Вы находитесь на странице: 1из 14

Objective : To discuss on the PDM contract/Uganda project requirment

Person met:Mr.Vijaya kumar/Mr.Gopal


Summary:
1. PDM contact offer is pending due to their approval from top management. End u
sers are interested in SKF. But IIPm is given the lowest offer.
2. And also IIPm is having conract with their kalamacery & chalakudy plants.
3. Classic auto component - uganda project - We have supplied the bearings for 2
project orders, And they are discussing with their clients for another 3 projec
t orders.
4. We can expect the 3 project order. But customer requesting us to hold the sam
e price i.e., 2010 prices.
Action plan:
1.Self to follow the PDM order
2.RBC to make the decision on holding the old prices for uganda project

Summary:
1. Details of the equipments & scope collected.
2. Totally 895 bearings needed Vibratition analysis - Velocity, displacement, Ac
celaration & FFT spectrum analysis
3. Thermography required for their panels - 262 points
Action plan:
Self to discuss with RS delivery team - regarding no. of days required to compl
ete the scope of work And submit the offer to customer.
Objective : To discuss on the requirment of brg 23198
Person met:Mr.Gopal
Summary:
1.current requirment is for 1 No. But they total requrment for this year is 8 No
s.
2. Since this is an emergency requirment. They have taken chinese brg. But they
requested us to plan for 1 No stock at RBC.
Action plan:
RBC to plan for stocking the above brg

Objective: To discuss on the new project order.


Summary:
1.They have taken new order for 2 machines in uganda. But they want some price r
eduction in the brgs since they haven taken order in very low price levels.
2. We said we will help then in some means.
Action plan:
1.RBC to work out the order value and then deceide on discount to operate

Caterpiller, Thiruvallur
Objective:To discuss on the annual requirment of Bearings & PT for their maintan
ance
Person met: Mr.Rajesh kumar/Mr.Sivakumar/Mr.Thimmareddy
Summary:
1. Currently they facing problem in supplies from Durga bearings for maintanance
& IBU supplies for their OEM requirments.
2. As we rquested, they have given the last 3 years consumption list. Based on t
hat we have submitted the ARC proposal.
3. The prices we offered is same for both maintanance & OEM requirments.And mutu
ally agreed by the customer. But they request us to keep the certain items in st
ock to cater their emergency needs.
4. Generated enquiry for the roller chains & sprockets
Action plan:
1. RBC to follow for ARC order copy. And plan for the stock suggested by the cus
tomer.
2. RBC to submit offer for the Chains & sprockets
LANCO, Kalahati
Objective: To discuss on the Annual rate contract for all platforms
Person met: Mr.Udyhya baskar/Mr.Anantha narayanan
Summary:
1. we submitted the ARC proposal in Feb'11 with 20% on MRP. Recommendations for
SKF is given by Mr.Shanker- Sr.mgr maintance (spun pipes division).
2. ARC is finalised @ 22% discount on MRP.And this ARC copy will be circulated t
o all their units including Electro steel castiongs- gummidipoondi.
3. While the discussion with shanker. We understood that they faced some failure
in FAG bearings in their critical drives.
4. We can expect 10 to 15% of share this year ( 15 Lacs business)
5. collected drawings for 3" pitch conveyor chain enquiry generated in earlier v
isit
6. We expect the order for TMFT 36 offer submitted earlier
Action plan:
Self to submit the offer for coneyor chain
RBC to follow for ARC copy & ensure that Purchase should circulate the ARC copie
s to all their divisons
RBC to follow for the offers submitted for MAPRO, Economus & oil seals

SBQ steel, Gudur


Objective:Presentation on 5 platforms
Contact person: Gopal - GM rolling mill/ Thimmaredddy
Summary:
1. Given presentation on 5 platforms
2. No. of participants 9 nos
3. Enquiry generated for SRB & CRB(motor application) worth 6 lacs.
Action plan:
RBC to submit the offer to customer.
Objective: To discuss on the ARC
Contact person: Muthu kumarasamy/ Vijayakumar
Summary:
1. They have requested RBC to increase the discount from 23% to 27%. Since curre
ntly they are getting 4% vat benifit on purchase from AP.
2. But we have not given further discount. Instead RBC request them to deduct 2%
CST on payment.

