EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
One Modified Proctor Test per ASTM D1557 with corresponding Proctor
SAES-A-114
A2 curve shall be performed for each type of fill material or where there is a
Sec. 6.3.3.1
change in the type or the source of material.
Nuclear density gauges, when used, shall have a valid calibration SAES-A-114
A7
certificate per the requirement of ASTM D2922, Sec. A1.2. Sec. 3.2
Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The depth of the test holes shall be no greater than 300mm (12 inches) SAES-A-114
A8
deep. (ASTM D 2922, Sec. 1.1) Sec. 3.2
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 28 April, 2004
Page 2 of 2