/min 10,1
17
Technical information
Injectors
Other specifications
Natural G20 130
Height mm 803
Butane G30 75
Width mm 400
Propane G31 75
Depth mm 350
Weight (dry) kg 44,5
Electrical Data
Water volume in the boiler l (kg) 2,2
Voltage V~ 230 (up to 1 bar)
Frequency Hz 50
Power consumption W 150
Protection degree IPX4D
External fuse rating A 3
Internal fuse rating A F1--- F2 3,15 AF
(D) Values refer to tests with a 1 m chimney working at the nominal heat input
18
Technical information
INSTALLATION
(in 1000 l/h) bar 0,25
Maximum kW 32,2
BTU/h 109 870
Seasonal efficiency band B
G20 (B) % 86,8
Minimum kW 15,0
BTU/h 51 182 Seasonal efficiency band B
G30 G31 (B) % 88,8
Maximum condensing kW 34,4
BTU/h 117 377
Minimum condensing kW 15,6 Domestic hot water
BTU/h 53 229 Maximum temperature ˚C 55
Minimum temperature ˚C 35
Useful output G30 G31
Maximum pressure kPa 1 000
Maximum kW 32,2 bar 10
BTU/h 109 870
Minimum pressure kPa 30
Minimum kW 15,0 bar 0,3
BTU/h 51 182
Flow rate
Maximum condensing kW 34,4
minimum l/min 2,5
BTU/h 117 377
Minimum condensing kW 15,6 30˚ rise (C) l/min 15,3
BTU/h 53 229 35˚ rise (C) l/min 13,1
40˚ rise (C) l/min 11,5
19
Technical information
Injectors
Other specifications
Natural G20 130
Height mm 803
Butane G30 80
Width mm 400
Propane G31 80
Depth mm 350
Weight (dry) kg 50,0
Electrical Data
Water volume in the boiler l (kg) 2,2
Voltage V~ 230 (up to 1 bar)
Frequency Hz 50
Power consumption W 150
Protection degree IPX4D
External fuse rating A 3
Internal fuse rating A F1--- F2 3,15 AF
(D) Values refer to tests with a 1 m chimney working at the nominal heat input
20
5 GENERAL REQUIREMENTS
Biasi UK Ltd support the Benchmark initiative. For Ireland (IE), reference should be made to the
The Benchmark Log Book is located at the back current edition of I.S.813.2002 and the current
of this manual and should be completed by the ETCI rules for electrical installations.
Installing/Commisssioning Engineer and
handed over to the User for future reference by
other visiting Engineers. Also included is the Where a room ---sealed appliance is installed in
Service Interval Record card that should be a room containing a bath or shower, any electri-
completed by the Service Engineer following cal switch or appliance control, utilising mains
the annual service maintenance of the boiler electricity should be so situated that it cannot
and system. be touched by a person using the bath or
shower.
For Ireland (IE), it is necessary to complete a
The location must permit the provision of an ad-
INSTALLATION
“Declaration of Conformity” to indicate com-
equate flue and termination.
pliance to I.S.813.2002.
For unusual locations special procedures may be
This appliance must be installed by a compet- necessary and BS 6798 gives detailed guidance
ent person in accordance with the Gas Safety on this aspect.
(installation & Use) Regulations. A compartment used to enclose the appliance
must be designed specifically for this purpose.
5.1 Related documents This appliance is not suitable for external installa-
tion.
The installation of this appliance must be in ac-
cordance with the relevant requirements of the
current Gas Safety (Installation & Use) Regula-
tions, the Local Building Regulations, the current 5.3 Flue system
I.E.E. Wiring Regulations, the Regulations and
by--- laws of the local water undertaking, and in The provision for satisfactory flue termination must
Scotland, in accordance with the Building Stan- be made as described in BS 5440 part 1.
dards (Scotland) Regulation. Health and safety For Ireland (IE), refer to I.S.813.2002.
document n˚ 635 ”Electricity at work regs.”.