LANCO- Spun pipe


Objective: To discuss on the 5 platforms
Person met: Mr.Shanker
Summary:
1. presentation on the 5 platforms.
2. Mr.shanker is interested on MAPRO mounting tools, LGMT3 IN, Speedi sleeves &
vibration pen
3. They requested for the catalogue of MAPRO & seals
Summary:
1. RBC to send the Soft copy of catalouges
2. RBC to submit offer for LGMT3IN & Vibration pen
3. RBC to follow with shanker for MAPRO & Speddi sleeve enquiry
LANCO - COke oven plant
Objective: To discuss on the 5 platforms
Person met: Mr.Chandrasekaran
Summary:
1. presentation on the 5 platforms.
2. Mr.Chandrasekaran has complaint that most of the SKF bearing they are gettin
g is spurious.
3. We suggested him to go with AID's. And also requested him to push their purch
ase to get the brgs from RBC.
4. Enquiry generated for TMFT 36
Summary:
1. RBC to send the offer for TMFT 36

Zuari cements,Bangalore
Objective: To discuss on bearing bank proposal
Contact person:Mr.Purnachander-GM purchase/Balachandra - Manager purchase
Summary:
1. We reffered the discusssion we had with mr YS rao @ the plant on the bearing
bank proposal.
2. It seems that the purchase people not interested in putting up the bearing ba
nks.
3. Reasons for given by purchase people is a. Bearing bank will not workout on z
uari's buying pattern b.it will increase the bearing consumption c.also mal-prac
tice will happen
4. The required clarification on ARC terms - Our MRP pricelist mentioned as incl
usive of prices & ARC offer given as MRP less discount + tax extra
Action plan
1.Self to discuss with enduser to push the bearing bank proposal
2.Asian to send the letter on the clarification on the taxes

Zuari cements - Yerrakuntala


Zuari cements: Stores & work shop
Objective: To rectify the problem in induction heater TIH220M supplied recently.
Contact person:Mr.Gangadhar shetty & Ramachandra reddy - Stores & work shop
Summary:
1. Customer facied the problems of a)Horizontal sliding yoke is got struck in th
e guides b)vibartion & sound in the heater is very high.
2. Taken the trail with the used bearing.The bearing is reached the set temperat
ure and heater cuts offs. And also its demagnetised.And there is no error messag
e on the display.
3. So we confirms there is no electirical & demagneting issues.
4. Then i have checked for mechanical releted issues. Where we found that horizo
ntal yoke is not touching the vertical yoke. And also one screw is came out and
struck between the two guide rollers.Due to that the HZ yoke is not sliding.
5. We disassembled the guides & horizontal yoke, And tighten the screws in guide
s. After assembling - sliding issue is solved.
6. But still there was an gap between the yokes. So we decided to take an slot o
n the guides for 3 mm at bolt position.
7. The issue of high vibraton is sorted out by moving down the gides by 2 mm
Zuari cements: Mechanical maintanance
Objective:To disscuss on microlog requirment
Contact person: Mr.B srinivasa reddy - Manager mech
Summary:
1. Given presentation on the COMO, Brg solution products, Mapro, PT & Greases.
2. Given demo on the microlog and taken the readings in their Ball mill & VRM dr
ives.
3. They have the requirment for microlog for their line 2.But the budget for tha
t is 10 lacs.
4. And also they are requesed offer for MCA, CMAK 300, CMAK 600 & TKGT1
5. They are planning to replace their scrapper reclaimer chain in 2011, Where th
e OEM is claodius peter. And they dont have the GA drawing.
6. They have requirment of shaft alignment tool. But it has to align the torisio
nal shaft of ball mill.
7. They requested us to meet their HOD to discuss on the microlog
Action plan
Self to submit offer for Microlog,MCA, CMAK 300, CMAK 600 & TKGT1.
Ajay to give the details on scrapper chain equivalent
Checked with dharmendra on shaft alignment tool. But out tool will not align the
torissional shaft
Zuari cements: Mechanical HOD
Objective:To disscuss on microlog requirment
Contact person: Mr.YS rao
Summary:
1. Explanied on the variants & benifits of microlog
2. He requested for the information on the micrologs supplied in cement plants w
ith model & module details
3. And also we disucced on bearing bank proposal, He requested us to send the de
tails.
Action plan:
1. Saptiman to give the details on the micrologs supplied in cement plants with
model & module details
2. Self will send the details on the bearing bank prposal
Bharathi cements, Mechanical dept:
Objective: To discuss on the microlog & offer submitted for the coal mill LSB be
arings
Person Met: GGK murthy - GM & Mahesh - DGM
Summary:
1.Explanied on the variants & benifits of microlog & other COMO products
2.Given demo on GX model.
3.They are planing for advanced vibration analyser for plant 2. But it will be
finalised only december.
4. Requested offer for oil check CMAK 600
5. requirment of 618/710 & 718/710 bearings for coal mill crusher will be suppli
ed by loschire

