Академический Документы
Профессиональный Документы
Культура Документы
Bachelor of Technology
In
Computer Science and Engineering
(HEAD)
My heartfelt gratitude also goes to all the faculty members and Staff of
report.
1) Introduction
3.1 Objective
3.2 Scope
3.3 Motivation
3.4 Problem Definition
3.5 Technologies Used
3.6 Organization of the Report
2) Background
3) Project Description
3.1 SRS
1. Product Perspective
2. User Interfaces
3. Hardware Requirements of User
4. Software Requirements of User
5. Operations
6. Product Functions
7. User Characteristics
8. Constrains
3.2 Software System Attributes
1. Security
2. Quality
3. Measurement
3.3 Features
3.4 Disadvantage of the Current System
3.5 Advantage of the Proposed System
4) Project Design and Implementation
4.1 Feasibility Study
4.2 Data Flow Diagram
4.3 Use Case Diagram
4.4 Development Schedule(Gantt Chart)
4.5 EER Diagram
4.6 Implementation
4.7 Code
4.8 Testing
4.9 Experimental Setup
5) Project Output
6) Conclusion and Future Scope
a) Conclusion
b) Future Scope
Appendix
a) Coding
b) Gontt Chart
c) EER Diagram
d) Test Cases
Bibliography
General guidelines for preparation of project report
Good quality white A4 size executive bond paper should be used for typing and
duplication.
Page Specification
Page numbers- All text pages as well as program source code listings should be
numbered at the bottom center of the pages.
Bibliography: (Example)
1. A. Stevens, C++ Database Development, MIS Press, New York, 1992, p.34
2. www.ibm.com/in
3. www.intel.com/india