The appliance must be installed so that the flue ter-
It should also be in accordance with the British minal is exposed to external air.
Standard Codes of Practice:
It must not be installed so that the terminal dis-
In Ireland (IE). The installation must be carried out charges into an other room or space as an out-
by a Competent Person and installed in accord- house or lean--- to. It is important that the position
ance with the current edition of I.S.813.2002 “Do- of the terminal allows a free passage of air across
mestic Gas Installations” the current Building at all times.
Regulations and reference should be made to the
The terminal should be located with due regard for
current ETCI rules for electrical installations.
the damage or discoloration that might occur to
building products in the vicinity.
5.2 Location of appliance In cold and/or humid weather water vapour may
The appliance may be installed in any room or in- condense on leaving the flue terminal; the effect of
ternal space, although particular attention is such ”steaming” must be considered.
drawn to the requirements of the current I.E.E. Wir- Pluming may easily occur at the terminal. Where
ing Regulations, and in Scotland, the electrical possible, terminal position which could cause a
provisions of the Building Regulations applicable nuisance should be avoided.
in Scotland, with respect to the installation of the
combined appliance in a room containing a bath
or shower.
21
rev. 17.09.93
General requirements
The minimum acceptable spacing from the ter- available both to the boiler and the other
minal to obstructions and ventilation openings are appliance when they are in use at the same time.
specified in Fig. 5.1. Pipework must be of adequate size. Pipes of a
smaller size than the boiler inlet connection should
not be used.
Installation pipes should be fitted in accordance
with BS 6891 and the complete installation should
be tested for tightness.
O
BC H For Ireland (IE), refer to I.S.813.2002.
G E
P I
JK 5.5 Air supply
INSTALLATION
L
F
D A The room in which the boiler is installed does not
Q
require a purpose provided air vent.
N M
I 5.6 Ventilation
Fig. 5.1 If installed in a cupboard or compartment, it is not
Terminal position mm necessary to provide additional ventilation for
cooling for this particular product. However con-
A. Directly below a window or other opening . . . 300 sideration must be given to clearance require-
B. Below gutters, soil pipes or drain pipes . . . . . 75 ments for maintenance (see section 6.2) and
C. Below eaves . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 under no circumstances must stored articles be al-
D. Below balconies* . . . . . . . . . . . . . . . . . . . . . . . . 600
E. Below car port roof . . . . . . . . . . . . . . . . . . . . . . . NO
lowed to come into contact with the boiler or flue
F . From vertical drain pipes and soil pipes . . . . 150 pipe.
G. From internal corners** . . . . . . . . . . . . . . . . . . 450
H. From external corners . . . . . . . . . . . . . . . . . . . 300
I.. Above ground or balcony level . . . . . . . . . . . . 300 5.7 Condensate drain
J . From a surface facing a terminal . . . . . . . . . . . 600 Ensure that the condensate discharge complies
K. From a terminal facing a terminal . . . . . . . . . 1 200
L . From an opening in the car port with the national or local regulations in force.
(e.g. door, window) into dwelling . . . . . . . . . . . NO The condensate pipe must be fitted in accordance
M Vertically from a terminal in the same wall . 1 500 with Building Regulations.
N. Horizontally from a terminal in the same wall . 300
O. Above the roof pitch with roof slope less Drainpipe material should be resistant to acid as
than or equal to 30˚ . . . . . . . . . . . . . . . . . . . . . . 350 the condensate is slightly acid with a pH less than
Above the roof pitch with roof slope 6.5.
more than 30˚ . . . . . . . . . . . . . . . . . . . . . . . . . . . 600
P. From wall face . . . . . . . . . . . . . . . . . . . . . . . . . . 600 The boiler includes a trap (17 on page 12) that pre-
Q. From, above or to side of an opening . . . . . . . 300 vents the combustion products entering the drain,
however an additional trap with a seal of at least 75
*Wherever practicable to do so, the flue should be ex- mm and an air break between the traps is required
tended beyond the perimeter of the balcony (Fig. 5.2).
