90% de comunicación
QA es auditoria, QC es inspección
Hito Actividad cero, no consume tiempo ni recurso
El comité CCI Alcance 5.5, Costo 7.3, Tiempo 6.6, Contrato 12.5,
evalua todos ellos forma parte del sistema de configuración
Project Selection Benefit measurement methods that are comparative
Methods approaches, scoring models, benefit contribution, or
economic models.
Constrained Optimization, mathematical models that
use linear, nonlinear, dynamic, integer, or multi-objective
programming algorithms.
1
2
Capitulo 6 - Tiempo
Método del Camino Critico
3
Calcular la Holgura Total (float) de la actividad B?
Variación
Variación de Costos CV CV = EV - AC
5
Variación de Cronograma SV SV = EV - PV
Índices
Proyecciones
6
Estimación al EAC AC +
Termino
ETC
(Todo los que cuesta el
proyecto al día de hoy)
(Total
Incert
idumb
re)
(BAC -
EV)
(Ocur
rencia
s
Atipic
as)
(BAC
– EV)/
CPI
(Ocur
rencia
s
Tipica
s)
EAC BAC/CPI
Estimación para ETC ETC = EAC –AC
terminar
(cuenta me falta)
7
Análisis del Valor Ganado
SI AC > EV AC = EV AC < EV
SI PV > EV PV = EV PV < EV
n = # de periodos
n = # de periodos
8
Escoger siempre proyectos con mayor TIR
Compara los beneficios con los Si BCR > 1 Beneficios > Costos
costos de un proyecto.
Si BCR = 1 Costos = Beneficios
Consideraciones de Costos
Tipos de Costos
9
Costo Fijo No cambian a medida que cambia la producción,
por ejemplo los alquileres
Depreciación:
Los activos pierden valor en el tiempo y existen métodos para calcular cual es el valor
que se pierde cada año.
PERT
Formula (P + 4M + O) / P
10
Capitulo 8 - Gestión de Calidad
Mejora Continua: Sin propiedad TQM – Gestión de la Calidad Total y SIX
exclusiva SIGMA
Mejora Continua: Propiedad Demmin y Juran
Exclusiva
Mejora de Procesos: Malcolm Baldrige / CMM y CMMI
Price 8 10 12 11
Quality 12 10 8 11
We need to compute the following for all the vendors - (0.4*Price + 0.6*Quality).
12
The scores come out to be vendor 1 - 10.4, vendor 2 - 10, vendor 3 - 9.6, and vendor 4's 11.
9.2.1.1 FAE
• Disponibilidad
• Capacidad
• Experiencia
• Coste
Atributos
• Elemento de comunicaciones
• Finalidad.
• Frecuencia.
• Fechas de inicio / finalización.
• Formato / medio
• Responsabilidad.
14
Capitulo 11 - Gestión de Riesgos
• Metodología
• Roles y responsabilidades
• Preparación del presupuesto (7.2 act. de gestión de riesgos)
• Periodicidad (cantidad de time q haremos actividades de
riesgos)
• Categorías de riesgo, Estructura de Desglose del Riesgo
(RBS)
• Definiciones de probabilidad e impacto de los riesgos.
(escala)
• Matriz de probabilidad e impacto
• Tolerancias revisadas de los interesados
• Formatos de informe
• Seguimiento (que act. hay q hacer auditorias)
15
11.2.3 Identificación de Riesgos: Salidas
11.2.3.1 Registro de Riesgos (Actualización)
16
11.4.2.2 Técnicas de Análisis Cuantitativo de Riesgos y de Modelado
• Entender la necesidad
• Coste total o del ciclo de vida.
• Capacidad técnica.
21
• Enfoque de gestión.
• Enfoque técnico.
• Capacidad financiera.
• Capacidad e interés de producción.
• Tamaño y tipo de negocio.
• Referencias.
• Derechos de propiedad intelectual.
• Derechos de propiedad exclusiva.
Preguntas
Which enterprise environmental factor defines how work is assigned to people?
The work authorization system is a part of your company’s Enterprise
Environmental Factors, and it’s generally part of any change control system. It
defines how work is assigned to people. If work needs to be approved by
specific managers, the work authorization system will make sure that the right
people are notified when a staff member’s work assignments change.
You are managing a construction project using a fixed price (FP) contract. The contract is
structured so that your company will be paid a fee of $85,000 to complete the work.
There was a $15,000 overhead cost that your company had to cover. It’s now three
months into the project, and your costs have just exceeded $70,000. The project has now
consumed the entire fee, and your company will now be forced to pay for all costs on the
project from this point forward. What’s the BEST way to describe this situation.
The point of total assumption is the point at which the seller assumes the
costs. In a fixed price contract, this is the point where the costs have gotten so
large that the seller basically runs out of money from the contract and has to start
paying the costs
El punto de asunción total (PTA) es un precio determinado por un precio más fixed incentivo contrato de
honorarios (FPIF) por encima del cual el vendedor asume toda la pérdida de un sobrecosto. También es conocido como el
"costo más pesimista", ya que representa el punto más alto más allá de los costos que no se espera que
aumente, debido a cuestiones razonables. Si los costos van más allá de la PTA, se supone que se debe a una mala
gestión, más que el peor de los casos una serie de dificultades. El vendedor asume todos los costos de riesgo en la PTA y
más allá. Además, una vez los costes de alcanzar un contrato FPIF PTA, el importe máximo que el comprador pagará el
precio límite.
Cualquier FPIF contrato especifica un objetivo de costes, un objetivo de beneficio, un objetivo de precio, un precio
máximo, y uno o más coeficientes de compartir.El PTA es la diferencia entre el techo y los precios objetivo, dividido por el
comprador de la porción de la cuota de razón para que rango de precios, más el coste.
PTA = ((Precio de techo - Precio Objetivo) / comprador Compartir Ratio) + Costo Meta
Ejemplo:
Beneficio: 6000
23
You are working on a construction project. You, your team, and your senior manager all
feel that the work is complete. However, one of your stakeholders disagrees, and feels
that one deliverable is not acceptable. What is the BEST way to handle this conflict?
Consult the contract and follow its claims administration procedure. When
there’s a dispute between a buyer and a seller, that’s called a claim. Most
contracts have some language that explains exactly how claims should be resolved
- and since it’s in the contract, it’s legally binding, and both the buyer and seller
need to follow it.
Which of the following contracts has the MOST risk for the buyer
Cost plus percentage of costs (CPPC), Cost-plus contracts are ones where the
seller bills the buyer for any costs incurred on the project. A “Cost plus percentage
of costs” (CPPC) contract is one where the seller agrees to pay a percentage of the
total costs of the project. This is the riskiest kind of contract for the buyer, because
if the costs get really high then they’re passed along to the buyer - and the seller
doesn’t have any incentive to keep them down!