Вы находитесь на странице: 1из 12

Shapoorji Pallonji & Co.

Ltd COMPARATIVE STATEMENT APOLLO HOSPITAL


WATER PROOFING SYSTEMS CBD- BELAPUR

Sr.No.Item Description Qty Unit Rate Paty-1 Paty-2 Paty-3


Initial Quote
Final Quote
RemarkInitial Quote
Final Quote
RemarkInitial Quote
Final Quote
57 Providing Water Proofing Treatment to the following areas/
locations by Crystalline Water Proofing system by using
waterprofing chemicals of approved brand/manufacture.
The pre-mixed crystalline waterproofing compound(either
single or multiple) of approved brand/manufacture to be
applied over prepared surface using brush,roller,spray or
squeegee,to the entire area and turned up to a minimum
hight of 300 mm from the finishing level.The crystalline
waterprofing compound applied over the surface,should
penetrate into and from insoluble crystals in the pores &
capillaries in the concrete,which further arrests the passage/
ingress of water into the concrete.

a Water poofing treatment ot Retaining wallas including 2611 m2


applying to the positive/Negative surface of the concrete.

b Water Proofing treament to Ground floor level podium 3594 m2

c Water pooofing treatment to UG sump and STP 2595 m2

d Water proofing treatment to OHT 297 m2

Alternative 1 to Item 57.a


Providing Water proofing treatment for Retaining Walls using
Nano Technology(Zycosil or equivalent). Complete as per
Manufactures Specification.The methodology to be approved
by Structural consultant before applying. Rate only

Alternative 2 to Item 57.a


Providing Water proofing treatment for Retaining Walls using
self Adhesive Sheet Membrance of 1.5mm thick Bituthene
3000 or Bithene CP, cold applied with cross laminated 2 ply
polyethylene film and 1.4 mm minimum rubber asphalt
including protecting the membrance with 25 mm thick Rate only
polyfoam or polyethylene broad.

The surface to be cleaned by raking & cleaning of construction joints, if any


and spreading a coat of cement slurry which penetrates into the structure
which will fill cracks and other porous areas and the surface to be
finished smoothly.

The membrane shall be applied over a prepared smooth substrate in


fair weather condition including applying a coat of primer (re-prime or re-
condition areas contained by dust)and allow to dry before application
of membrane with necessary overlaps between the membrane
in both directions & fixing overlaps by tape,
firm rolling onto the surface to get a tight seal ,proper lapping on to the
membrane at the wall slab junction etc. complete all as per
manufacturer's recommendations etc; complete with all lead & lift for all
materials & labour and as directed. Rate only

58 Water proffing treatment for Terrace Roof Slab using crystalline 10207 m2
Water Proofing System including making proper slopes in the
floor to the pipe outlets by prviding & laying highstrength polymer
mortar of approved brand and manufacture to required thickness
(minimum of 50 mm at the pipe outlet), all as per drawing,details
and as recommended by the manufacturer.(consider Avg 75 mm Thick)

Alternative 1 to Item 58
Providing Water proofing treatment for Terrac Roof Slab using
Nano Technology(Zycosil or equivalent). Complete as per
Manufactures Specification.The methodology to be approved
by Structural consultant before applying. Rate only

Alternative 2 to Item 58
Providing Water proofing treatment for Terrac Roof Slab surface by using
Stone Cobba method.Complete as per drawing and as specified under
section Water Proofing Works in Technical Specifications with all lead &
lift for all materials & laour at all heights & locations and as directed.
(we onsidered brick bat coba of 65 mm thick at outlet & avg 115 mm Rate
thick
only

Alternative 3 to Item 58
Providing Water proofing treatment for Terrac Roof Slab surface by using
Rate only
Bituminous liquid applied membrane of approved make.