** Consideration should be given to adding protection
against condensate to the adjacent structure The length of the condensate pipe should be kept
at minimum.
5.4 Gas supply To avoid condensate being trapped:
--- the drainpipe should be run with a fall of at least
The Gas meter is connected to the service pipe by 2.5˚ (45 mm/m) away from the boiler;
the local gas region or a local gas region contrac-
tor. --- the number of bends and joints should be kept
at minimum;
If the gas supply for the boiler serves other
appliances ensure that an adequate supply is
22
rev. 17.09.93
General requirements
--- the drainpipe should be adequately fixed to The by --- pass is calibrated to assure a minimum
pevent pipe sagging. flow of 500--- 600 lts/hr through the main heat ex-
If a part of the drainpipe runs externally this part changer.
should be kept as short as possible and protected If you are installing a system that includes thermo-
to reduce the risk of freezing. static radiator valves (TRV) and/or small bore
(8--- 10 mm) it may be necessary to fit an external
by--- pass to facilitate correct operation of the
boiler.
Condensate drain
Air release points
These must be fitted at all high points where air will
natural collect and must be sited to facilitate com-
INSTALLATION
plete filling of the system.
Expansion vessel
Fig. 5.2 The appliance has an integral sealed expansion
vessel to accommodate the increase of water vol-
ume when the system is heated.
5.8 Water circulation (c.h.) Refer to Tab. 4.1 on page 14 for its technical data.
Detailed recommendations are given in BS 6798 If the heating circuit has an unusually high water
and BS 5449; the following notes are given for content, calculate the total expansion and add an
general guidance. additional sealed expansion vessel with adequate
For Ireland (IE), refer to I.S.813.2002. capacity.
23
rev. 17.09.93
General requirements
and it must comply with local water authority regu- Where a new boiler is fitted to an existing system,
lations. it is important the debris from the existing system
The correct method is shown in Fig. 5.3. is fully removed in order to ensure the efficiency of
the new appliance is maintained.
The temporary connection must be removed Details on flushing procedure are given in the sec-
immediately after filling. tion 7.4 of this manual.
24
rev. 17.09.93
6 INSTALLATION
6.1 Warnings 200
The use of gas appliances is subject to
statutory control; it is essential to observe 25 50
the current regulations and laws in force
(see also chapter 5).
The appliance must discharge combustion
products directly outside or into a suitable ex-
haust duct designed for this purpose.
Combustion products must be discharged 200
using original flue kits only, since they are inte-
Fig. 6.1 (all dimensions in mm)
INSTALLATION
gral parts of the boiler.
For LPG, the appliance must also conform with --- When installing the boiler in a cupboard, cover
the requirements of the distributors and com- or alcove allow at least 50mm permanent clear-
ply with current Regulations and laws in force. ance from the front face of the boiler. Also en-
The safety relief valve and the condensate sure sufficient clearance to allow free access
drain must be connected to a suitable drain, or for servicing and the lowering of the front con-
discharge in a safe manner. trol panel.
--- If the boiler is installed outside, cover the ap-
The electrical wiring must conform with current
pliance to protect it against the elements and
Regulations, in particular:
add some special anti--- freeze (neutralised) to
--- the boiler must be earthed using the correct the c.h. system.
bonding clamp. --- Before installing the boiler on an existing c.h.
--- Adjacent to the boiler a fused spur isolation system, flush it out thoroughly before fitting the
switch must be installed which permits a boiler, so as to remove muddy deposits.
complete switching off in the conditions of --- It is advisable to equip the system with a sedi-
the overvoltage category III. Refer to sec- ment filter, or use a water--- treatment product in
tion 6.9 in this chapter for the electrical con- the circulating water.
nections. The latter option in particular, not only cleans
In no circumstances will the manufacturer out the system, but also has an anti--- corrosive
be held responsible if the warnings and in- effect by promoting formation of a protective
structions contained in this manual have not skin on metal surfaces and neutralising gases
been complied with. present in the water.