Apollo tyres, Oragadam


Objective: To discuss on the conversion of plain bearing to antifriction bearing
s.
Person met:Mr.Bhaskar/Mr.Durai/Mr.Dwaraga
Summary:
1.They were facing problem of lubricant leakin from plain bearing in their 48" c
alender machine. Due to this lubricants fall in to their rubber products, where
in affect the performance of the process & also down time is high.
2. They need a solution in converting plain brgs in to the antifriction bearings
.
3.Machine drawing & the drive details are collected.
Action plan:
1.Self to check the feasablity of the conversion
2.Submit the conversion proposal to customer.
Bharathi cements, Hyderabad
Objective: Discussion on the ARC proposal submitted
Person met:Venugopal rao - Director / Krishnakumar - DGM
Summary:
1.ARC finalised @20% discount on DCD, PT, seals & 12% on mapro
2.Director requested us to support on frquent bearing failure applications
Action plan:
1.Asian to get the hard copy of the ARC
2. Self to interact with the users to get the details on the bearing failure app
lication.
Penna cements,Boyareddy palli
Objective: To meet endusers & discuss on all platforms
Person met: J.R.Srinivas
Summary:
1. presentation on Bearing Solution products, Mapro, COMO, PT, Economus & seals.
2. CUstomer shown interest on Adjustable hook spanner, TIH 220M,MCA,Thermal imag
er, Thermal camera,Ultrasonic leak detector & Belt tension pen
Action plan:
1.Asian to send the details & offer for the generated enquiries mentioned above
Penna cements,Talaricheruvu
Objective: presentation on all platforms
Person met: Ramprasad AGM- Mech (Maintanance team - 14 persons)
Summary:
1. presentation on Bearing Solution products, Mapro, COMO, PT, Economus & seals.
2. CUstomer shown interest on TIH 220M. And they planed to purchase one heater f
or both the plant
Action plan:
1.Asian to send the details & offer for induction heater
Ultratech cements - Purchase
Objective: follow up for offers submitted
Person met: Mr.AK desai/Mr.Srinu
Summary:
1. Order lost for the seals offer submited for FLS rawmill. Order placed on the
FLS for SKF seals @ L1 basis
2. Order received for NU236 & 6240 bearings worth 6 lacs
3. Regarding the buy back scheme offer for induction heater. The old heater was
supplied 31/2 years back and they faced the problem of mother board failure 2 ye
ars back due to that heater was stand still for 6 months. So they requested us t
o give the justification from SKF for the continous problems of the old heater.
4. SKF had replaced once the mother board of old heater at free of cost. And con
veniced the enduser that the failure of motherboard is due to the voltage fluctu
ation, and requested them to correct the fluctuations. got the approval for buy
back scheme
Action plan:
Soni to get the FLS offer price for seals
Ultratech cements - Kiln
Objective: Follow up for the CARB proposal
Person met : KNV murthy
Summary :
1. They have gone thru our CARB proposal. They have 9 nos of coller fan with 222
20 EKC3 W33, Where they are interesed in take trail of CARB.
2. On their next purchase for coller fan, They will raise indent for CARB
3. Reg. the failure of 2317 bearing in PA fan, since they dont have the vendor r
eg for SKF mumbai address. They will send the bearings to Soni bros office.
Summary:
Self will follow for CARB enquiry
Soni to follow for the failed bearings. Send the brgs to SKF mumbai
Dalmia cements,Mylavaram
Objective: 5 platform promotion
Person met : Bashkararao - Purchase
Summary:
1. They requested us to submit the ARC proposal as same as Dailmiapuram.
2. Currently Soni operating @ DCD 20% Domestic 26% - SMB is operating @ 27% on D
CD
Action plan:
SOni to submit ARC as per dalmiapuram & Visit dalmia,hydrabad to finalise the AR
C.

