Вы находитесь на странице: 1из 17

SURAT:

cdp & its implementation

Presented by:-
Anand saurabh
E n r o l l m e n t n o . - 1 0 5 11 0 0 3
Murp-1
Iit roorkee
SuRAT JNNURM_an
_ introduction

™ The jawahar
jawahar Nehru National Urban renewal mission 
Nehru National Urban renewal mission (jnnurm) 
was launched by gov. of India on 3 march,2005
 l h d b     f I di    3 march,2005.
  h

™ Planned to operate on a mission mode by facilitating large scale 
facilitating large scale 
investment in the urban sector, policy and institutional reform, 
investment in the urban sector policy and institutional reform, 
leading to sustainable socio‐‐economic growth in the cities.
leading to sustainable socio economic growth in the cities

™ Programme focuses on 65 selected cities
65 selected cities across the country, 
which includes 35 million plus cities
35 million plus cities, other state capital 
other state capital & cities 
cities 
of heritage & tourism development.
of heritage 

™ Sub‐mission  for urban Infrastructure & governance(
urban Infrastructure & governance(UIGUIG) 

component of JNNURM
component of JNNURM support project for core urban service 
core urban service 
in sub sector 
in sub sector that includes water supply, sewerage & sanitation, 
solid waste management, drainage, roads, urban transport 
system, urban renewal & heritage conservation, conservation of 
t   b   l & h it   ti   ti   f 
water bodies.
SuRAT SURAT_an
_ introduction
The city of Surat in Gujarat is known 
known for 
for 
its textile trade, diamond cutting 
its textile trade, diamond cutting 
, g
andpolishing industries and, since 1994.

Surat had been transformed from 
the one of the filthiest cities to the 
second cleanest city in the country
second cleanest city in the country.

Surat city has seen an unprecedented growth 
unprecedented growth in last four 
in last four decades
decades
recording one of the 
one of the highest growth 
highest growth rates in the country 
rates in the country and a 10‐fold 
population rise. The City 
The City now ranks the 9th 
now ranks the 9th largest city 
largest city in the 
in the country.
country.
At present SMC area is about 
area is about 112 Sq
112 Sq. . Kms
Kms. 
There are about 28 
28 Lakh
Lakh people (2001)

The economic base 
economic base of Surat consists of textile manufacturing, trade, 
textile manufacturing, trade, 
diamond cutting and 
diamond cutting and polishing industries
polishing industries, , intricate Zari works, chemical 
industries and the petrochemical and natural gas based industries.
p g
SuRAT services
The turnaround of the city 
turnaround of the city of Surat happened after the plague in 1994
plague in 1994. This 
event reflected the ability of local 
event reflected the ability 
y of local governance to turnaround and the 
governance to turnaround and the 
g
support of the 
support of the citizens in transforming their city.
citizens in transforming their city.
SuRAT Economic base

The city has made an important position in the world and national 
economy. 

The textile and diamond units 
h textile and diamond units of Surat
l dd d f region contribute to:
b

42 % of the world’s total rough diamond cutting 
rough diamond cutting and polishing
and polishing
70 % of the nation’s total rough diamond cutting and polishing
 %  f th   ti ’  t t l  gh di d  tti g  d  li hi g
40 % of the nation’s total diamond exports
total diamond exports
40 % of the nation’s total man made fabric production
total man made fabric production
28 % of the nation s total man made fibre production
28 % of the nation’s total man made fibre production
18 % of the nation’s total man made fibre export
12 % of the nation’s total fabric production
SuRAT Investment plan
p
SuRAT Water supply
pp y
In 2005‐2006 
In 2005‐ 2006 SMC was serving about 97 percent 
97 percent of its 
its total 
total populated 
populated 
area and 95 percent of its population
area  95 percent of its population  The area  which is not served  is 
95 percent of its population. The area, which is not served, is 
mostly made up of agricultural land within the SMC limits.

