Вы находитесь на странице: 1из 3

Herbert Cole, Jr.

310 Cedar Ave.


West Berlin, NJ 08091
Cell (856) 357-4932
Home (856) 753-9678
E-mail
Functional Title
Designer/Draftsman
Experience Summary
I have been in the engineering field (Nuclear and Fossil Generation) for over 20
years. My experience in Instrumentation and Controls design extends from comput
er-aided drafting, field walk downs, equipment locations, equipment purchasing,
instrument tube routing, conduit routing, wiring connection, loop diagrams, cons
ulting with construction/vendors, specifications and installation procedures, in
corporating change work packages (ECN's, E&DCR's, DCP's etc.) filing documents,
reviewing specifications, contracts etc.
Professional History
Shaw Group - Moorestown, New Jersey
BE&K Engineering - Dover, Delaware
Sargent Lundy Engineering - Wilmington, Delaware
Stone & Webster Inc., a Shaw Group Company, Cherry Hill, New Jersey
Washington Group International/Raytheon Engineers & Constructors, Inc., Princeto
n, New Jersey
Merrimac Engineering Associates, Voorhees, New Jersey
McKeon-Grano Associates, Hackensack, New Jersey
Atometrics Engineering, West Nyack, New York
United Engineers and Constructors, Philadelphia, Pennsylvania
Computer Aide Capabilities
Auto-cad 12, 14, 2000, Micro station, In-tools and PDS Equipment Modeling
Education
Certified Auto-cad Course, version 13 and 14, Camden County College, Blackwood,
New Jersey -
Accredited Architectural Drafting Course (2 year program), Lincoln Technical Ins
titute, Pennsauken, New Jersey
Training
Manual Draftsman- (Leroy lettering etc.)
Auto-cad - (computer aide drafting)-version 2000 - In-house training course, Was
hington Group
PDS (3d computer drafting) In-house training course, Shaw Group Engineering Comp
any
Micro station (computer aide drafting), Washington Group,
In-tools (computer aided program for routing cables) In-house training course, S
haw Group Engineering Procedure writing, PSEG
Experience History
Shaw Group - Moorestown, New Jersey
Fossil Plant Design (June 2006 - )
Morgantown, Dickerson, Chalkpoint, Cliffside (Fossil Generating Station)
As Instrument and Controls Designer/Draftsman, responsibilities include instrume
nt location (using PDS equipment modeling), developed instrument installation mo
unting details, loop diagrams (using In-tools), instrument installation details,
bill of material take-off, reviewed P&ID's, vendor drawings.
BE&K Engineering - Dover, Delaware
Fossil Plant Modification (March 2005 to June 2006)
Stine Hassell (Fossil Generating Station)
As Instrument and Controls Designer/Draftsman, responsibilities include instrume
nt location, tube routing, tube tray design, wiring connections, development of
instrument mounting details, instrument installation details, bill of material t
ake-off, reviewed P&ID's, schematics, wiring diagrams, cable/conduit drawings, i
nstrument specifications, vendor drawings, etc. Performed field walk downs to ve
rify instrument locations, tube tray installation, equipment layout, cable routi
ng and point to point wiring check of electrical/control equipment. Consulted wi
th construction (field craft) verifying pertinent construction issues. Incorpora
ted field changes notices. Revised plant drawings using computer aided drafting.
Participated in project start-up meetings/project review meeting.
Sargent and Lundy Engineering - Wilmington, Delaware
Nuclear Plant Modification (July 2004 to March 2005)
Salem/Hope Creek (PSE&G Nuclear Plant)
As Instrument and Controls Designer/Draftsman, responsibilities include instrume
nt location, tube routing, tube tray design, wiring connections, development of
instrument mounting details, instrument installation details, bill of material t
ake-off, reviewed P&ID's, schematics, wiring diagrams, cable/conduit drawings, i
nstrument specifications, vendor drawings, etc. Performed field walk downs to ve
rify instrument locations, tube tray installation, equipment layout, cable routi
ng and point to point wiring check of electrical/control equipment. Consulted wi
th construction (field craft) verifying pertinent construction issues. Incorpora
ted field changes notices. Revised plant drawings using computer aided drafting.
Non-Engineering Related Work
