Name of Work: Construction of Academic Blocks At

Situation of Work: NEW CONSTRUCTION AT PALOOSA C

(A) Excavation for Foundation in Any Type of Soil

S.No Description No

1 Long wall (External)class room 1

2 Short wall class room 1

3 Short wall class room+ labe 1

4 office short wall 11

5 columns 59

Total=

Total=

Add 5%Extra as F.O.S=

Total Quantity of Excavation=

Rate/Cum S.R(03-23-b)=
Total Amount=

(B) P/L P.C.C 1:4:8 in Foundation

S.No Description No

1 Long wall (External)class room 1

2 Short wall class room 1

3 Short wall class room+ labe 1

4 office short wall 11

5 columns 59

Total=

Total=

Add 5%Extra as F.O.S=

Total Quantity of Excavation=


Rate/Cum S.R(03-23-b)=

Total Amount=

P/L R.C.C (1:2:4) in Foundation

Description No

1 Long wall (External)class room 1

2 Short wall class room 1

3 Short wall class room+ labe 1

4 office short wall 11

5 columns 59

Plinth beam

1 Long wall (External)class room 1

2 Short wall class room 1

3 Short wall class room+ labe 1

4 office short wall 11


Total=

Total=

Add 5%Extra as F.O.S=

Total Quantity of Excavation=

6 Rate/Cum S.R(03-23-b)=

Total Amount=

P/L B.B.M in 1:6 CSM in foundation

Description No

1 Long wall (External)class room 1

2 Short wall class room 1

3 Short wall class room+ labe 1

4 office short wall 11

Total=

Total=
Add 5%Extra as F.O.S=

Total Quantity of Excavation=

6 Rate/Cum S.R(03-23-b)=

Second Step Total Amount=

14

P/L B.B.M in 1:6 CSM in supper structure

Description No

1 Long wall (External)class room 1

2 Short wall class room 1

3 Short wall class room+ labe 1

4 office short wall 11

19

20

21

22
Rate/C

cemant plaster (1:4) ratio in su

No Description No

1 Long wall (External)class room 2

2 Short wall class room 2

3 Short wall class room+ labe 2

4 office short wall 22

4 ceiling

5 Total=

15

P/L R.C.C 1:2:4 in Beams, Columns, slabe and Other Structural Members

1 Description No

2 Long wall (External)class room 2

3 Short wall class room 2


4 Short wall class room+ labe 2

5 office short wall 22

Columns 59

Slab 1

2 Long wall (External)class room 1

3 Short wall class room 1

4 Short wall class room+ labe 1

5 office short wall 11

12

Rcc (1:2:4) in lintel beam

S Description No
S/F of Mild Steel Reinforcement

Qty of R.C.C=

1.5% of R.C.C Qty 48.3901018744329

(H) P/L of 1/4" thick Glazed Ceramic tiles over P.C Plaster

Description No

P/L P.C.C 1:4:8 in Flooring

Description No

Total=
7

Marbel

Description No

Total

P/LMorbal Skirting in white cement

Description No

1 Long wall (External)class room 2

2 Short wall class room 2

4 office short wall 11

2 Total=
Total= S/F Steel Doors of Approved Specifications

Description No

19

2 S/F of Steel Grill to Windows

Total= Description No

20

Total=

S/F of Steel Grill to Stair + Verandha

Description No

flight 2

Verandha 1
R P/L Three Coats of Distemper to New Surfaces

Description No

1 Long wall (External)class room 2

2 Short wall class room 2

3 Short wall class room+ labe 2

4 office short wall 22

4 ceiling

Total=

5 Applying 2 coats weather shield

7 Description No

1 Long wall (External)class room 1

2 Short wall class room 1

3 Short wall class room+ labe 1

4 office short wall 11


10

11

S/F Almunium Windows of Approved Specifications

20

Total=

Fly screen shutter

10

Total=

Single layer of tiles10''x5''x1.25'' laid over 4'' earth and 1'' mud plaster on top of RC roof slab

Description No

Roof insulation
Cerimic tile

Description No

NAME OF WORK: Constant at Additional Academic Block in Abdul Wali Khan University, Mar

