Project Test Plan - IPA <Project Name>

Table of Contents
1 Introduction.........................................................................................................................................3
1.1 Test Strategy................................................................................................................................3
1.2 In Scope.......................................................................................................................................3
1.3 Out of Scope................................................................................................................................3
1.4 Roles & Responsibilities...............................................................................................................3
1.5 Assumptions................................................................................................................................3
1.6 Constraints...................................................................................................................................3
2 Test Methodology................................................................................................................................3
2.1 Features and Functionality to Test...............................................................................................3
2.2 Types of Testing...........................................................................................................................3
2.2.1 Functional Testing................................................................................................................3
2.2.2 Data Testing.........................................................................................................................3
2.2.3 Usability Testing...................................................................................................................3
2.2.4 Performance Testing............................................................................................................3
2.2.5 Quality Testing.....................................................................................................................3
2.2.6 Interface Testing..................................................................................................................3
2.2.7 Regression Testing...............................................................................................................3
2.2.8 Other Testing.......................................................................................................................3
3 Test Deliverables.................................................................................................................................3
3.1 Documents...................................................................................................................................3
3.2 Test Data......................................................................................................................................3
4 Resource & Environment Needs..........................................................................................................3
4.1 Hardware.....................................................................................................................................3
4.2 Software......................................................................................................................................3
4.3 System Access..............................................................................................................................3
4.4 Test Tools.....................................................................................................................................3
Introduction

1.1 Test Strategy


Provide a brief, overview of your test strategy. This section should be targeted
towards those who may not have time to read the entire plan, but have interest in
how you will validate the project success.

1.2 In Scope
Identify the systems or solution components to be tested as part of this test plan.

1.3 Out of Scope


Identify any systems, requirements, or scenarios which will not be tested as part
of this test plan.

1.4 Roles & Responsibilities


Describe the team responsible for testing. Identify each role, and the specific
responsibilities and expectations of that role.

Role Responsibilities

1.5 Assumptions
If applicable, list any assumptions which first must be made in order to complete
this test plan.

1.6 Constraints
If any constraints exist by which the testing team will be held, they should be
listed here.

2 Test Methodology
2.1 Features and Functionality to Test
Identify the major features and functionality to be tested and verified. This
section should identify for the reader the major components to be tested;
allowing them to quickly point out omissions.
Feature/Function User Testing Method

2.2 Types of Testing


2.2.1 Functional Testing
Describe the functional testing for the project.

2.2.2 Data Testing


Describe the data testing for the project.

2.2.3 Usability Testing


Describe the usability testing for the project.

2.2.4 Performance Testing


Describe the performance testing for the project.

2.2.5 Quality Testing


Describe the quality testing for the project.

2.2.6 Interface Testing


Describe the interface testing for the project.

2.2.7 Regression Testing


Describe regression testing for the project.

2.2.8 Other Testing


Describe the other testing for the project that is not covered in the types of tests
described in previous sections.

3 Test Deliverables
3.1 Documents
Identify the documents to be created as part of this test plan.
Document Description
Test Plan The Test Plan is derived from the Requirements, Functional
Specs, and detailed Design Specs. The Test Plan identifies
the details of the test approach, identifying the associated test
case areas within the specific product for this release cycle.
Test Schedule The Test Schedule is the responsibility of the Test Lead and
will be based on information from the Project Schedule (done
by Product Manager). The Test Schedule may be done in MS
Project.
Test Cases Test Cases will be created for each major function or feature to
be tested. Test Cases will contain scripts for testing
functionality.

3.2 Test Data


This section identifies any test data that will be used during the testing. It also
identifies any test data that will need to be created for testing.

4 Resource & Environment Needs


4.1 Hardware
Describe any hardware required to conduct the test plan.

4.2 Software
Describe any software required to perform the tests. This should not include
tools for testing, but only software to be tested.

4.3 System Access


If testers require access to certain systems in order to execute test scripts,
identify those systems here and the appropriate level of access needed.

4.4 Test Tools


List any software tools to be used during the testing process. This list may
include software for tracking issues, running test scripts, load testing, etc.