We recommend the use of a suitable universal
inhibitory to protect the c.h. system from cor-
6.2 Precautions for installation rosion.
For the installation proceed as follows:
--- The boiler must be fixed to a strong wall. 6.3 Installing the bracket
--- The dimensions for the exhaust fume duct de- Precautions
tailed in section 6.7 and the correct procedures Before mounting the bracket, check that the di-
for installing the duct, depicted in the instruc- mensions for fitting the exhaust fume duct are
tion leaflet included with the flue kit, must be complied with (refer to the leaflet included with the
complied with during installation. flue kit, packed separately).
--- To allow maintenance procedures it is necess-
Utilise the paper template supplied with the boiler
ary to leave the minimum gaps indicated in
to determine the fixing position for the bracket and
Fig. 6.1.
boiler. Securely mount the bracket to the wall
using appropriate fixings suitable for the type of
wall construction and capable of supporting the
total (wet) load. Refer to the weight given in the
technical data tables specific for each model.
25
Installation
D.h.w. outlet ø 15
196
47 73 200
Pressure relief valve ø 15
400
Condensate drain ø 25 (plastic)
31
50 115 142
35 16
6.6 Mounting the boiler
1 Take the protective caps off the boiler pipe-
work.
803
700
Boiler front
water
inlet C.h. utilising the ½” cold water inlet valve E, the ø 15
Gas return
60
E
A
Fig. 6.3
8 Connect the pipe H (Fig. 6.4) from the pres-
sure relief valve to the safety discharge pipe-
work.
9 Fit the condensate drain 11 (Fig. 6.4) in the air
brake connected to the drainage pipework.
See also section 5.7 in this manual.
26
Installation
Fig. 6.5
INSTALLATION
6.8 Choice of flue
The following flue kits are available for connecting
to the boiler:
27
Installation
Co--- axial 60/100mm.
Elbow kits enable the standard flue kits to be offset
to overcome obstructions or ensure the correct
clearances for the flue terminal. Each elbow used
in addition to the standard flanged elbow reduces
90˚=--- 1,65 m
the overall acceptable length of the flue system as
follows:
45˚ reduce length by 0,5 m.
90˚ reduce length by 1 m.
B Min = 0,3 m 45˚=--- 0,90 m
Max = 2,7 m
Fig. 6.7
INSTALLATION
ø 60/100
90˚=--- 1 m Restrictor
45˚=--- 0,5 m Gasket
C
Fig. 6.6
28
Installation
For M96.32SM/...
Equivalent length Restrictor
(air duct + flue duct)
Between 1 and 24 m ø 50 mm
Tab. 6.2
INSTALLATION
sion pieces (Co--- axial) are also available which al-
lows the flue system to be extended to a total
overall maximum permissible length.
Optional 45˚ and 90˚ elbows can be used to offset
the flue route.
Each additional elbow reduces the overall accept- K J
able length of the flue system as follows:
45˚ reduce length by 0,5 m. Fig. 6.10
90˚ reduce length by 1 m. 4 Remove the side panels or move the lower part
of the side panels as indicated in Fig. 6.11 and
pull the control panel.
90˚=--- 1 m When completely pulled out, the panel can ro-
tate 45˚ downwards to facilitate the operations
on the internal parts.
max =8,5 m
Only for M96.32SM/...
max = 6 m
45˚=--- 0,5 m
Fig. 6.9
Fig. 6.11
6.9 Electrical connections 5 Loosen the screws L and remove the service
panel (Fig. 6.12).
Connection to the electricity supply
1 Remove the front panel of the case (see the
section 9.2 in this manual).
2 Remove the screws I and J (Fig. 6.10).
3 Loosen the screws K.
29
Installation
8 Connect the room thermostat between ter-
minals 1 and 3 as shown in Fig. 6.14.
L Do not connect live wires to terminals to
which the room thermostat must be con-
nected.