INTERNAL/EXTERNAL WATER SUPPLY AND SANITARY INSTALLATION

S.No Description

1 S/F of C.P Bib/Stop Cock etc (14-22-a)

3 S/F of pillar cock C.P

4 S/F of floor trap (14-31-b)


5 S/F of brass ball valve 3/4" dia (14-48-b)

6 S/F of brass ball valve 1" dia (14-48-c)

7 S/F of brass ball valve 1.5" dia (14-48-e)

9 S/F of wash hand basin I/c pedestal (14-5-b-01)

10 S/F W.C orissa type (14-03-a)

11 S/F os low level flushing tank (14-10-a)

12 S/F of plastic shelves (14-20-d)

13 S/F of looking mirror imported (14-17)

14 S/F of soap dish (14-20-a)

15 S/F of towel rail plastic (14-20-c)

16 S/F of toilet paper holder plastic (14-20-b)

17 S/F of 2" dia C.I pipe (14-34-a-02)

18 S/F of 4" dia C.I pipe (14-34-b-01)

19 S/F of 6" dia Rcc pipe (23-01-b)

20 S/F of 2" dia pvc pipe (24-18-c-03)

22 Contant of septic tank (23-10)

24 Contant of main hole 18" dia


25 P/F of G.I pipe 2" dia IIL (14-55-a)

26 Contant of main hole 12" dia IIL (14-37-a)

27 P/F of G.I pipe 1.5" dia IIL (14-37-a)

28 P/F of G.I pipe 1" dia IIL (14-55-d)

29 P/F of G.I pipe 3/4" dia IIL (14-55-e)

30 P/F of G.I pipe 1/2" dia IIL (14-55-f)

31 S/F of European W.C (14-01-b)

Total Rs.

Civil work

S.No Description

1 Excavation for Foundation in Any Type of Soil

P/L P.C.C 1:4:8 in Foundation

P/L R.C.C (1:2:4) in Foundation


P/L B.B.M in 1:6 CSM in foundation

6 P/L B.B Masonry in 1:6 C.M as in superstructure

8 S/Fabrication of Mild Steel Reinforcement etc

9 P/L 1/2" thick P.C Plaster in 1:4 Cm etc

12 P/L 4" thick PCC 1:4:8 as under floor etc

15 P/L of 1/2" thick Morbal Skirting in white cement

16 P/L of 1/4" thick Glazed Ceramic tiles over P.C P

17 S/F of Aluminium Bronze/Black Window sliding e

18 S/F Steel Door of approved design

19 P/F of steel grill to windows of approved design

20 P/L of Marble Strips as in flooring etc

21 P/L PCC 1:3:6 etc

22 Roof treatment

22 P/L 3 coats of distempering to new surface

23 Applying 2 coats weather shield

24 P/L RCC 1:2:4 as in slab, bean, columns etc in Fi

26 S/F of Stair Railing + verandha


27

Total Rs. Total

INTERNAL ELECTRIFICATION

NAME OF WORK: Constant at Additional Academic Block in Abdul Wali Khan University, Mar

S.No Description

1 Wiring of Light/Fan/Call bell point in 3/29 PVC (


S/F of best quality A.C Ceilling Fan complete
56" sweep as specified Pak Asia Climax Royal
2 (15-68-c)
S/F of tube light I/c rod choke etc complete
single rod (140 watts) with 1" choke & 1starter
3 (15-24-b)

5 S/F Earthing special complete (15-53)

7 S/F of Exhaust fan 16" sweep (15-69-b)


S/F of cubical type factory fabricated floor/wall

8 mounting steel main board complete (15-75-a)

9 S/F of single phase auto circuit breaker 10 Amp


10 S/F of main submain 7/29 (15-48-b)

13 S/F of fan hook (15-25)

15 S/F of main 7/064 PVC wire(15-48-d)

18 S/F of Energy Savers

Button / holder

5 AMP circuit breaker

2 pin socket

Total=

Summary Of Capital Cost

Name Of Project:Construction Of Additional Academic Block At The Right Side Of Examination(Abd

S.No Summary Of Capital Cost

1 Civil Works

2 Plumbing Works

3 Electric Works
Total (Rs)

Total Cost Of Project(Rs) Millions


demic Blocks At BLOCKAT PALOOSA CAMPUS

N AT PALOOSA CAMPUS OVER EXISTING BUILDING.

