MINDANAO RIVER BASIN

2ND LARGEST RIVER


BASIN IN THE PHILIPPINES
AGUSAN River Basin

MINDANAO River Basin

Rivers Pulangi Ala

Length 323 kms 120 kms

Mindanao

100 kms

Basin Area=23,170 Sq. km

MINDANAO RIVER BASIN

PULANGI RIVER
SIMUAY RIVER MINDANAO RIVER

ILLANA BAY TAMONTAKA RIVER

LIGAWASAN MARSH

ALA RIVER

ALA VALLEY BANGA RIVER


3

Courtesy of RDC 12, FRANK_2008 presentation

The Mindanao (Cotabato) River Basin


HEAD WATER PULANGI R.
ELEV. 1,500 M.

SCHEMATIC RIVER FLOW


MANUTO R.

TIGUA R.

SAWAGA R

KULAMAN R.
MANUPALI R NATAYLAN R KABACAN R. ALIP R. MLANG R. MALASILA R. BANGA R. LAKE SEBU

HEAD WATER ALA R.


ELEV. 1600 M

MARAMAG R.
MULETA R

LAKE BULUAN

N
LEGEND:

MALADUGAO R. MALITUBOG R
PAGALUNGAN PIKIT

LIGAWASAN MARSH
M I N D A N A O R

BULUAN R SEPAKA R.

MAGANOY R DATU PIANG

Rivers Existing Cut-off Channel


Marsh Area River Flow Direction

ALLAH R. CROSSING

LIBUNGAN MARSH
LIBUNGAN R

EBPANAN MARSH TAMONTAKA RIVER

COTABATO CITY BRIDGE SIMUAY R

LOWER COTABATO RIVER BASIN


4

SITUATION AT THE MRB


Heavy rains started in the month of May 2011 as of 5pm, May 22, 2011: PAGASA

estimated tropical storm Chedengat 1,050 km East of Northern Mindanao June 9, 2011: Typhoon Dodong came in.

Municipality of Lambayong, Sultan Kudarat Province

June 11, 2011

BREACH SECTION

The Pulangi-Pagalungan Rivers, Cut-off Channel towards Ligawasan Marsh

Tunggol Bridge

June 11, 2011

Scoured Area

Tunggol Bridge

Tunggol Bridge Along Davao-Cotabato Road


Electric Post Scoured Area

Damaged Slope Protection

Silted Area

Scoured Area
Electric Tower

Facing Upstream

Malitubog-Maridagao, Libungan Rivers


From the areas of Lanao del Sur and Bukidnon flow the Libungan and Malitubog-Maridagao Rivers respectively. They eventually flow into the Ligawasan Marsh. The swelling of these heavily silted rivers and their tributaries due to the heavy rainfall in May and June aggravated by wanton deforestation caused severe flooding in the province of North Cotabato. This took place particularly in the municipalities Alamada, Libungan, Pigcawayan, and Midsayap and resulted in the destruction of thousands of hectares of farmlands.

Simuay-Ambal Rivers

Segment I

Segment III

Segment II

June 11, 2011

Illana Bay

Cotabato-Matampay Rivers

3 marshes---June 11, 2011

Ebpanan Marsh---June 11, 2011

Ligawasan Marsh---June 11, 2011

Upstream of Mindanao River----June 11, 2011

June 11, 2011

Illana Bay Sultan Kudarat area


Quirino Bridge

atampay Bridge

Rio Grande de Mindanao

Matampay River

What can be done? In the short term:


1. Fast track the dredging of Rio Grande de Mindanao simultaneous dredging of various stretches. 2. Regularly clearing the water hyacinth as soon as they flow down towards Delta and Quirino bridges. 3. Revise the footings of both bridges so that water hyacinth would slide by them. 4. Fast track the work of widening and completing the Simuay cut-off channel and closing the breach. 5. Protect Tunggol Bridge and the old Matampay Bridge. 6. