40 mm 9.86 kg/mtr
Sl no
Switchyard equipment 1 Generator Transformer 2 Station Service Transformer 3 Circuit Breaker 4 Isolator without Earthing switches 5 Isolator with Earthing switches 6 Current Transformer 7 Voltage transformer 8 CVT 9 LA 10 Post Insulator(PI) 11 Lightning Mast 12 TA 13 TB 14 Beams Considering all beams)
Nos 2 1 8 7 16 24 6 12 21 23 8 15 7 1
Earthing material
material required in mtr/ item 30 30 144 27 35 12 12 12 20 12 50 34 22 700 Add 10% for cutting & welding Add 10% Extra
GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm) GS flat (size 65 x 8 mm)
15 Marshalling box for CT 16 Marshalling box for CB 17 MarH Box for Iso.with Earth switch
24 8 7
10 45 6
18 MarH Box for Iso.without Earth switch 19 Marshalling box for CVT 20 Marshalling box for VT 21 MarH box for Transformer 22 Bay Marshalling Box
12 10 10 10 10
Total (mtr) 60 30 1152 189 560 288 72 144 420 276 400 510 154 700 4955
Total weight ( Kg) 244.92 122.46 4702.46 771.5 2285.92 1175.62 293.9 587.81 1714.44 1126.63 1632.8 2081.82 628.63 2857.4 20226.31 202.26 202.26 20630.84 20MT 565.2 847.8 98.91
192 120 60 30 80
Say