Академический Документы
Профессиональный Документы
Культура Документы
R. N. Nayak, Executive Director M. Krishnakumar, General Manager Anish Anand, Chief Design Engineer
KISHENPUR
MOGA
TEHRI
MEERUT
LUCKNOW BALIA FATEHPUR SASARAM SASAN BINA SATNA NKSTPP RANCHI SEONI SIPAT GAYA PURNEA
SILIGURI
DEHGAM
INDORE ITARSI
DHULE
WARDHA IB VALLEY
VIJAYAWADA RAICHUR
LEGEND 1200KV UHVAC LINES 765KV UHVAC LINES 800kV HVDC BIPOLE
BANGALORE MADRAS
TYPICAL TRANSMISSION LINE DESIGN OPTIMIZATION FLOW CHART Bundle Conductor studies Review of Existing systems & Practices Selection of clearances Insulator string design
Tower Fdn. Design/Study Tower Configuration Analysis
Results
Ground Clearance
Minimum Ground Clearance as per IE Rules : 16 m Ground Clearance proposed : 23 m
(based on 10 kV/m electric field limit)
10 m
12 m
55 77m 10
2.3 m
11 m
15 m
15 m
15 m Sag
GCL = 23 m
10 m
12 m
55 77m 10
2.3 m
11 m
55
15 m
15 m
15 m Sag
Minm. Clearance 13 m
GCL = 23 m
35 m
50 m
59.1
55.9
Thermal Rating of 1200 kV Line : More than 10000 MVA Surge Impedance Loading of 1200 kV Line : Around 6000 MW
CONDUCTOR-BUNDLE
Conductor-bundle Octagonal ACSR Bersimis / Moose 457-600 mm spacing
ELECTRICAL CLEARANCES
Power Frequency live-metal clearance Switching surge clearance (1.75 pu) Phase to Phase Spacing Ground Clearance 2.3 m (55 deg swing) 10 m (Stationary/10 deg swing) 27.5-30 m 23 m (10 kV/m elect field limit)
INSULATOR STRINGS
For Suspension Towers (I V I) For Tension Towers I- Double Suspension, 300/320 kN (2x55), V Single V, 420 kN (2x50) Quad Tension, 320 kN (4x55)
SIL (MW)
SIL : 3 Times
RIGHT OF WAY
Right of Way Requirement : Approx. 55% more
100
ROW Utilization
765 kV Line 1200 kV Line
60
LINE COST
Capital Line Cost : 2 2.2 Times
THANK YOU
KOLKATA
Installed Capacity : 1349 MW Local Grid Feeding to Local Load No State/ Regional Grid
MUMBAI
CHENNAI
400 kV D/C Pole Structure 765 kV S/C Transmission Line (Delta Configuration) 400 kV Multi-circuit Transmission Line
Air-gap , D = 10 m
Basis : EPRI Formula CFO = 1.2 * 3400 / (1 + 8/D)
XL (Ohms/km) XC (Ohms-km)
System Voltage
1000 kV 1000 kV 1200 kV 1200 kV
Conductor-Bundle Adopted
Octagonal 31.5 mm ACSR Octagonal 36.4 / 34.2 mm ACSR Octagonal 42.4 mm Octagonal 24.1 mm
POWER FLOW SURGE IMPEDANCE LOADING Approx. 6000 MVA Approx. 2000 MVA Approx. 3 times
RIGHT OF WAY (ROW) REQUIREMENT 100 m 64 m CAPITAL LINE COST Approx. Rs. 30-33 million per km Approx. Rs. 15 million per km Approx. 2 2.2 times Approx. 55 % more
RIGHT OF WAY UTILIZATION Normal Power Flow per Unit ROW Approx. 60 MVA Approx. 30 MVA Approx. 2 times per m per m COST EFFECTIVENESS Line Cost per Unit Power Flow Approx. Rs. 50005500 per km per MVA Approx. Rs. 7500 per km per MVA Approx. 70 %
GROWTH OF POWERGRID
60,000
55100 54400
4000 3500 3000 2500 2000 1500 1000 500 0 983 634 236 1992-93 275 1995-96 444 643 1770
50,000
3554 2831
2805
40,000
2533
MVA
CKMs
27244 28820
35119
34288
30,000
22228 22748
20,000
12,201
748
786
1009
10,000
0
1992-93 1995-96 1998-99 2001-02 2002-03 2003-04 2004-05 2005-06
1998-99 2002-03
2003-04
2004-05
2005-06
Growth in last 13 years Transformation Capacity Circuit Kilometer Asset Growth POWERGRID Turnover Profit Manpower
30000 25000 20000 15000 10000 5000 0 1992- 1995- 1998- 2001- 2002- 2004- 200593 96 99 02 03 05 06 3521 8851 5492 13877
7200
Asset Base
19876
21930
Rs. in Crore
24888
6923
6167
Transferred Manpower