Вы находитесь на странице: 1из 8

How to inspect a project tmder implementation?

Subhash Nathuramka, FCS, Principal Consultant, Columbus Capital Management Ltd.,


Mumbai.

Projects under implementation are subjected to procedural inspections by the officials


of lending banks and fmancial institutions to ensure that the funds advanced by
e-mail: them are put to right use. Aspects which are to be considered while undertaking
snathuramka@yahoo.com
such inspections and to be included in the inspection reports are briefly outlined in
this article.

Introductory CA Certificate needs to be distinguished from


Inspection is an integral and critical part of the exercise to Chartered Engineer's Certificate
ensure smooth and proper implementation of a project. Post A Chartered Accountant is a competent accounting
appraisal and post sanction of finance by Banks, financial professional to certify the expenditure incurred based on the
institutions it becomes imperative that the project is basis of verification of vouchers, supporting and books of
implemented as per the plan within the envisaged timeframe. account. On the other hand a Chartered Engineer is a
Regular inspections are made to check whether the project is competent professional to certify the physical progress of
being implemented in accordance with the approved plan/ the work done.
project report and deviations are pointed out with remedial There may be following situations where the expenditure
measures in the report. has actually been incurred and certified by C.A. but it does
Banks and Financial Institutions rely heavily on the not provide the lending bank the right input or guidance
inspection reports (as also Certificates from Practising required to take a fair view in the matter of release of credit
Chartered Accountants) before making disbursement of facility -
sanctioned credit limits for part financing the projects. The 1. Although the expenditure has been incurred by the
inspections are made by the officials of lending banks, company it does not relate to the specific project under
financial institutions or by their authorized empanelled consideration.
Chartered Engineers. The inspection reports emphasize more
2. The expenditure incurred on purchase of items ,
on the physical progress of the work done and the
equipment is not as per the approved plan.
Expenditure incurred and do not at times provide inclusive
view of the entire project. There are several other factors 3. The expenditure has been incurred on a head other than
and aspects which need to be seen and reported along with the head envisaged in the approved plan e.g. more civil
suggestions to take corrective steps. It would be a good works, higher preoperative expenses, higher soft costs,
idea if an inspection report like a project report also covers less expenditure on equipment and machinery.
all relevant factors having a bearing on the project be it Similarly without the verification of books of account the
technical, commercial, financial or managerial to ascertain Chartered Engineer is not in a position to know the actual
whether the implementation of the project is going on the expenditure incurred. He can only physically inspect the project
right lines. and report the progress made in terms of percentage of work

IOSI CHARTERED SECRETARY Jt======= 26


I (A· 10) JANUARY 2011

Вам также может понравиться