Room thermostat Power supply
terminal block
L N
T
INSTALLATION
Power supply
terminal block
Fig. 6.15
30
Installation
Frost thermostat Room thermostat
L N
T T
Power supply
terminal block
2 1External controls
3 terminal block
INSTALLATION
Fig. 6.16
31
7 COMMISSIONING
WARNING
The commissioning of this boiler and system
must only be undertaken by a professionally
qualified person in accordance with the re-
quirements of the Gas Safety Installation and
Use Regulations and be approved by
C.O.R.G.I.
Fig. 7.2
5 Open each radiator air vent starting at the
lowest point of the system and close it only
when clear water, free of bubbles, flows out.
32
Commissioning
6 Purge the air from the pump by unscrewing the 7.6 Lighting the boiler
pump plug 21 (Fig. 7.2); release the pump
shaft by turning in the direction indicated by Some products incorporate an anti cycling time
the arrow on the information plate. delay. It is normal when first switching the boiler on
for the boiler to operate on heating for a few sec-
7 Replace the pump plug. onds then switch off. After 3--- 4 minutes has
8 Continue filling the system. The actual reading elapsed the boiler will then re ignite and operate
should ideally be 1,3 bar and not less than 0,3 perfectly normally. The ignition delay cycle does
bar. not prevent normal operation of the boiler to pro-
9 Close all air release valves on the c.h. system. vide d.h.w..
10 Inspect the boiler and the system for water If external controls are fitted (e. g. Timeclock, room
soundness and remedy any leaks discovered. thermostat) ensure they ”call for heat”.
INSTALLATION
11 Cold flush the system to remove any loose par- 1 Turn on the electricity supply to the boiler,
ticles and any system debris before starting the switching on the fused spur isolation switch.
boiler for the first time The appliance operation light 10 will flash
every 4 seconds.
The flushing procedure must be in line with 2 Turn the function selector 8 as in Fig. 7.3. The
BS7593 Treatment of Water in d.h.w. c.h. Sys- appliance operation light 10 will flash every 2
tems. seconds.
When the installation and second filling are 10 8 7 6
completed turn on the c.h. system and run it
until the temperature has reached the boiler
operating temperature. The system must then
be immediately flushed through.
This procedure must be repeated twice more.
During this operation we highly recommend
the use of a c.h. flushing detergent in the quan-
tities as specified by the appropriate manufac- Fig. 7.3
turer, whose function it is to dissolve any
foreign matter which may be in the system. The boiler will now go through an ignition se-
quence and the burner will light.
If during the ignition attempt period the boiler fails
The above operation could save the invalida- to light, the full sequence control p.c.b. will go to
tion of your boilers guarantee and will also pre- lockout and the lock--- out signal lamp 6 will ap-
vent problems which you may experience in pear.
the future if an inhibitory is not used.
To reset the boiler press and release the boiler re-
set button 7.
7.5 Condensate pipe and traps
The full length of the condensate pipe should be 7.7 Checking the gas pressure at
check for leaks. the burner
The boiler has a built--- in condensate trap pro-
vided with a ball valve that prevents the escape of This boiler has been tested to the highest qual-
combustion products when the trap is empty. ity control standards.
It is however recommended that any other trap The maximum and minimum gas pressures are
in the drain system is correctly filled with water already set during this quality control process
before to run the boiler. however the checking procedure must be fol-
33
Commissioning
lowed to ensure maximum operating efficiency at the burner), accordingly with the model of
from the boiler. boiler installed.
1 Remove the front panel of the case (see sec- 11 Switch off the boiler and re--- connect the elec-
tion 9.2 in this manual). trical connector A to the modulator coil.
2 Loosen the internal screw 41 (Fig. 7.4) on the 12 Switch on the boiler.
Outlet Pressure Test Point of the Gas Valve and 13 Check that the boiler lights up uniformly.
connect a pressure gauge using a suitable If not refer to section “Ignition gas pressure ad-
hose. justment” of the Service Manual for the necess-
3 Set the d.h.w. and c.h. temperature control ary adjustment procedures.
knobs to their maximum position. If external 14 Switch off the boiler, turn off the hot water tap(s)
controls are fitted (e. g. Timeclock, room ther- and disconnect the pressure gauge.
