Ans:- Mainframe Production Control Scheduling Program of Batch Jobs. Think of jobs as, Flights
taking off from an Airport. On a busy airport, when the clock strikes 09:00 AM, all jobs that were
scheduled to depart at 09:00 AM take-off. CA-7 Scheduler manages and oversees all of this.
In the Production Environment(where things are running live), you don’t type SUB on a Production
Job and give it to the Mainframe Computer for Processing. Production Jobs are generally scheduled –
they auto-start at a given time. TheCA-7 Scheduler on Mainframes maintains a periodic Time-table, a
database or chart of which jobs run when?
A company had made CA-7 in the United States for their own internal use, under the name SASS. You
would still see programs like SASSBSTR and SASS Messages today. Universal Computing
Company(UCC) bought the product SASS and renamed it UCC-7. In 1987, Computer Associates(CA)
bought UCC, and it was their policy to name all their products with CA Prefix, so UCC-7 became CA-7.
1) The Database holds the Timetable of when the jobs run. CA-7 periodically scans the
database(timetable) for which jobs are likely to run in the next few minutes.
(2) When the clock strikes 09:00 HRS, the Job A enters into the Request Queue. The JCL of the
Job is picked up from the JCL Library and added to the Trailer of the CA-7 Request. Each Job in
the Request Queue, waits for certain requirements to met.
(3) When all conditions and requirements are met, the job progresses ahead to
the WLB(Workload Balancing).
(4) When there are enough initiators to pick up the Job from the Queue, the job is sent to the
JES2. While a job is on WLB or JES2, its shown on the
Ready Queue.
(5) An SMF Type 20 or 30 record(job initialization) is received by CA-7, and the job is moved to
the Active Queue, and will start execution in an address space.
(6) The job will remain on the Active Queue,until an SMF Type 5 or 30(job completion) is received
by CA-7 . On receipt of the job completion, if the job is successful, the Prior Run Queue(PRRN)
Queue will be updated with the details of the execution. This serves as a last run-time record for
the job. However, if the job fails, it will be returned to the Request Queue(REQ).
Q. How a job enters into the Request(REQ) Queue?
Ans :- There are 3 ways, a job can enter into the Request Queue[REQ]. A job can be Scheduled,
triggered or demanded out.
(1) Scheduled(SSCN) – Jobs can be scheduled to run at a fixed time – for example, Reporting job runs
every month-end at 08:00 PM, Load jobs run every-day at 05:00 AM and so on.
(2) Triggered(AUTO) – A parent job X, when it runs to successful completion, can TRIGGER another
child job Y. A TRIGGER automatically brings Job Y into the REQ Queue.
If Input File contains DATA
Demand Job Y
Else
Continue
End-if
Here, Job Y is brought into the Request Queue[REQ], only if the Input-file has data records. If the Input
file is empty; if there’s no data to process, the job is not demanded out. So, in this fashion, you can
exercise more control, over how the job kicks off.
Ans:- You type the command LJOB,JOB=jobname,LIST=ALL to find all the information about a job.
Look at how I’ve found all the information about my job GEMPAIAS on CA-7.
This shows all the information about my job CPARSDLY – which jobs does it trigger, which are the
successor jobs, what are the steps in this job etc
Ans:- The quick way to know if a Job is Scheduled, is to use the List Schedule[LSCHD] Command,
with LIST=CALS(Calendar) option. This opens up a Calendar view, and tells us, what time and on what
calendar days of the year, your job is going to run.
In the clipping below, my job GMSBDRQ1 runs on all week-days, Monday-to-Friday at 23:00 hrs.
Q. How to know if a Job is Demanded out?
Ans:- A job can be programmatically demanded out by another job, based on given condition. If the
condition is true, the job is demanded out into the REQ(Request) Queue. If the condition is false, the job
is not demanded out. Generally, information about the Demanding job is not stored in CA-7. Sometimes,
the LIST=PROSE option of the LJOB command, may give details about the Demanding job. In the below
clipping, my job GEMIATAL job is demanded out by GMLIASXA
Ans:- A job has to wait in the CA-7 REQ(Request) Queue, until all of the requirementsit has are
satisfied. Requirements are like additional promises, which must be fulfilled, before a job is allowed to
run. Requirements could be anything like, Completion of another job, Arrival(creation) of a file(Dataset),
Submit Time, User Hold or a Negative Dependency. Its only when all the Requirements, of a job
are fulfilled or posted, the job is brought to the Ready Queue(RDY).
Check out this example. A Job X triggers Job Y. Job X completes everyday at 08:00 AM. Job Y has 2
requirements – R1 and R2. Job R1 completes at 07:00 AM and Job R2 completes at 09:00 AM. The
question is, when does Job Y kick-off? I would say, when Job X completes at 08:00 AM, it triggers Job Y,
so it brought to the Request Queue at 08:00 AM. The requirement R1 of Job Y is satisfied, but it will wait
in Request Queue[REQ], till R2 is satisfied. When R2 completes at 09:00 AM, both the requirements are
satisfied, and Job Y will be brought to theReady Queue[RDY].