Hyundai,Chennai
Objective: ARC renewal discussion
Person met : Mr.Lakshmanan
Summary:
Year Sales Discount
2007-08 5 lacs DCD 15%, Dom 24%
2008- 09 24 lacs DCD 15%, Dom 24%
2009 -10 19 lacs DCD 18%, Dom 26%
1.AS ref the hyndai commitment on more bussiness, last year we have incresed the
discount.
2. Since there is no improvement in the business, we have finalised for the same
discount of lsat year.
3. Major bussiness is taken by FAG (Rose bearing) & high precession bearings(Dur
ga berings).
4.We requested customer to give us the last year consumption list of HPB. And al
so they requirment for HPB is always immediate,
Action plan
1. Self to discuss with Arasan to form a Strategy to increase the share of bussi
ness.

Suryadev alloy, Gummidipoondi


Objective: To discuss on the offers submitted for bearings
Person met: Anil saraff
Summary:
1. Currently they are buying ZKL bearings for their requirment. Since they have
faced lot of spurious brg issues in SKF.
2. Since RBC approched this customer earlier they have asked for material test c
ertificate.During this visit we have mutually agreed that skf will give the conf
irmity certificate on each supplies.
3. We have finalised order for TRB & DGBB worth 2.5 lacs (DCD 20% & domestic 23%
)
4. Enquiry generated for SRB worth 2lacs.
Action plan:
1. RBC to submit ARC proposal to customer @ earliest
2. Follow for SRB order.

anil saraff - 9381597286


TRB,DGBB,SRB - 1lacs,1.5 lacs & pending SRB 2.5 lacs(ZKL)
DCD - 20%
Domestic - 23%

