Engineering professional offering 15+ years of experience in designing, progr
amming, testing, logistics, deploying and supporting electronic equipment and as sociated systems in an engineering environment supporting hazardous material sto rage & handling, theme park ride and show systems, control systems for polymer e xtrusion, water treatment, vehicle manufacturing, and building automation system s. Highly skilled in project management with strengths in work planning and sche duling analysis. Extensive background and interpretation of power plant instrume ntation and controls equipment. Strong technical and methodical aptitude with an innate ability to analyze, coordinate and synthesize data. Ten years of proven ability to develop work instructions and schedules, for va rious industries including commercial nuclear power generation. Known for worki ng well with cross-functional teams to achieve on-time and on-budget project com pletion. ____________________AREAS OF EXPERTISE____________________ Project E&I Engineer I orchestrated the design and integration of numerous systems into a central SCADA system for a greenfield liquid fuel storage and distribution term inal located at Port Canaveral, Florida. * The design included the electrical distribution, instrumentation and control, closed circuit TV monitoring, access control, and automated gate control. * Supervised, reviewed or programmed the PLC using ISA-S88, ISA-94, and DCS meth odology. * The process pressure, temperature, flow instrumentation and tank valve control s used Foundation Fieldbus (FFB) components. The valve control for the distribu tion manifolds used actuator sensor interface (AS-I) bus components. * The CPM schedule and man-hour loading were performed using Primavera P6. * Manpower Scheduling & CAD Management Developed and implemented a manufacturing and customer documentation system w hich significantly increased production. * Designed and implemented manufacturing controls primarily responsible for expa nding capability of production by 200% for the division. * Advance the use of detailed project and production schedules to reduce lead ti me and increase throughput efficiency. Project Management and Engineering Re-designed of an aerospace launch facility project, by creating in stallation documents, coordinating procurement, verifying installation methods & quality. * Coordinated electrical installation staff of up to 320 electricians. * Shared management controls and reporting for an $85 million project. Methods used resulted in on-budget & on-schedule delivery. * Developed innovative methods for hazardous area installation * Established base-line data and instituted preventive and predictive maintenanc e program for aerospace launch facility. Project Management and Engineering As a project controls engineer on the construction team for Universal Studio' s Islands of Adventure we designed, reviewed, revised for constructability, and commissioned a 110 acre them park with five independently themed areas in less t han five years from concept to grand opening. * Managed controls and reporting for facility electrical and ride & show portion of $1.2 billion theme park project * Managed an accelerated schedule for all trades resulting in early attraction a vailability for grand opening schedule * ____________________EXPERIENCE____________________ 2008 to Present - Electrical & Instrument Project Engineer Seaport Canaveral Inc., Cape Canaveral, Florida Duties include the coordination, development and implementation of the electrica l distribution and instrumentation for the greenfield fuel storage terminal loca ted at Port Canaveral, Florida. While managing multiple contractors, I ensured the development of single line diagrams, equipment layout/ locations, instrument loop & installation drawings, interconnect drawings, and integrated network bus drawings. Supervision of EC's electrical & instrument installation and safety compliance was verified. The SCADA system and all instrumentation and communica tion bus systems were verified and implemented. * Managed multiple contractors, and coordinated various engineering specialties for an organized systematic operational on-schedule start-up of prduction operat ions. * Designed or reviewed all aspects of the facility from concept through detailed design review, and instaallation. * Supervised the EC's electrical & instrument installation for design specificat ion compliance. As a safety team member we verified compliance with all company safety and OSHA policies. 