Вы находитесь на странице: 1из 25

API SC2

Strategy Group Report


& ISO Activities

February 18, 2010 1


ISO TC67
•Secretariat
Relinquished by API/ANSI
•Accepted by The Netherlands (NEN)

•New Chairman: Neil Reeve (Shell)

February 18, 2010 2


ISO TC67/SC7
Current Activities

February 18, 2010 3


ISO TC67/SC7

 Last Meeting: Milan, Italy – June 4-5, 2009


 Next Meeting: London, UK – March 24-25

February 18, 2010 6


Key Agenda Items (US views)
 SC 7 Chair (R. Snell retiring)
 WG 3 (Fixed Structures) - Convener
 ISO 19901-3 – Topsides
 ISO 19905-1 - Jack-ups - Comments
 New Work Item – Structural Integrity Mgmt.
 ISO 19906 – Arctic Structures
 Explicit Reliability Levels in Normative Section

February 18, 2010 7


TC67/SC7 Document Status
 19900 – ISSUED - General requirements *
 19901-1 Metocean - ISSUED
 19901-2 Seismic – ISSUED *
 19901-3 Topsides - DIS
 19901-4 Foundations – ISSUED *
 19901-5 Weight – ISSUED *
 19901-6 Marine Operations – ISSUED <= new
 19901-7 Stationkeeping - ISSUED *
* = Activities ongoing
February 18, 2010
TC67/SC7 Document Status
 19902 - Fixed Steel Platforms – ISSUED
 19903 - Concrete Structures – ISSUED
 19904 - 1 Floating Structures (M,S,S) – ISSUED
 19904 - 2 TLP - DEFERRED
 19905 - Site-specific assessment of MODUs
 19905-1 – Jack-ups – DIS Ballot Closed Feb.
15, 2010 <= new
 19905-3 – Floating Drilling Units – To be
addressed through ISO 19901-7
 19906 – Arctic – R-FDIS sent to ISO CS <=
new

February 18, 2010 9


Current Document
Review/Ballots

 None

February 18, 2010 10


Forthcoming Documents for Review
6-12 Month Look Ahead

 ISO 19901-6 – Arctic, FDIS Q3 2010 **


 ISO 19901-7 – Stationkeeping : “Minor
Revision” - FDIS, Q4 2010
 ISO 19905-1 – Jack-ups FDIS, Q1 2011

** ISO/API Parallel ballot as RP 2N

February 18, 2010 11


SC7 Issue # 1
New Work Item Proposal

February 18, 2010 12


New Work Item Proposal
 Preparation of new document
 “ASSESSMENT OF STRUCTURAL INTEGRITY FOR
EXISTING OFFSHORE LOAD-BEARING STRUCTURES”
 Proposed by Norway
 New Work Group
 Work Group Convener from Norway
 Basis for new document:
 NORSOK N-006
 ISO 19902
 API RP 2A

February 18, 2010 13


US Response
 Negative Vote (coordinated with UK)
 New document already in the long term plans by SC 7
 Panel 8 – Structural Integrity Management already in
existence, and provided content for ISO 19902 and
ISO 19904-1
 Basis for new document:
 RP 2SIM
 ISO 19902
 ISO 19904-1
 NORSOK 006
 others…

February 18, 2010 14


SC7 Issue # 2
Explicit Reliability Levels
In ISO 19906

February 18, 2010 15


ISO 19906 – Arctic Structures
 Explicit partial factors for environmental actions
(not seismic) provided
 Statement: using these factors is deemed to
reach reliability targets
 Reliability targets for different levels of exposure
are explicitly stated in the normative section
 Option is given to use other factors as long as
reliability targets are met

February 18, 2010 16


ISO 19906 – Arctic Structures

February 18, 2010 17


Background for Target Reliability
 L1 => 10-5 comes from Canadian S 471
 Yearly probability of failure (YPOF) can be one
order of magnitude greater than the reliability
target
 YPOF would be “generally equivalent” to the
values in other ISO 19900 series documents
 Reference to ISO 19902 and reliability levels
quoted in A.9.9.3.3 (incorrect interpretation)

February 18, 2010 18


Background for Reliability Levels

February 18, 2010 19


US Position ??
 Historically US philosophy has been to avoid
specifying reliability levels
 Past policy of SC 7 has been consistent with US
position
 Request would be to move reliability targets to
the informative annex
 Alternatively, move targets to Regional Annex

February 18, 2010 20


API SC2

Strategy Group Report

February 18, 2010 21


Document Portfolio
Status

February 18, 2010 22


Status Report
 RP 2MOP/ISO 19901-6 – Balloted => YES => available ?
 RP 2EQ – Ballot Comments Resolved => ISSUE?
 RP 2T - Ballot completed
 RP 2FPS – Balloted => YES + Comments
 RP 2SIM – Going to ballot
 RP 2MET – Going to ballot
 RP 2GEO – Going to ballot
 RP 2A WSD – Draft issued to API
 RP 2SM/RP 2SK - In progress
 RP 2GEN – Getting Started…
 Others…..

February 18, 2010 23


RP 2GEN ISO
RP 2GEN 19900 ISO 19900

RP 2MET ISO
RP 2MET 19901-1 ISO 19901-1

RP 2GEO ISO
RP 2GEO 19901-4 ISO 19901-4

RP 2A 21st RP 2A 22nd
- WSD WSD

RP 2EQ ISO
RP 2EQ 19901-2 ISO 19901-2

RP 2SIM

RP 2MOP
RP 2MOP ISO 19901-6 ISO 19901-6

MERGED
API/ISO
STANDARDS
RP 2GEN

RP 2MET

RP 2A 21st
WSD RP 2GEO

RP 2A 22nd RP 2A 2nd
WSD LRFD
RP 2A 1st
LRFD RP 2EQ

RP 2SIM

RP 2MOP
INTRODUCTION
RP 2GEN/ISO 19900

General Parts

Topside Structural Marine


Metocea Seismic Geotechnica Station Fire and Weight
s Integrity Operati Plates Shells
n Design l Keeping Blast Control
Design Management ons
RP 2SK-
RP RP RP 2SIM RP RP 2SM/ RP 2FB 2V 2U
RP 2EQ/ RP 2GEO/ RP 2WGT/
2MET/ 2TOP/ 2MOP/ ISO
ISO ISO ISO
ISO ISO ISO 19902 ISO 19901-7 ISO
19901-2 19901-4 19901-5
19901-1 19901-3 ISO 19904-1 19901-6 19901-3
RP 2I

Specific Structures

Fixed steel Concrete Floating Arctic Riser


TLP Jack-ups MODUs
structures Structures Structures Structures Design
RP 2A RP 2A
RP 2CON/ RP 2FPS/ RP 2T RP 2N/ RP 2RD/
WSD LRFD/
ISO ISO ISO ISO
ISO ISO ISO
19903 19904-1 19906 13628
19902 19905-1 19905-2

Under
Under Not No
Existing Developm
Revision Started Plans
ent

VISION 2010 – Status Q1 2010

February 18, 2010 26


END

February 18, 2010 27

Вам также может понравиться