MRF ltd,arakkonam
Objective : To discuss on the pulley requirment in their taiwan curing machines,
Person met : D.Balasubramanium/Mr.Somaskandan/Mr.Elvin (Asst mgr mech & Maintana
ce).
Summary:
1. Taken dimension of the pulleys, Total requirment will be 46 nos.
2. All the pulleys are non standard, Details sent to PT inquiry for pricing.
3. Huge potential for hydralic seals for the cylinders in curing machineries. cu
stomer planning to replace 446 nos of cylinders in this year.
4. Customer is facing failure of 3/4" pitch chain due to high moisture, Solution
given to switch to NI plated chains.
5. Customer requested for seminar on NON bearing platform
Action plan:
1. Self to check the feasablity of mfg non std pulleys. And revert back.
2. Mr.prasanth & UBC to visit to MRF on 6th april to collect the details of hydr
alic seals.
3. UBC to submit the offer for Ni plated chain to MRF.
4. UBC to organise for seminar
Dennis steel, Arakkonam
Objective : General visit
Person met : Sunil - plant controller
Summary:
Potential for brgs & other platforms will be aroung 5 lacs/annum.
Nelcast, Ponneri
Objective : To promote non bearing platforms.
Person met : Gobiraj - AGM / Vijay annapuranan - GM maintanance
Summary:
1. Customer requested to supply B70 belt for their compressor drive as a trail t
o validate the belt performance.
2. Enquiry generated for the hydraulic seals for high pressure molding equipment
. Customer will sent the samples.
3. Generated an opp. for the vibration analysis & SPM one day contract for their
critical motors & gear box.
Action plan :
1. UBC to supply the V-belt samples.
2. UBC to follow for the hydraulic seals samples.
3. Self & SKF service team to visit the customer to understand the scope & submi
t the offer.
Sujana steels, Periapalayam
Objective : To promote Non bearing platforms
Person met : Mr.Durgaprasad-VP commercial/Mr.Nrusingh mahapatra - VP tech/ Mr.Ve
lu - mgr maintance.
Summary :
1. Enquiry generated for the pullers to dismount max 380mm OD SRB bearing.
2. Enquiry generated for vibration pen
3. Vibration analysis service for their stand brgs. Totally 15 stands contains
4 brgs/stand
4. Requested for seminar on Bearing maintance & other platforms
Action plan:
1. UBC to submit offer for pullers & Vibration pen.
2. Self & SKF service team to visit the customer to understand the scope & submi
t the offer.
Hyundai ltd - Foundary
Objective : To collect the details of couplings used in the cooling tower.
Person met : Tirupathy kumaran (P/T maintanace)
Summary :
1. Coupling dimensions taken. But not matching with SKF couplings.
2. Enquiry generated for the high temperature grease (5 Kg/qtr).
3. Discussed on the E2 bearings. Customer agreed to take trail on the 30 KW moto
r.
4. Customer was unhappy on the longer delivery on the order for 6208-2Z/VA228 &
6211-2Z/VA228.
Action plan :
1.Feed back on delivery of high temp brg is given
2.UBC to submit offer for High temp grease.
3.UBC to follow with customer for E2 brg trail order.
Hyundai ltd - Engine transmission
Objective : To collect the details of couplings used in the cooling tower.
Person met : V.Alagiri - Technical associate
Summary:
1.Enquiry generated for TMMR8 two jaw puller.
2.Enquiry submitted for High speed greases for angular contach Ball bearing.
3.Enquiry generated for Oring chord, Oring kit
Action plan :
1.UBC to submit offer for TMMR8 & high speed grease.
2.UBC to check with economos for oring chord & kit.
Hyundai ltd - Assly. shop/Paint shop
Objective : Non bearing platform promotion
Person met : Mr.Ishak - assly shop/ Mr.Babu - Paint shop
Summary:
1. Enquiry generated for Auto lubrication system for converyor chain @ assly sho
p
2. Dimension details taken for oil seal with O-ring used in servo motors.
3. Order will be received for puller kit & assembly kit from paint shop.
4. Discussed on the E2 bearings. Customer is intersted to take trail.
Action plan:
1.Self will be visiting to hyundai on 30th april to collect the details of the c
onveyor system.
2.UBC to check with economos for oilseal with oring arrangement.
3.UBC to follow with customer for E2 brg trail order.
Hanil Automotive,
Objective : Reg. offer submitted on microvibe
Person met : Prabu- maintanance
Summary :we have given the addnl discount on offer. And customer has given oral
order confirmation
Ruchi soyas,Periyapallayam
Objective: To discuss on the ARC offer submitted for bearings
Person Met : Mr.Sunil kumar - Purchase/Mr.sabhari - Maintance mechanical
Summary:
1. Its 100% Koyo customer.
2. ARC proposal has been submitted & will be finalised for us for critical equip
ments
3. Oil seal total consumption list is sent by customer to RBC
4. Generated enquiry for Induction haeter (20 to 160 mm shaft size)
5. Generated enquiry for hydralic puller TMME 100H.
6. Customer is curently using Servogem AP3 greases. And requested us to submit t
he offer for SKF equivalent.
7. Requested RBC to send the details of system 24.
Action plan:
1. RBC to follow with customer to finalise the ARC for brgs
2. RBC to submit offer for oil seal, Induction heaters, TMME 100H & LGMT3 IN gre
ase.
3. RBC to send the writeup/technical information on system 24
Shriram EPC,Gummidipondi
Objective : To understand the customer requirments for SKF range of products
Since appontment was not fixed. not able to meet the users.
SaintGobain - Sand processing division
Objective : To understand the customer requirments for SKF range of products
Person met : Saravanan - Team member
Summary:
1.Enquiry generated for TMMP 3X300 puller.
2.Generated enquiry for 22230 & 6411 C3 brgs - 2 Nos/each
3.Catalouge copy of 5V pulleys & TLB to be sent to customer.
4.Explained the benifits of sealed sphercal & E2 bearings. And customer are inte
rested on these products.\\
Action plan :
1. rbC to send the offer for puller & bearing
2. Self to submit the details of pulleys, sealed SRB & E2 brgs.

Raghava textiles:
Objective : general visit
Person met :Eshwara reddy/ Raghu

Srivenkateswara sponge & Iron, Sri Kalahasti.


