Академический Документы
Профессиональный Документы
Культура Документы
Payback Period
Mandatory
Indicative cost (Rs.) OR Immediate (or)
requirement/ Measures Measures Considered/
% Incremental cost Payback not a criteria No cost (or) < 2 years
Credit Comments
< 1 year
Site credit 3.0 High Solar Reflective Index (SRI) material Rs. 25 to 60/ sq.ft. Paints : Rs. 40-60/ sq.ft
(paints, white tiles, broken china mosaic tiles) China mosaic tiles: Rs 25-
for roofing 30/ sq.ft
Water Efficiency
Energy credit Solar water heating systems Rs 20,000 for 100 liters
4.0
Green Office - Incremental cost checklist
Payback Period
Mandatory
Indicative cost (Rs.) OR Immediate (or)
requirement/ Measures Measures Considered/
% Incremental cost Payback not a criteria No cost (or) < 2 years
Credit Comments
< 1 year
Materials
Mandatory Separation of waste - This is a mandatory √
requirement 1 requirement
√
Payback Period
√
√
√