EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-A-114
A1 Fill material shall be placed in lifts not exceeding 200mm in loose depth.
Sec. 6.3.2.2
Fill material shall be placed in lifts not exceeding 100mm in loose depth SAES-A-114
A2
for hand-operated compaction. Sec. 6.3.2.2
Fill and backfill adjacent to any type of structure shall not be compacted
SAES-A-114
A4 with heavy equipment; Hand operated equipment shall be used within
Sec. 6.3.2.3
1.2 meters of any structures.
Compacted surfaces of fill and backfill shall be finish graded to the cross SAES-A-114
A6
sections, lines, grades and elevations as indicated on the drawings. Sec. 6.3.2.11
B Compaction Inspection
Compaction shall begin only after the fill or backfill has been properly
placed and the material to be compacted is at the proper moisture SAES-A-114
B1
content. +/- 3% of the optimum moisture content per ASTM D1557 or Sec. 6.3.2.7
ASTM D698, whichever is applicable. (PIP-CVS02100, Sec. 4.3.2.3)
SAES-A-114
B2 Compaction shall be performed with equipment compatible with soil type.
Sec. 6.3.2.1
Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Fill Placement and Compaction Inspection SAIC-A-1004 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Under foundations with static loads over 320kPa and foundations for
vibrating or heavy machinery and pavements, 85% of relative density SAES-A-114
B5
(ASTM D4253/ASTM D4254) for cohesionless soils or 95% of of the Sec. 6.3.2.5
maximum density as determined by ASTM D1557 for cohesive materials.
Compaction by water jetting is not permitted; Flooding may be used if the SAES-A-114
B7
material is cohesionless freely draining sand. Sec. 6.3.2.8
Compacted surfaces of fill and backfill shall be finish graded to the cross SAES-A-114
B10
sections, lines, grades and elevations as indicated on the drawings. Sec. 6.3.2.11
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 28 April 2004
2- SACSM -- Saudi Aramco Construction Safety Manual, February 1993