INSTALLATION
10 9 8 7 6
34
Commissioning
lector 8 to the OFF position and then back to
that indicated in Fig. 7.5. 10 9 8 7 6
5 Repeat this process two to three times leaving
30 second intervals between each ignition.
Check the ignition pressures and visually
check that the burner lights uniformly and in a
controlled manner.
6 If the burner ignition is not uniformly controlled
then checks should be made to:
--- the flue installation and termination.
--- that the flue gasket as shown in Fig. 6.5 page Fig. 7.6
INSTALLATION
27 is in place. 5 Keep pressed the reset button 7 for about 10
--- that the burner and injectors are clean. seconds until the lock--- out signal lamp 6
--- that the boiler is set for the correct gas used blinks.
(see Section Gas Conversion of this manual) 6 The lamps 10 should give the indication as in
7 If the ignition pressure recorded is not as indi- Fig. 7.7.
cated in the Technical Data then refer to section If not, press the reset button 7 repeatedly to ob-
“Ignition gas pressure adjustment” of the Ser- tain it.
vice Manual for the necessary adjustment pro-
cedures. Where: Lamp OFF
Important: after the gas pressure checks and Lamp ON
any adjustment operations, all of the test points
must be sealed and replace the adjustment Fig. 7.7
protection cap. 7 Keep pressed the reset button 7 for about 5
seconds.
7.9 Adjustment of useful c.h. The boiler runs in C.h mode and the lamp 6 is
switched OFF.
output The lamps 10 give the indication as in Fig. 7.8
The following procedure allows the output of the
boiler for central heating to be adjusted to meet Where: Lamp OFF
the system requirement. Adjusting the useful cen-
tral output does not prevent the boiler firing at Flashing
maximum rate for domestic hot water production. lamp, alone
Refer to Fig. 7.11, Fig. 7.12 and Fig. 7.13 (de- or simulta-
pending on the gas used) and determine the cor- neously with
rect burner pressure appertaining to the output an other
required for the central heating requirement. lamp
1 Remove the front panel of the case. Fig. 7.8
2 Open the gas valve outlet pressure test point
8 Rotate the knob 9 in Fig. 7.6 to obtain the pres-
41 (Fig. 7.4) and connect the gauge.
sure to the burner to meet with the central heat-
3 Rotate the knob 9 as in Fig. 7.6. ing system requirements. Refer to the
4 Turn the boiler ON positioning the function se- diagrams shown in Fig. 7.11, Fig. 7.12 or
lector 8 as indicated in Fig. 7.6 and ensure that Fig. 7.13
the timer selector switch and room thermostat, By rotating clockwise the pressure increases.
if fitted, are set to “heat demand”. 9 Make a note of the position of the knob 9 and
Run the boiler in c.h. mode (do not open any recorded this in Fig. 7.9 below with an *.
d.h.w. tap).
35
Commissioning
10 Turn the boiler OFF and ON positioning the kW Natural (G20)
function selector 8 as indicated in Fig. 7.9 33
31
10 9 8 7 6 29
27
25
23
21
19
17
15
13
INSTALLATION
11
Fig. 7.9 9
11 Keep pressed the reset button 7 for about 10 1 2 3 4 5 6 7 8 9 10 11 12 13
seconds until the lock--- out signal lamp 6 M96.24SM/...
mbar
blinks. M96.28SM/...
Note: during the adjustment the boiler doesn’t op- M96.32SM/...
erate. Fig. 7.11
12 Press the reset button 7 repeatedly (2 times) Butane (G30)
until the lamps 10 give the indication as in kW
Fig. 7.10 (useful c.h. output adjustment 32
mode). 30
28
Where: Lamp OFF 26
24
Lamp ON 22
20
Fig. 7.10
18
16
13 Turn the knob 9 to the minimum (fully counter- 14
clockwise) and then on the position correspon- 12
ding to the position obtained on step 8. 10
By turning the knob 9, the lock--- out signal 5 7 9 11 13 15 17 19 21 23 25 27 29
lamp 6 blinks quickly (2 per second) indicating M96.24SM/...
that the setting has changed and must be me- mbar
M96.28SM/...
morised by keeping pressed the reset button
7 for about 5 seconds until the lamps 10 all M96.32SM/...
briefly simultaneously blink. Fig. 7.12
14 To reset the boiler to the normal operation turn
it OFF and ON by the function selector 8. In any
case, the boiler automatically resets to its nor-
mal operation after 10 minutes.