2007 to 2008 - Electrical Designer SeaRay Boats - Product Development & Engineering , Merritt Island, Florida Duties included the development of production document packages for manufacturin g, to include single line diagrams, machine control schematics, equipment layout and cable harness interconnect diagrams, installation of electrical AC & DC pow er distribution, VSAT satellite, and multi-source audio-video multi-media displa y systems and fabrication and installation drawings. * Pioneered the first production use of an intelligent electrical drawing packag e called VEsys. * Developed manufacturing document package using Unigraphics for modeling. 2004 to 2007 - Scheduling & CAD Manager North American Catastrophe Services., Melbourne, Florida Duties included the planning & scheduling of engineering & manufacturing activit ies, creation of the production manufacturing drawing package, production schedu ling system, specialty subcontractor coordination, and just in time (JIT) procur ement. Acted as liaison between design engineering and production on emergency m obile communications vehicles * Developed and implemented a detailed integrated project & production schedule, including manpower scheduling, subcontractor coordination, and just in time (JI T) procurement. * Developed single line diagrams, equipment layout and cable harness diagrams, * Developed installation and verification instructions for electrical AC & DC po wer distribution, telephony, LAN, VoIP, RoIP, VSAT satellite, and multi-source a udio-video multi-media display systems. 2004 to 2004 - Field Start-up Engineer Tompkins Inc., Orlando, Florida Duties included verification of hardware design for warehouse material handling system upgrade, commissioning of VFD and servo drives for conveyor control. * Demonstrated adaptability to "soft" PLC software control. 2002 to 2003 - Controls Engineer Hills Inc., W. Melbourne, Florida Duties included development of custom machine control production documentation p ackage including single line diagrams, schematics, cable harness, equipment and panel layouts, instrumentation and installation drawings using AutoCAD. PLC's w ere used for the power, control, & process temperature, pressure, and level for polymer extrusion and blown fiber handling equipment. Supervised construction, performed start-up of Ethernet & DeviceNet communication system based process co ntrols. * Developed and implemented new control product standardization for PLC and HMI to include software. * Developed and implemented CAD standardization for electrical documentation. * Developed and implemented P&ID standardization to ISA standards for electrical documentation. * Developed and implemented quality control and quality test requirements. 2002 to 2003 - Electrical control Engineer Beta Max Inc., Palm Bay, Florida Duties included development of single line electrical diagrams, schematics, cabl e harness and panel layouts for the power, control, and communication using Auto CAD 2000 custom material handling equipment. * Developed documentation standards and quality control procedures for material handling equipment * Completed design, constructed, programmed & tested prototype products for mate rial handling trade show. 2000 to 2002 - Electrical Designer Sachs Electric, Cape Canaveral, Florida Duties included facility redesign & generation of single line diagrams, cable ha rness, equipment and panel layouts, installation drawings for the power, control , communication, process temperature, pressure and flow instrumentation, and clo sed-circuit video infrastructure for all areas including hazardous locations at Launch Complex #41. * Developed CPM schedules, and projects controls. * Developed and implemented commissioning test plan and generated test reports. Implemented quality control and test requirements. 1998 to 2000 - Electrical Controls Engineer Universal Studios Islands of Adventure, Orlando, Florida Duties included planning, scheduling and contract management. Discipline specif ic duties included facility design & review of single line diagrams, schematics, cable harness, equip. and control panel layouts, review, or third party evaluat ion of ride and show programmed control systems, power and lighting, including wire, conduit, & breaker sizing, panel equipment layout, and equipment selection . * Developed CPM man-hour loading schedules, managed multiple contracts, prepared scopes of work descriptions, initiated field work directives, contract modifica tion documents, and field clarifications. * Coordinated the installation of mechanical, electrical & plumbing (MEP) * Developed or reviewed ride & show software packages. Performed software start up, debug, test & adjust, & final commissioning for ride & show effects. * Developed, supervised, witnessed and/or performed preventive & predictive main tenance test procedures. * Invented a ride control safety sensor which was patented 1997 to 1998 - Project Design Engineer Hampton-Tiley & Associates, Tampa, Florida Duties included facility design and development of single line diagrams and sche matics, cable harness, equipment sizing and component selection, MCC & PLC panel and control design of refrigeration and process control equipment, using AutoCA D Ver. #13. Developed PLC & MMI control system programs. * Developed refrigeration control systems for Ore-Ida Foods. * Developed refrigeration control systems for Anheuser-Busch. * Developed refrigeration control systems for Cott Beverage. 