Ans:- Think of a relay-race with three participants – Arnold, Danny and Carol. The three participants
are scheduled to start running, but spaced apart in intervals of 15 minutes each. Arnold is scheduled to
start running when the timer is 00:00 hrs. Danny is scheduled to start running when the time is 00:15 Hrs.
Carol is scheduled to start running, when the time is 00:30 Hrs.
Requirement of Danny – Danny is allowed to start running, only after Arnold completes the race, and
passes on the baton to him.
Dependent Carol – Danny owes a favour to Carol, he has a commitment towards her. He must complete
the race and pass on the baton to her, before she can start off.
Ans:- Lead Time is the period(in hours)[time-window], that a job looks back in time, to check if all
its requirements(promises) are fulfilled. See the below example. Here, my job GEMPAIAS has a
requirement on PZCPDWKY, with a Lead Timeof 5 hours.
JOB=GEMPAIAS LIST=RQMT
NAME ID MEMBER -NAME- -ID -ID- DSNBR DSNBR STP DDS RUNS DATE/TIME
Suppose, my job GEMPAIAS is a scheduled job, it is scanned out everyday, and enters the
REQ(Request) Queue at 07:00 AM in the mornings. Now, the GEM* Job is going to check for its
requirement of Pee-zee(PZ*) job. Has the Pee-Zee(PZ*) Job completed in the last 5 hours? Thus, the
GEM* Job searches for its requirement Pee-Zee(PZ*) job’s completion in the time-window of 02:00 AM to
07:00 AM. If the Pee-Zee(PZ*) Job would have completed in the time-frame[02:00-07:00 AM], the
requirement is satisfied.
However, if the Pee-Zee(PZ*) Job completes, say at 00:00 Hrs, this doesn’t fall in the time-window 02:00-
07:00 AM, so the requirement shall not be satisfied. The GEM* Job merely keeps waiting in
REQ(Request) Queue(even though the PZ* Job ran, but ran at 00:00 Hrs). This is a classic example of
a Look-back Issue.
Very often, there is too large a time-gap that elapses between a predecessor job A's completion, and its
dependent B's starting out. When B is brought into the REQ(Request) Queue, if A's completion doesn’t
fall in the Look-back(Lead-time) window, B keeps waiting in the REQ Queue. These are called Look-back
Issues. CA-7 Look-back issues generally happen in the Production Environment, generally due to delays
in Batch Cycle, holidays etc.
00 – No special consideration for the amount of time elapsed, between the pred-job and dependent job's
runs.
99 – The requirement is never to be considered as already satisfied, when the job enters the Queue.
nn – Since, the last run of the job, each predecessor job must have run within the last nn hours. Values
for nn may be from 1 to 98.
Q. What is a Negative Dependency?
Ans:- Sometimes, you wish - I hope these two jobs don't collide, don't run at thesame time. If a Job P
has a Negative Dependency N, Job P and Job N can't run together(mutually exclusive). So there are 2
possibilities -
GEMTOPR3 000 GEMTOPR3 GEMIDB 005 SY2 007743 *NONE* 002 000 1326 10194/2315
--------------------------- SUCCESSOR JOBS ----------------------------
JOB=GEMCNSTL SCHID=000
JOB=GMCNTODL SCHID=000
JOB=QRPDR3PA SCHID=000
JOB=/XRPDR3PA SCHID=000 (Negative dependency)
Ans:- You can type CA-7 advanced Forecast commands, to find out the hierarchy of jobs in
the forward order, or reverse-order. FSTRUC Command gives the complete list of triggered jobs, at all
levels, top-to-bottom. FRJOB gives the complete list of triggered jobs, at all levels in the reverse order,
bottom-up fashion. Look, how I’ve found the complete hierarchy of jobs triggered by my job GEMCAL00
Ans:- When a Mainframe Job completes successfully, it goes to the Log-Area[LRLOG]. The log-area
stores tracking-information – the log of the completed job of the past 5 days. The CA-7 LRLOG Command
is used to retrieve from the logs, information about the previous runs of a job. I have scribbled below, how
you can code several different options on the LRLOG Paragraph.
LRLOG,JOB=job-name,DATE=*
Log of the job, for the past 5 days.
LRLOG,JOB=job-name,DATE=10200
Log of the job, for the run on 2010-07-19(Julian Date 197 day of the year 2010).
When a job abends at a particular step, you may re-start the job from the next successive step, you
may force-complete the job, or you may cancel the job.Force completing a job, force-fully marks the job
as complete(even if the job has not run entirely successfully). All triggered down-stream jobs are brought
into the CA-7 Queue.
Cancelling the job off, is like stopping the job altogether. With this the entire job-cycle downstream will be
held up/hung.
LRLOG,ST=RSTR,SPAN=24
This command tells, which jobs abended and were restarted in last 24 hours.
LRLOG,ST=FORCE,SPAN=24
This command tells, which jobs abended and were force-completed in last 24 hours.
LRLOG,ST=CANCEL,SPAN=24
This command tells, which jobs abended and were cancelled off in last 24 hours.
LPRRN,JOB=job-name
This command is used find out information about the Last job-run.