TAMUIN - TEG / TEG II

4 X 130 MW

Owner
Sithe Energies, Inc. (for CEMEX)

Installation site
Tamuin, State of San Luis Potosi,
Mexico

Commercial operation date


2004

Electrical output
4 x 130 MW

The 520 MW Termoelectrica Del cement plants in Mexico holding by a PEMEX oil refinery. Alstom’s
Golfo (TEG & TEG II) power plant was self-supply permits. As the plant’s technology is achieving very high
built at Tamuin in the State of San turnkey contractor, Alstom supplied sulfur capture with greatly reduced
Luis Potosi in Mexico, for CEMEX, the the plant’s 4 x 130 MW circulating limestoneconsumption, as well.
world’s third largest cement company. fluidized bed (CFB) boilers, which The units went into commercial
The plant supplies power to 13 CEMEX cleanly burn petroleum coke supplied operation in 2004.
Technical data of steam generator Mode of operation
Main steam flow 395 metric tons/hr 870000 lb/hr Baseload
Superheater outlet steam pressure 128 Bar 1856 PSIG
Superheater steam temperature 541°C 1005°F Type of construction of the steam
Feedwater temperature 243°C 469°F generator
RH steam flow 362 metric tons/hr 798000 lb/hr Dual grate, natural circulation
RH steam pressure 33.4 Bar 484 PSIG
RH steam temperature 540°C 1004°F Ignition fuel
RH inlet temperature 357°C 675°F Diesel oil

Fuel (as received) Fuel feed


Origin/Type Cadareyta refinery / Petroleum coke Gravimetric petcoke feeder
Design Range Drag chain conveyors
Gross calorific value (MJ/kg) 31.7 31.4 - 33.7

The other names mentioned, registered or not, are the property of their respective companies. Please note: The information in this Literature is of a general nature, and may not be applicable for use in any specific application.
(BTU/lb) 13,650 13,500 - 14,500 Air and flue gas systems
Moisture content 8% 7% - 9% 1 x 100% primary air fan
Ash content 0.46% 0.14% - 0.68% 1 x 100% secondary air fan
Sulfur 6.02% 4.97% - 6.31% 1 x 100% induced draft
Volatile matter 10% 9% - 11% 1 x 100% fluidization air fan
Fixed carbon 81.54% 80% - 83.36%

Ref: PWS/BPROS/TMNCFB08/eng/EES/12.08/US/6741 © ALSTOM 2009. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM.
Air heater
Flue-gas emission levels at stack Ljungstrom quadrisector regenerative
NOx @ 6% O2 410 mg/Nm3 200 ppm air heater
SO2 1080 mg/Nm3 360 ppm
Particulates 50 mg/Nm3 Associated equipment
Electrostatic precipitator
Limestone injection system
Sand injection system

POWER

For further information, please contact one of our Regional Sales Offices: www.power.alstom.com

Western Europe/ North, Central, & Eastern North America/Mexico/ Asia Pacific India
South America/Africa/ Europe/Russia/Central Asia Central America/Caribbean Tel: +33 1 46 29 15 85 Tel: +91 124 4221 100
Middle East Tel: +41 56 556 3477 Tel: +1 860 285 2348 Fax: +33 1 46 29 16 70 Fax: +91 124 4731 600
Tel: +33 (0)1 34 65 43 47 Fax: +41 56 205 6075 Fax: +1 860 285 4172
Fax: +33 (0)1 34 65 42 12

Вам также может понравиться