The surface to be cleaned by raking & cleaning of construction joints, if any


and spreading a coat of cement slurry which penetrates into the structure
which will fill cracks and other porous areas and the surface to be graded
properly to a slopeof 1:80 (or as specified in the drawing) towards drainage
outlets with cement mortar screed of 1:4 and reinforced with a layer of
chicken mesh 20 mm x 28 g.The substrate should be applied with primer
ensuring full coverage and allowed to dry.
Bituminous liquid applied membranes to be applied over the prepared &
primed substrate surface using brush,roller, spray or squeegee,to the
entire area and turned up to a minimum height of 300 mm from the
finished floor level and apply polyester reinforcement fabric over the
membrane to serve as reinforcement and the finished surface to be
protected by laying a proprietary recommended capping sheet.
The membrane surface to be dressed properly over penetrations,
attachments & down into floor outlets and should be mechanically
secured with pressure seal at all edge condition,change of plane, curb
flashings, upstands etc.
The surface to be treated with 20 mm thick waterproof screed over the
membrane and finished with surfacing material or if tiles to be laid over
the waterproof screed or membrane,use compatible proprietary adhesive,
all as per manufacturer's recommendations etc; complete with all lead Rate only
& lift for all materials & labour and as directed.

Water Proofing
50 Water proofing membrance shall be measured by net area to be covered.

51 Prices deemed to include for all laps,racking and circular cutting and for
dressing around and sealing to all penetrations.

52 Tender shall provide minimum 10 years gurantee against water proofing


work excuted on a Rs.100/- stamp in an approved proforma,effective from
the date of practical completion.

Providing Water Proofing Treatment to the Base slab by


Crystalline Water Proofing system by using
waterprofing chemicals of approved brand/manufacture.

The surface to be treated shal be cleaned by raking & cleaning of


construction joints, if any including treating of construction joints,
honeycombs,cracks,voids,tretment of joints between wall and slab,
actice leakages and other defects in the sub-strate.
The pre-mixed crystalline waterproofing compound(either
single or multiple) of approved brand/manufacture to be
applied over prepared surface using brush,roller,spray or
squeegee,to the entire area and turned up to a minimum
hight of 300 mm from the finishing level.The crystalline
waterprofing compound applied over the surface,should
penetrate into and from insoluble crystals in the pores &
capillaries in the concrete,which further arrests the passage/
ingress of water into the concrete.

The quoted rates shall include for curring and finishing of waterproofed
surface and the same to be tested for any lekage by ponding or by any
other approved method for a minimum of 2 to 3 days.The application
procedures,no.of coats to be applied,mixing proportions etc. all as per
manufacturer's recommendations,with all lead & lift for all materials &
labour at all heights & locations and as recommended by the manufacturer.

53 Below Raft or Base Slab 1628 m2

54 Providing & Laying Water proofing Treatment for Base Slab by using self
Adhesive Membrane of make Preprufe 300R or equivalent, pre-applied
before csting of the base slab which gets bonded to the underneath of
the poured concrete used as base slab.

The membrane shall consist of a thick HDPE film, highly aggrassive


pressure sensitive adhesive & weather resisting coating which bonds
integrally to poured concrete for use base slabs.
The membrane shall be applied for the entire raea and turned up on to
a verticle timber formwork to a minimum height of 300 mm,laid with the
film facing the prepared substrate over a lean concrete of having smooth
dried surface including necessary removal of release liner while applying
necessary overlaps between the membrane & fixing overlaps by tape,
firm rolling onto the surface to get a tight seal etc. complete all as per
manufacturer's recommendations etc; complete with all lead & lift for Rate
all only

55 Alternative 2 to Item 53
Providing & Laying Water proofing to Raft Base slab using
Nano Technology(Zycosil or equivalent). as per
Manufactures Specification.The methodology to be approved
by Structural consultant before applying. Rate only

Alternative 3 to Item 53
56 Providing & Laying Water proofing treatment to Base Slab using
Stone Cobba method.Complete as per drawing and as specified under
section Water Proofing Works in Technical Specifications. Rate only

67 Providing Water Proofing Treatment to the following areas/


locations by Crystalline Water Proofing system by using
waterprofing chemicals of approved brand/manufacture.

The surface to be treated shal be cleaned by raking & cleaning of


construction joints, if any including treating of construction joints,
honeycombs,cracks,voids,tretment of joints between wall and slab,
actice leakages and other defects in the sub-strate.

