Material de fundacin Clculo del MR de diseo Resultados Frmula correlacin ensayos de (Venezuela) CBRsaturado (%) 15.3 3000*CBR^0.65 7.6 3000*CBR^0.65 7.8 3000*CBR^0.65 8.2 3000*CBR^0.65 2.0 1500*CBR 5.7 1500*CBR 9.2 3000*CBR^0.65 34.0 4.326*ln(CBR) + 241 3.9 1500*CBR 1.4 1500*CBR 10.6 3000*(CBR^0.65) 1.9 1500*CBR 2.2 1500*CBR 8.45 MR Promedio MR por Correlacin PAS (psi) 12,409 7,711 7,848 8,120 3,137 6,375 8,781 21,017 4,800 2,612 9,668 3,050 3,312
MR (psi) 17,667 11,211 11,402 11,779 3,000 8,550 12,694 15,496 5,850 2,100 13,918 2,850 3,300
Muestra 1 2 3 4 5 6 7 8 9 10 11 12 13
9,217
7,603
Muestra 27 28 29 30 31 32 33 34 35 36 37 38 39
Resultados de ensayos de CBRhmedo (%) 20.9 17.9 17.4 37.9 3.9 9.9 24.9 44.0 8.2 3.9 30.7 5.0 6.9
Frmula correlacin (Venezuela) 4.326*ln(CBR) + 241 3000*(CBR^0.65) 3000*(CBR^0.65) 4.326*ln(CBR) + 241 1500*CBR 3000*(CBR^0.65) 4.326*ln(CBR) + 241 4.326*ln(CBR) + 241 3000*(CBR^0.65) 1500*CBR 4.326*ln(CBR) + 241 1500*CBR 1500*CBR MR Promedio
MR (psi)
Correlacin PAS
13,391 19,565 19,208 15,966 5,850 13,313 14,149 16,611 11,779 5,850 15,054 7,500 10,350
15,541 13,807 13,543 22,239 4,800 9,230 17,511 23,918 8,120 4,800 19,868 5,763 7,425
12,968
12,813
Zona VII
Meses por Dao relativo (Meses por ao MR (promedio) (uf) ao)*Uf 6.0 20,626 0.0115 0.0690 3.0 12,891 0.0344 0.1032 3.0 8,410 0.0925 0.2775 12.0 Sumatoria 0.4497 UfPonderado 0.0375
Zona VII
Meses por (Meses/ao)* ao MR (Promedio) MR 6.0 20,626 123,756 3.0 12,891 38,673 3.0 8,410 25,230 12 Sumatoria 187,659 MRPonderado 15,638 Incorrecto
8,410
MR(hmedo)
12,891
MR(seco)
20,626
Clculo de los valores de MR para la base y sub-base granular MR Base granular CBR>= 60% MR(PAS) AASHTO Promedio (exigencia de Proyecto, sin haber ejecutado ensayos) 31,765 27,000 29,383
Clculo de los valores de MR para la base de Resistencia a la compresin simple a los 7 das Contenido de cemento 8% 10% kg/cm2 40 55 psi 568 782 AASHTO 670,000 800,000
CBRsaturados 32 38 35 28 33 42 37 47 30 29
35.1
MR Mezclas asflticas Ecuacin de correlacin N 3 Tipo de mezcla Propiedad Estabilidad Flujo (,01 pulg) Altdura Dimetro M12 2900 9 2.5 4 M19 3000 11 2.5 4 Witzack 7.69
5.3 5.0 3.7 3.0 419,064 354,694 467,610 A 70 FAREN Y FRECUENCIA DE 0,3 ecuacion de correlacin N3 (Freddy Sanchez) pag 3-30
Clculo de los valores de MR para la base de suelo-cemento Resistencia a la compresin simple a los 7 das
Material
% Compact.
Precios Unitarios
Unidad PU
PU (Bs./m2)
Anlisis Precio Unitario materiales granulares (Bs/m3) Grava Picada Granzn mina Sum y proces mat. Colocacin y comp. Transp @ km
Total
Total
Material
% Compact.
Precios Unitarios
Unidad PU
PU (Bs/m2)
Anlisis Precio Unitario Mezcla de suelo-cemento Corte, carga agregado Transp @ km (/m3) Pulv. y mezclado Extend&Comp Contenido cemento Precio cemento (kg) (XX C/kg) Transp cemento (YY C/kg) Total
Total
Alternativa Peso Unitario (Lab) (Ton/m3)
% Compact.
