Professional Summary
Structural engineer with over 15+ years of nuclear power plant and fossil power
plant experience. Performed design and modification of structural steel support
s, equipment foundations, concrete structures, and civil work within the facilit
y. Ability to interface with other design disciplines and personnel. Proficienc
y in skills and strong work ethic, along with exceptional mentoring and communic
ation skills presents a very well rounded lead engineer.
Expertise
Nuclear Power Plant Analysis/Design (Steel and Concrete)
Fossil Power Plant Analysis/Design (Steel and Concrete)
Structural Steel Framing Design Modification
Piping and HVAC Support Evaluation
Final Load Check Concrete, Steel, and Block Wall
Concrete Basemat and Equipment Foundation
Modification for Equipment Replacement
Rigging for Heavy Equipment in Nuclear Facility
Seismic Analysis and Design
Finite Element Analysis
NRC Requirements for Nuclear Generation Plant
ACI, AISC-ASD, ASCE-7, and/or AWS Codes
Computer Skills
GT Strudul * STAAD * SAP 2000 * MathCAD * APLAN * SAFE * AutoCAD 2000 * Microso
ft Office
Education
B.S. Civil Engineering - 1963
Jabalpur, M.P., INDIA
M.S. Structural Engineering - 1965
I.I.T Roorkie, U.P., INDIA
PhD. Coursework - 1978
I.I.T Chicago, IL
Experience
Sargent & Lundy - Chicago, Illinois 2002 - 2009
Senior Structural Engineer
Various Clients
* Nuclear Power Station (2006 - 2009)
Prepared and Reviewed Design Calculations
Prepared and Review Concrete Foundations
* Fossil Power Station (2002 - 2006)
Prepared and Reviewed Design Calculations
Prepared and Review Concrete Foundations
Prepared and Review Chimney Foundations
565 Cimarron Drive, West * Aurora, Illinois 60504 * Home/Fax: (630) 242-4522 *
Cell: (630) 440-1431 * Email: vs10f4e62@westpost.net
VASANT B. SULKAR PAGE 2 OF 2
Sargent & Lundy - Chicago, Illinois 1973 - 2002
Senior Structural Engineer
Client: Exelon
* Byron Nuclear Station (1983 - 2002)
Prepared and Reviewed Design Calculations
Final Load Check Concrete, Steel, and Block Wall
Performed 50.59 Review
* Zion Nuclear Station (1999 - 2002)
Prepared and Reviewed Design Calculations
Final Load Check Concrete and Steel
Performed 50.59 Review
* Quadcities Nuclear Station (1999 - 2002)
Prepared and Reviewed Design Calculations
* Dresden Nuclear Station (1999 - 2002)
Prepared and Reviewed Design Calculations
* Braidwood Nuclear Station (1991 - 1999)
Prepared and Reviewed Design Calculations
Final Load Check Concrete, Steel, and Block Wall
Performed 50.59 Review
* Omaha Public Power District (1975 - 1976)
Fort Calhoun Nation
Design Change Packages
Power Update
Diesel Generator Replacement
* LaSalle Nuclear Station (1973 - 1991)
Prepared and Reviewed Design Calculations
Inland Ryerson - Chicago, Illinois 1970 - 1973
Design Engineer
* Standard Oil High-rise Building
Prepared and Reviewed Design Calculations
* Milwaukee, Wisconsin Highway Bridge
Prepared and Reviewed Design Calculations
Other Skills
Toastmasters Club, Vice President, 1979
U.S. Citizen