Академический Документы
Профессиональный Документы
Культура Документы
Engineering ToolBox - SketchUp Edition - enabled for use with the amazing, fun and
free Google SketchUp.
• Home
• • Acoustics
• • Air Psychrometrics
• • Basics
• • Combustion
• • Dynamics
• • Economics
• • Electrical
• • Environment
• • Fluid Mechanics
• • Gas and Compressed Air
• • HVAC Systems
o - Air Conditioning
o - Heating
o - Noise and Attenuation
o - Ventilation
• • Hydraulics and Pneumatics
• • Insulation
• • Material Properties
• • Mathematics
• • Mechanics
o - Beams and Columns
• • Miscellaneous
• • Physiology
• • Piping Systems
o - Codes and Standards
o - Corrosion
o - Design Strategies
o - Dimensions
o - Fluid Flow and Pressure Drop
o - Heat Loss and Insulation
o - Pressure Ratings
o - Temperature Expansion
o - Valve Standards
• • Process Control
o - Control Valves
o - Documentation
o - Fluid Flowmeters
o - Risk, Reliability and Safety
o - Temperature Measurement
• • Pumps
• • Standards Organizations
• • Steam and Condensate
o - Control Valves and Equipment
o - Flash Steam
o - Heat Loss and Insulation
o - Pipe Sizing
o - Thermodynamics
• • Thermodynamics
• • Water Systems
ToolBox ShortList
• Add this Page!
o
C
o
F
Length
m
km
in
ft
yards
miles
nautical miles
Volume
m3
liters
in3
ft3
us gal
Velocity
m/s
km/h
ft/min
ft/s
mph
knots
Pressure
Pa (N/m2)
bar
mm H2O
kg/cm2
psi
inches H2O
Flow
m3/s
m3/h
US gpm
cfm
Unit Converter
Scientific Calculator
.
Engineering News
PrinterFriendly
ToolBox ShortList
• Add this Page!
Link to this Page!
Resources, Tools and Basic Information for Engineering and Design of Technical
Applications!
Job Description
1. Production Planning at Machine Shop:
- Planning the monthly machine shop production based on marketing requirement & material availability.
- Monitoring the raw material position at super markets & communicating the status for advanced planning of
materials.
- Establishing supermarkets/Revising the super market stock as per production demand & supplier lead
time.
2. Managing Subcontracting:
- Maintaining on time receipt of materials from subcontract for machine shop production plan.
3. Inventory Control:
4. Interacting with support functions like Quality, Materials & Stores to get the things done at on time.
5. Interacting with SMT teams and updating the Raw Material Status & Subcontracting material status to
them.
Keywords: Manage the subcontracting the machine shop production planning with low inventory cost.the
components on time, managing
Semester I
201 Fluid Handling
202 System Engineering
203 Layout Engineering
Semester II
204 Thermal Insulation
204 Costing of Piping
204 Hygenic PipingThermal Insulation
205 Corrosion and Material Selection
205 Instrumentation and Process Control
206 Welding and NDT Management
206 Statutory Regulation & Regulatory Acts
206 Stress Analysis
0124-4200034/18