Precios Unitarios
Unidad PU
PU (Bs/m2)
Imprimacin ( ) Adherencia ( )
Total
Alternativa 1: MAC/Bg/Sbg Peso Unitario (Lab) Peso Unitario (Ton/m3) % Compact. (campo) 2.370 0.97 2.299 2.300 0.95 2.185 2.080 0.95 1.976
Material MAC 12 Piedra Picada Grava cernida Espesor (m) 0.25 0.15 0.15
Total
Alternativa 2: MAC/MAC Peso Unitario Peso Unitario (Lab) % Compact. (campo) 2350 0.97 2,280 2300 0.97 2,231
###
Precios Unitarios Unidad PU 220 Bs/ton 180 Bs/ton Sub-total Imprimacin (1) Adherencia (3)
PU (Bs/m2) 40.13 148.58 188.71 3.42 6.84 0 Sub-Base granular Sum, exten y comp Transp@34 km Bs/m3 97.5 76.5 174.00
Total
Alternativa 3: MAC/Base suelo cemento Peso Unitario Peso Unitario (Lab) % Compact. (campo) 2350 0.97 2,280 2300 0.97 2,231 2100 0.98 2,058
198.97
Material MAC 12 MAC IV Grava cemento Espesor (m) 0.08 0.3 0.25
Precios Unitarios Unidad PU 220 Bs/ton 180 Bs/ton 140.0 Bs/m3 Sub-total Imprimacin (0) Adherencia (3)
Total
Alternativa 4: MAC/Base suelo-cemento/Sub-base granular Peso Unitario Peso Unitario (Lab) % Compact. (campo) 2400 0.97 2,328 2300 0.97 2,231 1900 0.98 1,862 2050 0.95 1,948
202.44
Material MAC 19 MAC 25 Grava cemento Grava cernida Espesor (m) 0.08 0.24 0.25 0.2
Precios Unitarios Unidad PU 220 Bs/ton 180 Bs/ton 140.0 Bs/m3 59.5 Bs/m3 Sub-total Imprimacin (1) Adherencia (3)
Total
Alternativa 1: MAC/Bg/Sbg Peso Unitario (Lab)
191.09
% Compact.
Precios Unitarios
PU (Bs/m2) -
Total
Alternativa 2: MAC/MAC Peso Unitario (Lab)
% Compact.
Precios Unitarios
PU (Bs/m2)
Total
Alternativa 3: MAC/Base suelo-cemento Peso Unitario (Lab)
% Compact.
Precios Unitarios
PU (Bs/m2)
Total
Alternativa 4: MAC/Base suelo-cemento/Sub-base granular Peso Unitario (Lab)
% Compact.
Precios Unitarios
PU (Bs/m2)
Total
Alternativa 1: MAC/Bg/Sbg
Material
Capa
MAC M12
Rodamiento
2,900 3,000 55
CBR promedio de 35,1%
Varios CBRs saturados y humedos
MAC M19
Intermedia
12
Suelo Cemento
Granzn de mina Material o Corte de Relleno
(10% cemento)
Sub-Base Granular
Promedio de Correlaciones PAS y AASHTO Dao relativo ponderado funcin de regin climtica
Sub-Rasante
Alternativa MAC/MAC/SC/Sbg
Material
Capa
Criterio
So po pt
ai
SN sobre la capa
Mdulo (psi)
419,064
Rod/Int
0.420
354,694
Int
Ecuacinp ag 3-33
0.405
800,000
Sc
Ecuacin pag 3-35, acotado a max de 0,13
19,088 Calculadora
4.48 5.18
Sbg
0.130
12,414 Calculadora
ai
Coeficientes estructurales Mdulo (psi) SN/capa(i) por Programa PAS Tipo Figura y pgina Valor
PSI
po-pt
m(i)
Criterio del Coeficiente de drenaje Valor del Coeficiente de drenaje Espesor de clculo En En pulgadas centmetros Espesor de construccin
Criterio de espesor Clculo y redondeo por construccin Clculo y redondeo por construccin
1.0
1.57 2.36
4.00
4.0
0.9
6.00
6.0
22.50
Regin VII y mal drenante (Tabla II, pag 3-39)
22.5
Clculo y redondeo por construccin
0.8
35.17
89.33
17.0
cmi
Criterio del Coeficiente de drenaje Valor del Coeficiente de drenaje Espesor de clculo En En pulgadas centmetros Espesor de construccin Criterio de espesor
SN(i) = ec * ai * cmi
SN de SN de construccin de construccin sobre Condicin de Wt18 resistentes/capa la capa "i" la capa "i" diseo "i" Cargas de diseo
0.661 0.861
O.K O.K
47,508,848
0.661
43,821,154
0.696
1.522 2.218
O.K O.K
45,857,500
45,475,400
Sin = ec * ai * cmi
SN de SN de construccin de construccin sobre Condicin de Wt18 resistentes/capa la capa "i" la capa "i" diseo "i" Cargas de diseo
43,821,154
Sub-rasante
Material
Capa
Espesor (cm)
Tipo
Figura y pgina
Valor
Material
Capa
Espesor (cm)
Tipo
Figura y pgina
Valor
SN(i) = ei * ai * cmi
Valor del Coeficiente de drenaje SN de construccin construccin de la capa "i" sobre la capa "i" Wt18 resistentes/capa "i" para Confiabilidad del
SN de
MR
SN(i) = ei * ai * cmi
Valor del Coeficiente de drenaje
SN de Wt18 resistentes/capa construccin Condicin de diseo "i" para Confiabilidad sobre la capa del "i"
Cargas de diseo
43,821,154
Cargas de diseo