Objective : To understand the customer requirments for SKF range of products.
Person met : Mr.Gopal raju - purchase mgr/ Mr. KJ kutty - maintance.
Summary :
1. Plant has 4 kiln & 2 is @ running condition.
2. Requirment of servo EP 2 grease is around 3 barrels/ month. And current landi
ng price is around 138/Kg inclusive of vat.
3. And more than 1500 nos of SRB's in conveyors.
4. Discussed on Sealed SRB, SKF greases, Oil seals, speedi sleeve & V-Ring
Action plan:
1. RBC to closely follow with customer for next replacement of SRB for conveyors
. So that we can supply the sample of sealed SRB for trail purpose.
2. RBC to submit the offer for EP2 equivalent grease to the customer.
3. RBC to collect the oil seal consumption details.
Cocacola,Kalahasti
Objective : To understand the customer requirments for SKF range of products.
Personmet : Udhyakumar/Rambabu/Krishna murthy
Summary :
1. They are the NTN customers & Brg annual consumption around 5 lacs.\
2. They are Un happy with SKF bearings, since they came across lot of spurious.
3. Self is agrred to give an autorisation letter on RBC bearing that will ensure
that they will get the SKF original brgs.
4. While discussion on dry lubrication for bottle conveyors.They already install
ed the dry lubrication system of Diverse lever. But it was failure due to huge p
roiduction loss.
5. Generated 8 point lubrication system LAGD400 for their filler line.\
Action plan:
1. RBC to send the offer for LAGD400.
2. Self to send the authorisation letter.
3. Self to collet the details of success stories of SKF DRY lubrication system i
n any of the cocacola plant globally and submit the detals to customer.
LANCO, Kalahasti,
Objective : To understand the customer requirments for SKF range of products.
Person met : Udhaya bhasker.
Summary :
1. 100% FAG customer and supplies by premier brgs, chennai.
2. Customer is unsatisfactory with our brg performace & our serivce.
Action plan :
1.RBC to fix up an appointment with all endusers by second week of april
2.RBC to plan for an seminar @ customer end befor end may'10

SBQ steel, Gudur


Objective : To understand the customer requirments for SKF range of products.
Person met : Muthukumarasamy/Vijayakumar/Mr.Vinod/Thimma reddy
Summary :
1.Its an mini integrated steel plant & to be commisioned fulley at the mid of 20
11.
2.Now only cove oven plant is on operation.In last 4 months NTN has did a bussin
ess of around 15 lacs.
3.Customer requested to submit the ARC for all products immediately.
4.Requested for details of topics & price for the SLT
5.Enquiry generated for multipoint lub system for their blower house.Totally 12
critical lube points & 4 non critical lube points. and total area of the blower
house is 30 mtr X 60 mtr.
6. Enquiry generated for the puller models TMMA 100H/SET & TMBS 100E series.
7. Customer is planning for the blower house damper seals. They are planning for
the shut down on 11th of march. And RBC has to send a person to measure the dim
ension of 36 models of oil seals in that area.
Action plan:
1. RBC to submit the ARC
2. RBC to submit the offer for SLT topicwise, pullers.
3. Self to get price for multipoint lube system
4. RBC to depute a person to measure the dimensions of oil seal in their blower
house.

India cements,
Objective : To discussion on the offer submitte for vibration analysis contract
.
Person met : Ramesh / Meyappan
Summary :Given addnl of 5% dicount on the quoted price. Expecting the order for
the service contract.

Objective : To understand the customer requirments for SKF range of products.


Person met : Muthukumarasamy/Vijayakumar/Mr.Vinod/Thimma reddy
Summary :
1.Its an mini integrated steel plant & to be commisioned fulley at the mid of 20
11.
2.Now only cove oven plant is on operation.In last 4 months NTN has did a bussin
ess of around 15 lacs.
3.Customer requested to submit the ARC for all products immediately.
4.Requested for details of topics & price for the SLT
5.Enquiry generated for multipoint lub system for their blower house.Totally 12
critical lube points & 4 non critical lube points. and total area of the blower
house is 30 mtr X 60 mtr.
6. Enquiry generated for the puller models TMMA 100H/SET & TMBS 100E series.
7. Customer is planning for the blower house damper seals. They are planning for
the shut down on 11th of march. And RBC has to send a person to measure the dim
ension of 36 models of oil seals in that area.
Action plan:
1. RBC to submit the ARC
2. RBC to submit the offer for SLT topicwise, pullers.
3. Self to get price for multipoint lube system
4. RBC to depute a person to measure the dimensions of oil seal in their blower
house.