Академический Документы
Профессиональный Документы
Культура Документы
QUALITY
ASSURANCE
MANUAL
CORRELATION CHART
ISO 9001:2000 & AS9120 QA MANUAL TW METALS UK & TW METALS POLSKA TW METALS FRANCE
CLAUSE NUMBER PARAGRAPH PHILIP CORNES PROCEDURE / INST NO PROCEDURE / INST NO
NUMBER PROCEDURE / INST NO
4.0 Q. M System 4.0
4.1 Gen Requirements 4.1 Work Inst No’s 7,8 & 9 Work Inst No’s 9, 10 & 11
4.2 Documentation 4.2
Req’ments
4.2.1a 2.0 & 4.2.1a)
4.2.1b 2.1 & 4.2.1b)
4.2.1c 2.1.3/2.1.4 & 4.2.1c)
4.2.1d 4.2.1d)
4.2.1e 4.2.1e) / 4.2.3 & 4.2.4
4.2.1f 4.2.1f)
4.2.2 Quality Manual 2.1/2.2 & 4.2.2
4.2.2a 1.0 b) & 4.2.2a)
4.2.2b 4.2.2b)
4.2.2c 4.1.2 & 4.2.2c)
4.2.3 Control of Doc’s 4.2.3 Proc No 19 & 20 Proc No 19 & 20 Proc No 17
4.2.4 Control of Records 4.2.4 Proc No 22 Proc No 22 Proc No 16
5.0 Management 5.0
Responsibility
5.1 Management 5.1
Commitment
5.2 Customer Focus 5.2
5.3 Quality Policy 5.3
5.4 Planning 5.4
5.4.1 – Quality Objectives 5.4
5.4.2 – Q.M.S Planning 5.4
ISO 9001:2000 & AS9120 QA MANUAL TW METALS UK & TW METALS POLSKA TW METALS FRANCE
CLAUSE NUMBER PARAGRAPH PHILIP CORNES PROCEDURE / INST NO PROCEDURE / INST NO
NUMBER PROCEDURE / INST NO
7.0 Product
Realization 7.0
7.1 Planning of 7.1
Product
Realization
ISO 9001:2000 & AS9120 QA MANUAL TW METALS UK & TW METALS POLSKA TW METALS FRANCE
CLAUSE NUMBER PARAGRAPH PHILIP CORNES PROCEDURE / INST NO PROCEDURE / INST NO
NUMBER PROCEDURE / INST NO
7.2 Customer Related 7.2
Processes
7.2.1, a, b, c & d 7.2.1
Determination of
Requirements Related to
the Product. Proc No 1 Proc No 1 Proc No 1
7.2.2, a,b,c & d 7.2.2 Proc No 2 Proc No 2 Proc No 2
Review of Requirements
Related to the Product
7.2.3, a,b & c 7.2.3
Customer Communication
7.3 Design & Development 7.3
7.4 Purchasing 7.4 Proc No 6 Proc No 6 Proc No’s 6,6a & 6b
7.4.1, a,b,c & d 7.4.1 Proc No 4 Proc No 4 Proc No 4
Purchasing Process
7.4.2, a,b,c,d,e,f,g & h 7.4.2 Proc No 3 Proc No 3 Proc No 3
7.4.3, a,b & c
Verification of Purchased 7.4.3 Proc No 6 Proc No 6 Proc No’s 6, 6a & 6b
Product
7.5 Production & Service 7.5
7.5.1, a,b,c,d,e & f 7.5.1 Proc No 7 and Proc No 7 and Proc No 7 and
Control of Production and Work Inst No 3 Work Inst No 3 Work Inst No’s 5,6,7 & 8
Service Provision
7.5.2 Validation of 7.5.2
Processes for Production
& Service
7.5.3, a,b, & c
Identification and 7.5.3 Proc No 12 Proc No 12 Proc No 12
Traceability
7.5.4 Customer Property 7.5.4 Proc No 5 Proc No 5 Proc No 5
7.5.5, a thro g incl 7.5.5 Proc No 6 Proc No 6 Proc No’s 6, 6a & 6b
Preservation of Product Proc No 9 Proc No 9 Proc No 9
Proc No 10 Proc No 10 Proc No 10
Proc No 11 Proc No 11 Proc No 11
ISO 9001:2000 & AS9120 QA MANUAL TW METALS UK & TW METALS POLSKA TW METALS FRANCE
CLAUSE NUMBER PARAGRAPH PHILIP CORNES PROCEDURE / INST NO PROCEDURE / INST NO
NUMBER PROCEDURE / INST NO
7.6, a thro f incl. 7.6
Control of Monitoring & 7.6.1 Proc No 25 Proc No 25 Proc No 21
Measuring Devices
8.0 Measurement, Analysis 8.0
& Improvement.
