Вы находитесь на странице: 1из 36

PROJECT # Project Budget $ 50,000.00 Project Budget $ 50,000.

00
Budget plan $ - Cost Expended $ -
PROJ. ADDRESS Remaining to plan $ 50,000.00 Over/Under Budget $ 50,000.00

Enter area of home to be remodled here/ information in task and budget for task automatically populates the sheets
Target
Finish Actual
Task Description Budget for task Notes Start Date Date finish date
1 LIVING ROOM
2 DINING
3 GUEST
4 KITCHEN
5 KITCHEN CABINET
6 REAR EXTENSION
7 STAIR AREA
8 FAMILY LIVING
9 MASTER
10 BEDROOM 1
11 BEDROOM 2
12 CURTAIN/LANGSIR
13 GRILL
14 OUTSIDE
15 LANDSCAPE
Total $ -
PROJECT # LIVING ROOM
0
PROJ. ADDRESS
0
Financial tracking

LIVING ROOM Quantity Price each Total Price

Plaster ceiling 1 $ - $ -
Cornice 0 $ - $ -
Ceiling light 4 $ - $ -
wall light 2 $ - $ -
fan 1 $ - $ -
aircond 2.0hp 1 $ - $ -
Installation 1 $ - $ -
wiring $ - $ -
Hall cabinet 1 $ - $ -
Painting 1 $ - $ -
Sofa $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # DINING

PROJ. ADDRESS

Financial tracking

DINING Quantity Price each Total Price

Plaster ceiling $ -
Cornice 0 $ -
Ceiling light/pendant 1 $ - $ -
wall light 2 $ - $ -
fan 1 $ - $ -
Installation 4 $ - $ -
wiring $ -
hack window 1 $ - $ -
new sliding 1 $ - $ -
new frame 1 $ - $ -
Designer basin/sinki 1 $ - $ -
Quality tap $ -
plumbing 1 $ - $ -
Decorative partition 1 $ - $ -
painting $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # GUEST

PROJ. ADDRESS

Financial tracking

GUEST Quantity Price each Total Price

Aircond 0 $ - $ -
Installation 0 $ - $ -
Wall light 2 $ - $ -
Hacking new door 1 $ - $ -
new toilet door 1 $ - $ -
wardrobe 1 $ -
ventilation fan 1 $ - $ -
wall fan 1 $ - $ -
installation $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # KITCHEN

PROJ. ADDRESS

Financial tracking

KITCHEN Quantity Price each Total Price

Cornice 0 $ -
Fridge 1 $ - $ -
Ventilation 1 $ - $ -
Pendant 2 $ - $ -
Ceiling light 0 $ -
Plug Modular Multi
System 1 $ - $ -
wiring $ -
Washer tap/plumbing 1 $ - $ -
Hacking 1 $ - $ -
Timber frame opening 1 $ - $ -
painting $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # KITCHEN CABINET

PROJ. ADDRESS

Financial tracking

KITCHEN CABINET Quantity Price each Total Price

Door 1 $ - $ -
Vertical Door $ -
Drawer $ -
Handles $ -
Soft hinges $ -
Worktop $ -
Hob 1 $ - $ -
Hood 1 $ -
Oven 1 $ -
Microwave 1 $ -
Sink single bowl 0 $ -
Tap 0 $ - $ -
plumbing 0 $ - $ -
dish rack $ -
front pull out basket $ -
base pull out $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # REAR EXTENSION

PROJ. ADDRESS

Financial tracking

REAR EXTENSION Quantity Unit Price each Total Price

New wall 1 $ - $ -
Window 1 $ - $ -
window Frame 1 $ - $ -
Door 1 $ - $ -
Door frame 1 $ - $ -
Lock 1 $ - $ -
Plaster ceiling 1 $ - $ -
*new toilet*
Toilet brickwall 1 $ - $ -
Sewer pipe 1 $ - $ -
water outlet 1 $ - $ -
Tap 1 $ - $ -
Plumbing 1 $ - $ -
Shower 1 $ - $ -
Basin/sinki 1 $ - $ -
mirror cum cabinet 1 $ - $ -
Towel ring 1 $ - $ -
Water heater 1 $ - $ -
Stainless steel MH 1 $ - $ -
Floor tile 35 ft2 $ - $ -
Emboss artistic wall til 70 ft2 $ - $ -
Skirting 1 LS $ - $ -
plug 1 Nos $ - $ -
Ceiling light 1 Nos $ - $ -
Switch 1 Nos $ - $ -
wiring $ -
*wet kitchen*
Hood
installation/ventilation 1 Nos $ - $ -
Hob base cabinet 3 ft/run $ - $ -
bowl 1 Nos $ - $ -
Basin base cabinet 3 ft/run $ - $ -
tap 3 Nos $ - $ -
plumbing 1 LS $ - $ -
Ceiling light 1 Nos $ - $ -
swith 1 Nos $ - $ -
plug 2 Nos $ - $ -
Decorative wall tile 63 ft2 $ - $ -
Non slip floor tile 50 ft2 $ - $ -
PROJECT # REAR EXTENSION