Length Width Depth Qty

347.5 3.5 3.5 4256.875

290 3.5 3.5 3552.5

307 4.5 3.5 4835.25

16 2.5 3.5 1540

6 6 3.5 7434

21618.625

668.893100247525

43906.1431002475 Cum

0 Cum

= 0 Cum

105.1 Rs
0 Rs

Length(Ft) Width(Ft) Depth(Ft) Qty

347.5 3.5 0.33 401.3625

290 3.5 0.33 334.95

307 4.5 0.33 455.895

16 2.5 0.33 145.2

6 6 0.33 700.92

2038.3275 cft

57.7102916194791 cum

Total=

Total=

dd 5%Extra as F.O.S=

Quantity of Excavation=
ate/Cum S.R(03-23-b)=

Total Amount=

Length(Ft) Width(Ft) Dipth.(Ft) Qty Cum

347.5 3.5 1.125 1368.28125

290 3.5 1.125 1141.875

307 4.5 1.125 1554.1875

16 2.5 1.125 495

6 6 1.125 2389.5

347.5 1.125 1.375 537.5390625

290 1.125 1.375 448.59375

307 1.125 1.375 474.890625

16 1.125 1.375 272.25


6948.84375 cft

196.739630520951 cum

Total=

dd 5%Extra as F.O.S=

Quantity of Excavation=

ate/Cum S.R(03-23-b)=

Total Amount=

Cum

Cum

Length(Ft) Width(Ft) Depth(Ft) Qty Cum

347.5 0.75 3 781.875

290 0.75 3 652.5

307 0.75 3 690.75

18 0.75 3 445.5

2570.625 cft

Total= 72.77894170607 cum

Total=
dd 5%Extra as F.O.S=

Quantity of Excavation=

ate/Cum S.R(03-23-b)=

Total Amount=

#REF!

