Вы находитесь на странице: 1из 1

SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Concrete and CMU Surface Preparation and Protection
SAIC-M-1008 18-May-05 CIVIL-
Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Foundations, Grade Beams, Wall Footings shall be Dimensionally


A1 IFC Drawings
Correct and dowels are positioned as shown on IFC Drawings.

Concrete, CMU & Brick shall be free of laitance, loose materials, oil or
SAES-M-100
A2 other materials that reduce or prevent bonding with mortar.
Sec. C.3
(ACI 530.1, Sec. 3.2B)

Surfaces to be in contact with mortar or grout shall be clean and free of 1997 UBC
A3
deleterious materials. Sec. 2104.4.2

1997 UBC
A4 Masonry units shall be dry at the time of placement.
Sec. 2104.3

Masonry units shall be stored so that at the time of use the materials are 1997 UBC
A5
clean and structurally suitable for the intended use. Sec. 2104.2.1

The tops of walls not enclosed or sheltered shall be covered with a 1997 UBC
A6
strong weather resistive material at the end of each day or shutdown. Sec. 2104.3.1

Partially completed walls shall be covered at all times when work is not in
progress (to control both temperature and humidity); Covers shall be 1997 UBC
A7
drapped over the wall and extend a minimum of 2 feet (600mm) down Sec. 2104.3.1
both sides and shall be securely held in place.

Protection shall be maintain for at least 24 hours after masonry 1997 UBC
A8
placement and grouting operations are completed. Sec. 2104.3.5

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 29 January 2003
2- 1997 UBC -- Uniform Building Code, 01 January 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1

Вам также может понравиться