8.1, a, b & c General 8.1 Proc No 18 Proc No 18 Proc No 15
8.2 Monitoring & 8.2
Measurement
8.2.1 Customer 8.2.1
Satisfaction
8.2.2, a & b
Internal Audits 8.2.2 Proc No 23 Proc No 23 Proc No 19
8.2.3, a,b & c
Monitoring & Measurement 8.2.3
of Processes
8.2.4 Monitoring & Proc No 6 Proc No 6 Proc No’s 6,6a & 6b
Measurement of Product 8.2.4 Proc No 7 Proc No 7 Proc No7
8.2.4.1 Inspection 8.2.4 Proc No 8 Proc No 8 Proc No 8
Documentation Work Inst No 3 Work Inst No 3 Work Inst No’s 5,6,7 & 8
8.2.5 Evidence of
Conformance – Certificate 8.2.5
of Conformity
8.3, a,b, & c 8.3
Control of Non Conforming 8.3.1 Proc No 14 Proc No 14
Product 8.3.2 Proc No 15 Proc No 15 Proc No 14
8.4, a,b,c & d 8.4
Analysis of Data 8.4.1
8.5 Improvement 8.5
8.5.1 Continual 8.5.1 Proc No 14 Proc No 14
Improvement Proc No 16 Proc No 16 Proc No 14
8.5.2, a thro h incl 8.5.2 Proc No 18 Proc No 18 Proc No 15
Corrective Action
8.5.3, a thro f incl 8.5.3
Preventive Action
TABLE OF CONTENTS
Signed: ________________________
Managing Director
2.1.1 The Quality System is documented in three (3) tiers and considers
the requirements specified by ISO 9001:2000/AS9120
3.0 ORGANISATION
The responsibilities and authority of each of the positions which influence product
quality or the effectiveness of the quality management system are defined in this
section. The lines of responsibilities and interrelation of such personnel are also
shown schematically in the organisation chart, which can be found at paragraph
3.1.10. Responsibilities are further defined in the Company Operating
Procedures and, where applicable, quality plans. In-house verification
requirements and responsibility for their fulfilment are described in this manual
and the supporting procedures.
3.1 RESPONSIBILITIES
a) Quality Assurance/Control
(Note: For day to day running activities)
b) Accounts/Credit Control
c) Information Technology
b) In-process inspection
a) Customer shipments
4.1.1 The key processes needed for the quality management system and
their application throughout the organisation are identified in the
“Key Process” map on the following page.
Entry requirements quotes & requirements requirements requirements software Data for shipping / bookings
(Order
Picking & Status of Invoicing data Release resource Inventory maintenance Invoicing
Despatch WIP requirements requirements reduction data
data
2.1 Communicating relevant
Management business plan objectives & Communicating relevant business plan Communicating relevant business plan objectives & goals
Responsibility goals. objectives & goals.
Management Responsibility
Gen quality
2.2 Quality General quality requirements requirements, General quality requirements
Management per Q. Manual/Procedures & objectives, per Q. Manual/Procedures & General quality requirements per Quality
Instructions monitor & Instructions Manual/Procedures & Instructions
report Data for
2.
performance software
2.3 HR Recruitment, training plans & Information re planning, Recruitment, requirements
Management records recruitment & training training and Recruitment, training plans & records
plans & maintenance.
records.
2.4 Material Supply of Mat’l quotes. Supplier Requirements Data for
Purchasing costs and packing & Approved evaluation / Human & details of incoming Data for
lead times warehouse suppliers approval resource incoming shipping spend
equipment requirements material requirements commitment
3.1 Information re new software Human
IT Software maintenance and and software performance resource Software maintenance and user guidance/instruction
user guidance/instruction data. requirements
Supporting Processes
5.1 TW Metals and Philip Cornes management team assure the quality
policy and any statutory and regulatory requirements are understood,
implemented and maintained by means of employee training, posted
copies of the policy statement and day to day communication with
employees. This is further supported by periodic management reviews of
the quality system, continuous improvement initiatives, monitoring quality
objectives and ensuring the availability of resources.
5.3 Further to paragraph 5.1 above, the Quality Policy Statement, signed
by the Managing Director includes a commitment to comply with
requirements and continually improve the effectiveness of the quality
management system. Monthly performance reports provide the
framework for establishing and reviewing quality objectives and the
continuing suitability of quality policy
• Meetings
• Email notifications
• Notices/publications/performance measures on noticeboards
• Induction Training
• Quality Awareness Training Sessions
6.3 TW Metals & Philip Cornes determines, provides and maintains the
infrastructure needed appropriate to it’s business. Infrastructure
includes
• buildings, workspace and utilities
• process equipment, both hardware and software
• support services, such as communication and transportation.
6.4 Periodic audits are carried out by Health & Safety Consultants and
Environmental Officers which help ensure the companies continued
compliance with regulations, good housekeeping and safe work
practices.
• Visits to customers
• Customer visits to TW Metals & Philip Cornes
• Periodic mailshots of brochures/catalogues containing product
information and details of the company activities
• Monitoring customer feedback and complaints
• Follow up calls via telephone, email, fax and visits relevant to
enquiries, contracts and order handling, including amendments
7.3 Design and development is not applicable to TW Metals & Philip Cornes
business.
7.4 Purchasing
7.5.1 TW Metals & Philip Cornes do not carry out material production or
servicing, but do cut material to length according to customer
requirements.
Procedure No 7 “In Process Inspection” and Work Instruction No 3
“Cutting” which can be found in sections 2 and 3 respectively of this
quality manual detail the cutting machines utilised, method employed
and inspection controls in place.
All items received are marked in accordance with the relevant material
specification by the manufacturer.
Material identification is maintained at all stages from receipt through
to despatch.
Unique identification is typically by manufacturers cast/heat/lot
number/batch number, which is recorded into the system, traceable to
the relevant certification and provides a complete history of the item.
Inspection Documentation
8.2.5 All inspection records are made available, or upon request, copies
provided to the customer for evidence of product conformity.
• Customer PO No
• Material description
• Quantities being supplied per cast/heat/lot number
• Evidence of final inspection & Ist off inspection when applicable
• Order instructions including certification requirements
• Packing specification
8.5 Improvement