BESCOM Meter & Deposit Transfer

FRIDAY, AUGUST 27, 2010


Lets Do It in Better way

For benefit of those owners who have not transferred name and deposits transfer to
their name from previous owner/builder, here is the list and procedure to do same
yourself.

List of Documents:

(1) NOC from previous owner/Builder for transfer addressed to AEE.

a. Content of Form-IV can be used for this purpose.

b. In case of Builders, typically they provide this letter on their letterhead.

(2) Copy of Latest electricity Bill

(3) Copy of Latest electricity Bill Payment Receipt

(4) Meter Transfer Application- Form-I

(5) Power Supply Agreement Form-II, With stamp duty of Rs. 200

(6) Indemnity bond Form-III, With stamp duty of Rs. 100


a. payment of stamp duty:

For (5) and (6) applicable Stamp Duty can be paid in two ways:

Option 1 - Doing franking on the document.

Option 2 - Using e-Stamping.

b. Use legal size papers (Rs. 2.00 per page), typically used for property related
agreements etc and should be available at your nearest Sub-Registrar Office.

c. Get printout or photocopy of these forms (II & III) on legal size paper and get the
Franking done at your nearest Sub-Registrar office or obtain required e-Stamping
certificates (Preferred).

d. They need Power agreement (Form-II) to be submitted in 2-copies ( I am not


sure the reason, may be someone can try to figure-out it for the benefit of others).

Prepare two sets of Power agreement, however Franking (If not using e-stamping
option) is to be done only one of them, other can be marked as "DUPLICATE" on
top

(7) Sale deed copy - (Carry a Certified Copy of Sale Deed if you have)

(8) Meter Details (Optional): Provide following info on meter in one sheet

(i) make e.g. L&T

(ii)Serial Number e.g. 097988999

(iii)Latest Reading e.g. 678

(iv)Capacity e.g. 5KW

(This is optional as BESCOM has to complete the field report to get these details,
see page#2 of embedded application form)

(9) e-Stamping certificate for stamp duty of 100.00 toward Indemnity Bond (Article
29)
(10) e-Stamping certificate for stamp duty of 200.00 toward Power Supply
Agreement.

Notes: (9) and (10) are required if you choose e-stamping(preferred) for paying the
stamp duty.

---------------------------------------------------------------------------------------------------------------
-----------------

If you are planning to use e-Stamping,following is the process (Preferred way for
paying stamp duty):

1. Visit SHCIL e-stamping centers and obtain e-stamping certificates for both the
forms.

Refere http://www.shcilestamp.com/estamp_statekarnataka.html

2. You need to mention Certificate number for all the additional documents
sheet(header and footer of the respective documents i.e. Form II and Form III).

3. While applying for estamping, in document description clearly mention "Indemnity


Bond for BESCOM Meter Transfer", and for Form-II mention "Power Supply
Agreement for BESCOM Meter Transfer".

---------------------------------------------------------------------------------------------------------------
------------------

Following are Official Expenses:

----------------------------------------------

1. Indemnity Bond Stamp-Duty : Rs. 100.00

2. Power Supply Agreement Stamp-Duty : Rs. 200.00

3. Service Charges, Photocopy, Legal size Papers etc. : Rs. 050.00


4. Transfer Fee : Rs. 100.00

-----------------------------------------------------------------------------------------------------------

Total : RS. 450.00

-----------------------------------------------------------------------------------------------------------

Typical Issues raised by BESCOM officer:

1. Provide tax receipt/Khata etc

Ans: Politely answer that, For proof the ownership of property I have attached copy
of sale deed as specified in Section 36.01 Note: (i) of BESCOM rulebook.

2. Officer verifying the document will give a one page related to Field Report from
Jurisdictional BESCOM Junior Engineer and ask you to go and collect
from concerned Engineer.

Ans: Politely answer that this document is supposed to be internally processed.


Applicant need not do it himself.

Additionally, the document supposed to be prodived by applicant DOES NOT


list that as it an internal document. Show the copy of above rulebook (Section-
36.01).

Reference Docs:

1. Copy of related BESCOM rules

http://www.scribd.com/doc/36545424/REFERENCE1-BESOM-
MANUAL-METER-TRANSFER
2. BESCOM Circular TOI

http://www.scribd.com/doc/36545197/Bescom-Circular-TOI-22-May-
2010-BESCOM-Meter-Transfer

3. Application forms (PDF)

http://www.scribd.com/doc/36544929/Application-Form

(Embedded Below as well)

4. Document Checklist:

Bescom Meter Transfer Document Checklist

Notes:

Typically time frame for meter transfer is one to two weeks and
Maximum is 4 weeks.

Doe's and Don'ts

1. Don't Pay any BRIBE.

2. Do take photocopy of all the completed document (preferably after


having verified and just before submission).

3. Do clear all the due before submitting the application.


4. Do make the applicable security deposit if any.

Notes about BESCOM:

-------------------------

Opposite to my perception, I found concerned BESCOM official


reasonably co-operative.

BESCOM Public Information Officers (PIOs) were very responsive and


prompt to my RTI queries. I got some of the clarification very promptly
with all requested details from PIO, BESCOM, K.R. Circle.

Please do post your feedback on the article, suggestion to improve,


correction required or anything on your experience which add some
value to the article to make the process overall complete.