36
Commissioning
INSTALLATION
11 ual and the Service manual to the end user and ex-
9 plain how to use the unit in both c.h. and d.h.w.
modes.
7 10 13 16 19 22 25 28 31 34 37
M96.24SM/... Take the User step by step through the lighting in-
mbar structions.
M96.28SM/...
Show the User how to switch off the appliance
M96.32SM/...
quickly and indicate the position of the electric
Fig. 7.13 supply isolator.
Explain the proper use and adjustment of all sys-
7.10 Checking the ignition device tem controls; this will ensure the greatest possible
fuel economy.
With the burner on high flame close the gas cock.
Explain the function and use of the function selec-
After three ignition attempts (within about three tor.
minutes), the lock--- out signal lamp 6 (Fig. 1.3 on
Explain and demonstrate the function of time and
page 2) must appear.
temperature controls (if fitted).
To reset the boiler press and release the boiler
Explain how to turn off the appliance for both short
reset button 7 (Fig. 1.3 on page 2).
and long periods and advise on the precautions
necessary to prevent damage should the
7.11 Checking the flue system appliance be inoperative when freezing condi-
tions may occur.
The flue system should be visually checked for
soundness. Check all clamps, gaskets and fixing Fill in the details required on the Boiler Guarantee
are secure and tight. Certificate and hand to the User advising them to
return the correct section for boiler Guarantee reg-
Ensure that the flue terminal is sited correctly in ac- istration.
cordance with the flue fitting instructions and
Fig. 5.1 on page 22 of this manual. Finally, advise the User that, for continued safe
and efficient operation, the appliance must be ser-
To carry out a combustion check refer to the in- viced by a competent person at least once a year.
structions given in the section 9.3 of this manual.
Reference figures are given in the sections 4.5 or
4.6 of this manual (Flue gas figures).
37
8 GAS CONVERSION
8.1 Warnings 8 Turn the boiler OFF positioning the function se-
lector 8 as indicated in Fig. 8.2.
The commissioning of this boiler and sys-
tem must only be undertaken by a pro- 10 9 8 7 6
fessionally qualified person in accordance
with the requirements of the Gas Safety In-
stallation and Use Regulations and be ap-
proved by C.O.R.G.I.
Components used to adapt it to the type of gas
available must be genuine parts only.
25
MAINTENANCE
Fig. 8.3
10 Keep pressed the reset button 7 for about 10
14 Closed position seconds until the lock--- out signal lamp 6
Fig. 8.1 blinks.
2 Remove the front panel of the case (see the 11 Connect the C.h. temperature probe NTC 25 in
section General access and emptying hydraulic Fig. 8.3
circuits in the service manual). 12 Press the reset button 7 repeatedly (4 times)
3 Take off the lid of the sealed chamber. until the lamps 10 give the indication as in
Fig. 8.4 (gas type mode).
4 Take the front panel of the combustion
chamber off and remove the burner (29 on Where: Lamp OFF
page 12). See section Ignition and detection
electrodes in the service manual for detailed in- Lamp ON
structions.
Fig. 8.4
5 Carry out the conversion for the type of gas, re-
placing the burner injectors correctly. At this step it is possible to visualize the current set-
6 Re--- assemble the burner, the front panel of the ting by keeping the reset button 7 pressed for
combustion chamber and the lid of the sealed more than 5 seconds. The lamps 10 will flash a
chamber. number of times corresponding to the setting of
the knob 9 in Fig. 8.5.