The city exploits both ground and surface sources of water
exploits both ground and surface sources of water  but
exploits both ground and surface sources of water, but
90 percent of the gross daily water supply is from surface
90 percent  from surface
sources. The main source of water for the city is the River 
main source of water for the city is the River Tapi
Tapi..

The total number of tube 
wells for water supply in the 
pp y
city is 41.

At present gross 195 
195 lpcd
lpcd is 
being supplied to the 
population of the city.
SuRAT Water demand

The overall net treated water 
demand for the city for the years 
demand for the city for the years 
2011 and 2021 is 956 
2011 and 2021 is 956 MLD
MLD and 1241 
MLD respectively.

Under the water supply monitoring 
mechanism, hourly check for
hourly check for
turbidity, residual chlorine content is 
done at the source. 
done at the source

A chemical analysis and 
A  h i l  l i   d 
bacteriological test is done daily. 

The total distribution network length including the transmission 
lines is 2450 
2450 kms
kms.

The supply is for 2 –
The supply is for 2 – 3 hours daily.
SuRAT Water supply
pp y
SuRAT Water supply distribution_
_vesu & pal‐palanpore
p p p
Pal & Vesu falls in fast developing areas 
fast developing areas of Surat city.
These area were using water either from tanker or private bores
using water either from tanker or private bores, tough in 
these area ground water is brackish 
these area ground water is brackish , due to vicinity of sea
water is brackish , due to vicinity of sea.
water is brackish   due to vicinity of sea

To provide safe & quality water to these areas, water supply network 
capacity of 59 MLD demand  is proposed to cater 3.6 lac
demand  is proposed to cater 3 6 lac population.
population

The main component of  this project 
main component of  this project are water distribution station 
water distribution station at Vesu
& Pal  with total capacity of 287 lac litres, water distribution network 
water distribution network of 65 
km, 3 elevated service 
3 elevated service reserviors
reserviors, each of 5 lac litre capacity.
SuRAT Implementation process
p p

Both the project were sanctioned on 10th
May,2006 and the duration was 24 month each, 
but these were completed on December, 2008
SuRAT Sewerage system
g y
Of the total 112.274 sq. km of area, 92.19 
92.19 percent of the habitable area has a 
percent of the habitable area has a 
comprehensive sewerage 
comprehensive sewerage system
p g system.
y

The numbers 
numbers of sewage pumping 
stations have also been increased 
from 18 in 1996 to 28 in 2005
18 in 1996 to 28 in 2005

There are six 
six sewerage treatment 
sewerage treatment 
plants serving each of the six zones 
l t i h f th i
of the city.
of the city

The schemes serve a total 
Th
The schemes serve 
h a total 
t t l
population of 23.35 lakhs
population of 23.35 lakhs through 
22 main sewerage pumping 
stations and six auxiliary pumping
stations and six auxiliary pumping 
stations.
SuRAT Sewerage system
g y
SuRAT projects
Augmentation of Adajan Sewerage
Part of west sewrage zone
Caters 530 hectare of area.
Designed to trasmit the flow of 15 MLD

Sewerage system for Vesu
g y & Pal‐Palanpore
p
1102 hectare area for vesu & 680 hectare area for palampore are 
most populated & developed among new areas.
Proposed 51 MLD
p IN VESU & 31 MLD in pal‐palporeto
p p p cater 
requirement upto 2036.

Main Features
o Increased the capacity y 103 MLD(from 15 
from 15 MLD
MLD to 118 Mld
to 118 Mld).
).
o Stopped frequent problem of overflowing & chocking of sewerage line.
o Satisfied the needs for Sewage collection 
needs for Sewage collection for estimated population of 
8.2 lacsin
8.2 lacsin 2036, in vasu
2036 & pal‐palmpore.
SuRAT Implementation process
p p
The  completed project cost is Rs.9066.7 lacs.
The operating & maintenance cost is Rs. 22.10 lakhs per month 