1996 to 1997 - Project Engineer General Motors Truck & Bus, Fort Wayne, Indiana Duties include project engineering, & control system design using AutoCAD & impl ementation of PLC-5 based quality (QVS) & material request (EPS) systems associa ted with production conveyors. Develop planning and scheduling of activities fo r outage, renovation, and new installations. * Successfully planned and supervised quality & material request system installa tion during holiday shutdown. * The QVS & EPS systems proved so successful as designed, they were installed wi thout modification at multiple GM Truck & Bus facilities. 1995 to 1996 - Project Manager Johnson Controls Inc., Indianapolis, Indiana Duties included planning and scheduling for various size projects for outage, re novation, and new installations. Develop project appropriation budget and detai led finalized estimates. Developed field work directives, contract modification documents, and field clarifications. * Development detailed CPM schedule and man-hour loading projections 1994 to 1995 - Lead Facility Electrician Landis & Gyr, Miami, Florida Duties included development and verification of facility electrical circuit load ing and distribution, the supervision of the modification and/or new circuit/equ ipment installation. Additionally, the development of single line diagrams, schematic design, cable h arness, and panel & equipment layouts using AutoCAD, installation, testing, oper ation & PM development of the 10 MW EDG power plant, UPS systems, 15KV switchgea r, MCC's, monitored & controlled by Square-D & GE PLC's, 650 Ton YORK HVAC chill ers. * Developed and administered the preventive & predictive maintenance programs an d test procedures for critical power. * Developed planning and CPM scheduling for outage and new installations. * Developed detailed project estimates and scope of work contract descriptions. 1990 to 1994 - Nuclear Planner - I&C and Electrical Florida Power & Light, Miami, Florida Duties included inspection, planning & scheduling of work using primavera, parts procurement, generated and reviewed plant change modifications for installation s, process instrumentation, P&ID's, instrument & logic loop diagrams, seismic re quirements, & power distribution using AutoCAD to create or revise drawings. Dev eloped preventive and predictive maintenance test procedures. Develop CPM sche dule for projects of various sizes * Administered preventive & predictive maintenance programs for critical power & production facilities. * Developed planning and scheduling of activities for outage, renovation, and ne w installations including detailed work descriptions with varying degrees of det ail. 1986 to 1990 - Nuclear Instrumentation & Control Technician Florida Power & Light, Miami, Florida Duties included inspection, troubleshooting and repair of pneumatic & electrical digital and analog control loop components for process pressure, flow, level an d temperature, parts procurement, loop testing & certification. * Develop preventive and predictive maintenance test procedures. * Assisted with development of CPM schedule for projects ____________________EDUCATION____________________ B.S., Computer Engineer - EE Florida International University, Miami, Florida Major GPA: 3.4 A.S., Electronics Technology Miami-Dade Community College, Miami, Florida Major GPA: 3.6. Earned AS Electronics Technology Earned AS Engineering Studies Earned AA Liberal Arts ____________________ADDITIONAL SKILLS____________________ * Demostrated programming competency with various PLC's such as Allen- Bradley C ontrolLogix, PLC-5, SLC-500's, Seimens S-7, Modicon & Quantum, Omron, Square -D * Demonstrated proficiency with programming various VFD's such as Allen-Bradley Powerflex 700, Seimens Micromaster, Square D, Yaskawa, ABB & Eaton ____________________AFFILIATIONS____________________ Institute of Electrical and Electronics Engineers (IEEE) Member International Society of Automation (ISA) Member ____________________TRAINING____________________ PLC-5 software seminar Rockwell Automation, Tampa, Florida VFD drive software seminar Rockwell Automation, Orlando, Florida Network Communications seminar Rockwell Automation