7 Switch on the appliance at the mains isolating
spur.
38
Gas conversion
15 Open the gas cock (14 in Fig. 8.7)
Gas type L.P.G.
Setting No. 4
NATURAL 1
GAS
14 Open position
Fig. 8.7
Fig. 8.5
16 To reset the boiler to the normal operation turn
Gas Position of Approx. Max current it ON by the function selector 8 on the desired
supply knob 9 through the modulator operation and checking the ignition pressure
device and that the burner lights up uniformly. In any
case, the boiler automatically resets to its nor-
Natural 1 125 mA mal operation after 10 minutes.
gas Factory setting = Natural gas (as illustrated)
MAINTENANCE
L.P.G. 4 165 mA 17 Calibrate the gas valve according to the in-
structions given in the service manual, section
Fig. 8.6 Modulating gas valve --- Adjustment.
13 To change the setting turn the knob 9 on a posi- 18 Set the correct gas pressure for central heating
tion corresponding to the gas used as shown output required, see section 7.9 in this manual.
in Fig. 8.5. 19 Stick on the inside of the left hand side panel
By turning the knob 9, the lock--- out signal adjacent to the data badge the self--- adhesive
lamp 6 blinks quickly (2 per seconds) indicat- label (included with the conversion kit) indicat-
ing that the setting has changed and must be ing the type of gas, and the gas pressures to
memorised. which the appliance has been set. Replace the
14 To memorize the setting keep pressed the adjustment protection cap.
reset button 7 for about 5 seconds until the 20 Replace the front panels of the case.
lamps 10 briefly blinks simultaneously.
39
9 MAINTENANCE
9.1 Warnings Side panels
3 Loosen the screws B. Bring the bottom of the
The procedures detailed in this chapter must panels away from the boiler and lift them, free-
be carried out only by a professionally
ing them from the top hooks (Fig. 9.2).
qualified person. Thus you are advised to
contact an Authorised Service Agent.
Fig. 9.2
Front panel
1 Loosen the three screws A (Fig. 9.1).
2 Lift and remove the panel.
9.3 Combustion analysis check
Air--- Flue exhaust If it is necessary to carry out a combustion analysis
Sampling points remove the plugs indicated in Fig. 9.1.
Reference figures are given in the sections 4.5, 4.6
or 4.7 of this manual (Flue gas figures).
40
Maintenance
circuits in the service manual and check that the * For details see the section Fan, venturi device
pressure in the expansion vessel is not less than and air pressure switch in the service manual.
1 bar. For all the above maintenance operations it is ad-
See also section 4.4 page 14 of this manual. visable to call an approved Service Engineer.
If the pressure is lower, take steps to correct the
pressure level.
9.8 Drain pipe inspection
Check the soundness and integrity of the conden-
9.6 Cleaning the burner sate drain pipe.
The sloping and multi--- gas type burner (29 on Verify the cleaness and correct filling of the con-
page 12) does not need special maintenance, but densate traps.
it is sufficient to dust it with a bristle paintbrush.
To reach the burner:
9.9 Visual inspection of
1 Take off the front of the case.
appliance
2 Take off the removable front of the air--- tight
chamber and the front panel of the combustion Visually inspect all water joints, seals and connec-
chamber. tions for any evidence of leakage and retighten,
grease or replace them as necessary.
3 Brush out the burner with a bristle paintbrush.
MAINTENANCE
ational pressures and adjust as necessary as de-
page 13) air intake pipe (50 on page 13), checked
scribed in section 7.7 page 33 of this manual.
periodically, the venturi device* (46 on page 13)
cleaned and the efficiency of the flue safety circuit
checked at least once a year.
41
*1796211641*
17962.1164.1 0907 48A5 UK
Biasi UK Ltd
Newman Park, Western Way
Wednesbury, WS10 7BJ
Sales Tel No: 0121 506 1340
Sales Fax No: 0121 506 1360
Service Tel No: 0121 506 1350
Service Fax No: 0121 506 1370
www.biasi.co.uk