PROJ. ADDRESS

Financial tracking
painting $ -
Clear rubbish $ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # STAIR AREA

PROJ. ADDRESS

Financial tracking

STAIR AREA Quantity Price each Total Price

wall light 1 $ - $ -
pendant 1 $ - $ -
switch 2 $ - $ -
wiring $ -
painting $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # FAMILY LIVING

PROJ. ADDRESS

Financial tracking

FAMILY LIVING Quantity Price each Total Price

$ -
Wall fan 1 $ - $ -
Pendant 1 $ - $ -
Switch 2 $ - $ -
wiring $ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # MASTER

PROJ. ADDRESS

Financial tracking

MASTER Quantity Price each Total Price

Plaster ceiling 1 $ - $ -
Wall light 2 $ - $ -
Aircond 1 $ - $ -
installation 1 $ - $ -
ceiling fan 1 $ - $ -
Timber base at
window bench 1 $ - $ -
0.740m 1 $ - $ -
Base preparation 1 $ - $ -
Tile 1 $ - $ -
Water heater 1 $ - $ -
shower 1 $ - $ -
tap 2 $ - $ -
sinki cabinet 1 $ - $ -
shower curtain 1 $ - $ -
curtain rod 1 $ - $ -
painting 1 $ -
wardrobe 1 $ - $ -
dressing table 1 $ -
Switch 3 $ - $ -
Wiring $ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # BEDROOM 1

PROJ. ADDRESS

Financial tracking

BEDROOM 1 Quantity Price each Total Price

Plaster ceiling 1 $ - $ -
wall light 2 $ - $ -
ceiing fan 1 $ - $ -
aircond 1 $ - $ -
installation 1 $ - $ -
wardrobe 1 $ - $ -
study table 1 $ -
book shelve 1 $ -
water heater 1 $ - $ -
switch 2 $ - $ -
plug at study 1 $ - $ -
wiring $ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # BEDROOM 2

PROJ. ADDRESS

Financial tracking

BEDROOM 2 Quantity Price each Total Price

Plaster ceiling 1 $ - $ -
wall light 2 $ - $ -
ceiing fan 1 $ - $ -
aircond 1 $ - $ -
installation 1 $ - $ -
wardrobe 1 $ - $ -
study table 1 $ -
book shelve 1 $ -
water heater 1 $ - $ -
switch 2 $ - $ -
plug at study 1 $ - $ -
wiring $ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # CURTAIN/LANGSIR

PROJ. ADDRESS

Financial tracking

CURTAIN/LANGSIR Quantity Price each Total Price

$ -
Front window 1 $ - $ -
Front sliding $ -
living $ -
dining sliding $ -
Rear window $ -
Family living $ -
master window $ -
bed1 side $ -
bed1 rear $ -
bed2 rear $ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # GRILL

PROJ. ADDRESS

Financial tracking

GRILL Quantity Price each Total Price

Front window 1 $ - $ -
Front sliding 1 $ -
living 1 $ -
dining sliding 1 $ -
Rear ceiling 1 $ -
Rear window 1 $ -
Family living 1 $ -
master window 1 $ -
bed1 side 1 $ -
bed1 rear 1 $ -
bed2 rear 1 $ -
Toilet 4 $ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # OUTSIDE

PROJ. ADDRESS

Financial tracking

OUTSIDE Quantity Price each Total Price

Main gate 0 $ -
Porch light 1 $ - $ -
Gate light 2 $ - $ -
Safety sensor light 1 $ - $ -
$ -
$ -
$ -
$ -
Spent from budget $ -
Starting Remaining
$ - $ -
PROJECT # LANDSCAPE

PROJ. ADDRESS

Financial tracking

LANDSCAPE Quantity Price each Total Price

$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Spent from budget $ -
nancial tracking

Starting Remaining
$ - $ -
PROJECT # Project Budget $ 50,000.00 Project Budget
Budget plan $ - Cost Expended
PROJ. ADDRESS Remaining to plan $ 50,000.00 Over/Under Budget

Enter area of home to be remodled here/ information in task and budget for task automatically populates the she

Task Description Cost Notes


1 LIVING ROOM $ -
2 DINING $ -
3 GUEST $ -
4 KITCHEN $ -
5 KITCHEN CABINET $ -
6 REAR EXTENSION $ -
7 STAIR AREA $ -
8 FAMILY LIVING $ -
9 MASTER $ -
10 BEDROOM 1 $ -
11 BEDROOM 2 $ -
12 CURTAIN/LANGSIR $ -
13 GRILL $ -
14 OUTSIDE $ -
15 LANDSCAPE $ -
Total $ -
$ 50,000.00
$ -
$ 50,000.00

automatically populates the sheets


Target
Finish Actual
Start Date Date finish date

Вам также может понравиться