Building Progress Checklist

Sublot Homeowners

Date Started Projected Completion Date


**City/ County Inspections
SITE WORK EXTERIOR FINISH
 Meet customer at Homesite ***  Exterior Concrete**
 Clearing  Final Grade**
 Locate Utilities  Check Doors/Windows and Screens
 Temporary Power/ Meter  Paint exterior Doors & Trim
 Stake out House  Caulking completed
 Sewer Connections ** 
 Foundation Excavate**
 Septic System** FINISH WORK BEGINS
 Well Water**  Pre-paint
  Finish Trim/ Cabinets/ Fireplace
 Paint
CONSTRUCTION BEGINS  Install Hard Flooring
 Footers/Foundation Work**  Countertops
 Brick Ledges  HVAC Finish
 Footer Drains  Plumbing Finish
 Downspout Drains**  Electrical Finish
 Insulation on Exterior of Walls or Slab  Specialties Finish Security/ Speakers/
Areas** Vacuum/ Intercom/Computer
 Backfill/Rough Grade Gravel fill per  Install Light Fixtures
Code**  Install Carpet
 Plumbing Drain Stacks**  Install Hardware
 HVAC for Slab**  Final Clean
 Concrete Floor  Punch-Out Items
 Set Beams  Final Inspections**
  Meet customer at Home ***
 Closing
FRAMING BEGINS – ROUGH 
 Rough framing
 Install Windows and Doors MISCELLANEOUS
 Roofing 
 Install Fireplace 
 Meet customer at Home *** 
 Exterior Siding/Brick/Stone 
 Plumbing 
 HVAC 
 Electrical 
 Rough Inspections** 
 Prewire Security/ Speakers/ Vacuum/ 
Intercom/Computer 
 Insulate/Caulk** 
 Drywall 