The pre-mixed crystalline waterproofing compound(either


single or multiple) of approved brand/manufacture to be
applied over prepared surface using brush,roller,spray or
squeegee,to the entire area and turned up to a minimum
hight of 300 mm from the finishing level.The crystalline
waterprofing compound applied over the surface,should
penetrate into and from insoluble crystals in the pores &
capillaries in the concrete,which further arrests the passage/
ingress of water into the concrete.

The quoted rates shall include for curring and finishing of waterproofed
surface and the same to be tested for any lekage by ponding or by any
other approved method for a minimum of 2 to 3 days.The application
procedures,no.of coats to be applied,mixing proportions etc. all as per
manufacturer's recommendations,with all lead & lift for all materials &
labour at all heights & locations and as recommended by the manufacturer.

Water proofing treatment to retaining walls including applying to the 4085 m2


positive/negative side of the concrete.
Alternative 1 to Item 67
68 Providing & Laying Water proofing treatment to Retaining Walls using
Nano Technology(Zycosil or equivalent). as per
Manufactures Specification.The methodology to be approved
by Structural consultant before applying. Rate only

70 Same as Item no 67 but water profing or over head water tankd 121 m2

71 water proofing treatment to Toilet floors using Crystalline water proofing


system including making proper slopes in the flor to the pipe outlets by
providing & laying highstrength polymer mortar of approved brand and
manufacture to reqd. thickness9minimum of 50 mm at the pipe outlets),all
as per drawing,details and as recommended by the manufacturer. 50 m2

Alternative 1 to Item 71
72 Providing & Laying Water proofing to Toilet floors using
Nano Technology(Zycosil or equivalent). as per
Manufactures Specification.The methodology to be approved
by Structural consultant before applying. Rate only

73 water proofing treatment to Toilet floors using Crystalline water proofing1350 m2


system including making proper slopes in the flor to the pipe outlets by
providing & laying highstrength polymer mortar of approved brand and
manufacture to reqd. thickness9minimum of 50 mm at the pipe outlets),all
as per drawing,details and as recommended by the manufacturer.

Alternative 1 to Item 73
74 Providing & Laying Water proofing to Terrac roof slab using Rate only
Nano Technology(Zycosil or equivalent). as per
Manufactures Specification.The methodology to be approved
by Structural consultant before applying.

Alternative 2 to Item 73
75 Providing & layng Water proofing treatment over Terrac Roof SurfaceRate
by only
using Stone Cobba method.Complete with all lead & lift for all materials &
labour at all heights & locations and as specified under section
Water Proofing Works in Technical Specifications .

Alternative 3 to Item 73
76 Providing & layng Water proofing treatment over Terrac Roof Surface by
using Bituminus liquid applied membrane of approved make.
The surface to be cleaned by raking & cleaning of construction joints, if any
and spreading a coat of cement slurry which penetrates into the structure
which will fill cracks and other porous areas and the surface to be graded
properly to a slopeof 1:80 (or as specified in the drawing) towards drainage
outlets with cement mortar screed of 1:4 and reinforced with a layer of
chicken mesh 20 mm x 28 g.The substrate should be applied with primer
ensuring full coverage and allowed to dry.
Bituminous liquid applied membranes to be applied over the prepared &
primed substrate surface using brush,roller, spray or squeegee,to the
entire area and turned up to a minimum height of 300 mm from the
finished floor level and apply polyester reinforcement fabric over the
membrane to serve as reinforcement and the finished surface to be
protected by laying a proprietary recommended capping sheet.
The membrane surface to be dressed properly over penetrations,
attachments & down into floor outlets and should be mechanically
secured with pressure seal at all edge condition,change of plane, curb
flashings, upstands etc.
The surface to be treated with 20 mm thick waterproof screed over the
membrane and finished with surfacing material or if tiles to be laid over
the waterproof screed or membrane,use compatible proprietary adhesive,
all as per manufacturer's recommendations etc; complete with all lead Rate only
& lift for all materials & labour and as directed.
Paty-4
Remark
Initial Quote
Final Quote
Remark