Aluminum Shapes (factory assembly line)
Delair, New Jersey - Metal Extrusion Worker (February 2004 to July 2004)
Little Minnie's Day Care
Camden, New Jersey
Building Renovation Project (Draftsman) (November 2003 to January 2004)
Gospel Temple Church
Deptford, New Jersey
Building Renovation Project (Draftsman) (March 2003 to September 2003)
Stone & Webster Inc., Shaw Group Company - Cherry Hill, New Jersey
Nuclear Plant/Fossil Station Modification (August 2001 to February 2003)
Davis Bessie, Dresden (Nuclear Generated Plant)
Greystone, Marcus Hook (Fossil Generation Station)
As Instrument and Control Designer/Drafter, responsibilities include instrument
location, tube routing, wiring connections, development of instrument mounting d
etails, instrument installation details, developed bill of materials take-off, r
eviewed P&IDs, schematics, wiring diagrams, cable/conduit drawings, instrument s
pecifications, installation specifications, vendor drawings, purchased equipment
, etc. Performed field walk downs to verify instrument locations, equipment layo
ut, cable routing and point to point wiring check of electrical/control equipmen
t. Consulted with construction (field craft) in verify pertinent construction is
sues. Incorporated field change notices. Revised plant drawings using computer-a
ided drafting.
Washington Group/Raytheon Engineering and Construction - Princeton, New Jersey
Fossil Station Modification (October 1998 to July 2001)
As Instrumentation and Controls Designer/Drafter, responsibilities included inst
rument location, tube routing, wiring connections, development of instrument mou
nting details, installation detail specifications, reviewed P&IDs, schematics, w
iring diagrams, cable/conduit drawings, instrument specifications, vendor drawin
gs, etc. Revised plant drawings using computer-aided drafting.
Merrimac Engineering Associates - Voorhees, New Jersey
Nuclear Plant Modification (March 1998 to October 1998)
Salem, New Jersey - PSE&G
As Instrumentation Designer/Drafter, responsibilities for updating plant drawing
s per Engineering Change Documents. Revised plant drawings using computer-aided
drafting.
Stone & Webster Inc., Shaw Group Company - Cherry Hill, New Jersey
Nuclear Plant Modification (February 1997 to February 1998)
Salem, New Jersey - (PSE&G Nuclear Plant)
As Instrumentation Designer/Drafter, responsibilities included routing of instru
ment tubing, location of instruments, provided bill of materials, and performed
field walkdowns to verify instrument locations. Incorporated field change notice
s.
McKeon & Grano, Hackensack, New Jersey
Environmental Project (April 1990 to January 1997)
Linden, Sewaren, Edison, Burlington, Mercer (Fossil Generating Stations)
As Instrumentation and Control Designer/Drafter, responsibilities included prepa
ring of preliminary physical arrangement drawings, equipment layout drawings, wi
ring diagrams, and developed detailed installation specifications. Prepared Engi
neering Change Documents, performed field walkdowns, point to point wiring check
s, and assisted in function testing of electrical/controls equipment.
Atometrics Engineering - West Nyack, New York
Security Access System (April 1987 to January 1990)
Salem (Nuclear Generating Plant)
As Instrumentation and Control Designer/Drafter, responsibilities included draft
ing of conduit and cable routing layout drawings, purchasing of equipment/materi
als. Also reviewed vendor equipment drawings and performed field walkdowns.
United Engineers and Constructors - Philadelphia, Pennsylvania
Nuclear Plant Modification (February 1984 to February 1987)
Peach Bottom, Seabrook (Nuclear Generating Plant)
As Instrumentation Designer/Drafter, responsibilities included routing of instru
ment tubing, located instruments, developed instrument mounting details, provide
d material takeoffs, and performed field walkdowns.
Stone & Webster Engineering - Cherry Hill, New Jersey
Nuclear Plant Modification (October 1979 to January 1984)
Nine Mile, River Bend (Nuclear Generating Plants)
As Instrumentation Designer/Drafter, responsibilities included development of tu
bing isometric sketches, instrument tubing installation details, instrument moun
ting details, and instrument tubing mounting details.

Вам также может понравиться