Material Consumption
This task is the first part of the tutorial. You want to view a report on material consumption.
14. You want to view a report on lead time production. Double-click on the menu item "Lead Time Production".
15. If this dialog box appears, enter your SAP BW user name (here: demo) and password (here: best). Then choose
"OK".
16. The "Lead Time Production" report opens. Initially, the report shows key figures of lead times per plant.
17. To drill down for material additionally, choose "Drilldown in the rows" for the entry "Material".
18. To drill down for calendar day additionally, choose "Drilldown in the rows" for the entry "Calendar day" in the
navigation block.
19. To view the values for one plant only, do the following: Choose a left mouse click on one plant in the table area.
20. Then choose "Keep Filter Value".
21. In order to see a pie chart which displays the development of key figures for several days, carry out the
following steps: Choose "Select Filter Value" for the entry "Structure".
22. In the dialog box, only select the checkbox "T/A Lead Time Deviation %". Then choose "Transfer".
23. Choose "Drilldown in the Columns" for the entry "Material".
24. Choose "Line Chart".
25. The development of the lead time deviation for the last days is displayed. You have now successfully finished
the tutorial "Manufacturing Analysis".