RIG Number

0
Well 0 Location
MTD 7500 ft TVD 7500
Contractor

Present Operation 0
Objective 0
0:00 OPERATIONS
Start End Hrs
0:00 1:00 1:00 WOC
1:00 2:00 1:00 RIH
2:00 3:00 1:00 Drlg
3:00 3:30 0:30 Move your mouse over the START cell to see how
3:30 5:00 1:30 Clear the Drlg report with the Clear Time Breakdow
5:00 15:00 10:00
15:00 23:00 8:00
23:00 0:00 1:00

Mud Check Time


Mud type 0 MBT 0.0
Weight 0 ppg PH 0.0
Viscosity 0 sec Pm 0.0
PV/YP 2.15 Ratio Pf 0.0
10 sec 10 min 30 min Mf 0.0
Gels
5 21 0 Chlorides 0.0
API W.L. 0 cc Oil 0.0
HTHP 250 DEG 0 cc OWR 0.0
HTHP 300 DEG 0 cc Calcium 0.0
Solids 0 % LGS M³ 0
Sand 0 % Mud Losses bbls
Hole Vol bbls 668 Hole
Pit Vol bbls 2000 Surface
Daily Mud Cost $0.00 Per/Hr
Total Mud Cost $0.00 Total Daily
Mud Log Data
Depth MD 7500 ft Mud wt. 0
Depth TVD 7500 ft D Exp 0
Formation 0 BG Gas 0
Shale Dens 0 ppg Conn Gas 0
Pore Press 0 ppg Trip Gas 0
ROP Avg 0 Ft/Hr Max BG gas 0
ROP Max 0 Ft/Hr
Anchor Tension
1 0 4 0 7 0
2 0 5 0 8 0
3 0 6 0 Max 0
BHA You can add your BHA details here
Mud Motor Lobe 0 Stage 0
Jar Hrs 0 Serial # 0
MWD data Distance from Bit ft 0
Accidents? Who? Detailed Report?

Directional Drilling Contractor Daily cost


0 $0.00
Diesel at Rig 0
Consumables Industrial Water at Rig 0
Potable Water at Rig 0
Weather Report
Sky 0 Swell Hgt 0
Visability 0 Swell Dirct 0
Temp 0 SW Period 0
Wind dirct 0 Waves Hgt 0
Speed 0 Direction 0
Barometer 0 Period 0
Government Representative On Site
AFE No. Proposed T. D.
0 0 ft
0 Depth Yesterday
ft 6,000 ft
0 Last casing Next Casing
0 0
Daily Cost $0.00
Accumulated Cost $0.00
00:00 - 24:00 Rotating Hours 24

START cell to see how to enter the time break down


e Clear Time Breakdown button

hrs Bit Manuf: 0


Bit No 0 Dull Bit No
Size 0 Depth In ft
IADC 0 Depth Out ft
Type 0 Drilled ft
Serial No. 0 Hours
ppm Depth IN ft 0 WOB
% Hours 0 RPM
% WOB 1000 lbs 0 ROP x/hr ft
RPM 0 Inner
Krpm 0 Outer
s bbls ROP Ft/Hr Dull
Jets 0 Location
TFA Bearings
Personnel Seals
Operator 0 Guage
contractor 0 Reason
Service Co 0
catering 1
Other 0
Total 1
Report Remarks

Output 0 Motor Bend° 0


0 Manuf: 0 IBS Days
0 Serial /Type 0
Drilling Engineer
Well Site Geologist
Daily cost Days on Location Total Cost
$0.00 0 $0.00
M³ Diesel at Camp 0
M³ Industrial Water at Camp 0
M³ Potable Water at Camp 0
Gasoline 0
Work boat 0 Pitch° 0
Diving 0 Pitch Sec 0
Heave Hgt 0 Riser Tens 0
Seconds 0 Riser° 0
Roll° 0 BOP° 0
Roll Sec 0 Vessal Hdg 0
0
Daily Drilling Report No.

Days Since Spud


Spud Date 20-Nov-08
Progress BOP Drill TRIP Drill
1500 ft No No
ext Casing PIT / Shoe Test Next Location
0 ppg 0
0.00 Est AFE Cost Lost Time Accidents
0.00 $0 Days since LTA
4 Rig Down / Rig Repair Time Last 24 Hrs.:

Pulled Bit Drilli


0 Depth ft 7500
0 PU 1000 lbs 0
0 Avg Drag 1000 lbs 0
0 Trq. btm. Amps 0
0 AV DP 128
0 AV HWDP 128
0 AV DC 273
/Hr Pump
0 Pump No. 1
0 Liner Size 0
0 SPM 120
0 Press. 0
0 Total Pump Output bpm
0 Slow Circulation
0 Depth ft 0
Reason Pulled SPM 0
Press psi 0
Surve
#1 #2
MTD
TVD
Inc °
Azim °
N+ / S-
E+ / W-
V/S
DLS °

Hrs 0 Total Hrs 0


0 Companyman 0
Gamma Placement ft 0 Other
0 RTKB - MSL RTKM - ML
0
ost Solids Control Equipment
0 Top Scrn Btm Scrn
M³ Shaker #1 0 0
M³ Shaker #2 0 0
M³ Shaker #3 0 0
M³ Mud cleaner #1 0 0
Mud cleaner #2 0 0
Wt In Wt Out
Centrifuge 0 0
Desander 0 0
Desilter 0 0
De-Gasser 0 0
864

864 Report Date


0-Nov-08 3-Apr-11
Last BOP Test
30-Dec-99
ext Location

cidents 0
TA 0
0

Drilling Data
7500 Rotating Wt 1000 lbs 0
0 SO 1000 lbs 0
0 Max Drag 0
0 Trq Off Btm 0
128 BTMS Up Mins 23
128 Noz Vel Ft/sec 191
273 ECD ppg 93.0
Pump Data
1 2 3
0 0 0
120 0 0
0 0 0
14.88
Slow Circulation Rate
0 0 0
0 0 0
0 0 0
Survey Data
#3 #4 #5

0
Other 0
TKM - ML RTKB-well head

ontrol Equipment
Flow Over Under Hours
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Hours
0
0
0
0
Pollution No