Length(Ft) Width(Ft) Depth(Ft) Qty

347.5 0.75 10.5 2736.5625

290 0.75 10.5 2283.75

307 0.75 10.5 2417.625

18 0.75 10.5 1559.25

Total:- 8997.1875 cft

296.211885280711 cum
Rate/Cum S.R(03-23-b)=

Length(Ft) Width(Ft) Depth(Ft) Qty

347.5 10.5 7297.5

290 10.5 6090

307 10.5 6447

18 10.5 4158

8444 23992.5 cft

32436.5

cum

2229.78624535316

Members Cft

Cum

Length(Ft) Width(Ft) Depth(Ft) Qty

347.5 0.75 0.75 390.9375

290 0.75 0.75 326.25


307 0.75 0.75 345.375

18 0.75 0.75 222.75

1.125 1.125 11 821.390625

8442 0.5 4221

347.5 1 1.08 375.3

290 1 1.08 313.2

307 1 1.08 331.56

18 1 1.08 213.84

7561.603125

Total 214.0884237

Length(Ft) Width(Ft) Depth(Ft) Qty


0

cft

410.828054218573 cum 14510.446875

Ton

Length(Ft) Width(Ft) Depth(Ft) Qty

38

32

Total 70 Tons

Cum

Length(Ft) Width(Ft) Depth(Ft) Qty

8442 0.33 2785.86

2785.86

Total= 2785.86
78.8955552 M3

Cft

Cum

Cum

Length(Ft) Width(Ft) Depth(Ft) Qty

8442 8442

8442

784.57249070632

Sft

Length(Ft) Width(Ft) Depth(Ft) Qty M2

347.5 0.5 347.5

290 0.5 290

18 0.5 99

736.5 cum

68.4479553903346

Total=
Length(Ft) Width(Ft) Depth(Ft) Qty

3.5 8.5 565.25

2.5 7.5 150

715.25

66.4730483271376

Length(Ft) Width(Ft) Depth(Ft) Qty

6 6 720

66.914498141264

Total= 66.91449814126

Length(Ft) Width(Ft) Depth(Ft) Qty

22 4 88

123 3.75 1488 cft


1576 cum

146.468401486989

Length(Ft) Width(Ft) Depth(Ft) Qty

347.5 10.5 7297.5

290 10.5 6090

307 10.5 6447

18 10.5 4158

8444 23992.5 cft

Total=

Length(Ft) Width(Ft) Depth(Ft) Qty

347.5 10.5 3648.75

290 10.5 3045

307 10.5 3223.5

18 10.5 2079
11996.25 cum

1114.89312267658

6 6 720

66.914498141264

Total=

6 6 360

33.457249070632

Total=

aster on top of RC roof slab

Length(Ft) Width(Ft) Depth(Ft) Qty

8442

8442 m2
784.57249070632

Length(Ft) Width(Ft) Depth(Ft) Qty

18 17 306

18 5 180

17 5 170

Total:- 656 Sft

60.9665427509294 M2

ul Wali Khan University, Mardan.

Unit Quantity Rate Amount

No 10 579.22 5792.2

No 8 417.8 3342.4

No 10 579.65 5796.5
No 4 204.12 816.48

No 2 377.22 754.44

No 1 657.87 657.87

No 8 2072.06 16576.48

No 7 1288.45 9019.15

No 7 1484 10388

No 10 77.07 770.7

No 10 645.25 6452.5

No 10 107.32 1073.2

No 2 137.57 275.14

No 10 125.47 1254.7

M 5 868.4 4342

M 15 1202.14 18032.1

M 60 322.57 19354.2

M 50 182.41 9120.5

No 1 10154.55 10154.55

No 2 1538.36 3076.72
60 514.38 30862.8

No 2 830.52 1661.04

M 70 430.02 30101.4

M 50 261.44 13072

M 60 203.2 12192

M 80 153.98 12318.4

No 1 3508.78 3508.78

Rs. 230766.25

Schedule Reference Unit Qty Rate Amount

Type of Soil M3 43906.143100248 105.1 4614535.639836

M3 57.710291619479 2890.3 166800.0558678

M3 196.73963052095 4699.95 924666.4264669


7-4-a-05 M3 72.778941706067 3456.81 251582.973479

07-05-a-05 M3 296.21188528071 3721.99 1102497.674896

06-07-c Ton 70 82234.55 5756418.5

11-09-b M2 2229.7862453532 123.61 275623.8777881

10-22-a M3 78.8955552 2890.3 228031.8231946

10-40-a-02 M2 68.447955390335 590.39 40410.9883829

10-38-a M2 60.966542750929 789.83 48153.20446097

12-54-c-01 M2 66.914498141264 3830.87 256340.7434944

12-47- M2 66.473048327138 4315.53 286866.4342472

12-50- M2 66.914498141264 1509.75 101024.1635688

10-43-c M 784.57249070632 9.58 7516.204460967

06-05-f M3 3477.21 0

5-Sep M2 784.57249070632 529.52 415446.8252788

11-23-a-02 M2 23992.5 42.04 1008644.7

13-38-b+13-38-a M2 1114.8931226766 132.69 147935.168448

06-06-a-03+06-06-e M3 214.08842369762 5680.25 1216075.768708

25-33 M2 146.46840148699 2379.47 348517.1672862


17197088.33987

ul Wali Khan University, Mardan.

Unit Quantity Rate Amount

No 130 867.02 112712.6

No 55 2191.13 120512.15

No 80 528.17 42253.6

No 1 6220.81 6220.81

No 8 1752.9 14023.2

No 2 9821.5 19643

No 2 467.67 935.34
M 7200 54.57 392904

No 55 63.13 3472.15

M 400 169.63 67852

No 40 250 10000

No 130

No 10

No 12

l= 790528.85

Capital Cost

Side Of Examination(Abdul Wali Khan University Mardan)

Amount

17197088.33987

230766.25

790528.85
18218383.43987

18.21838343987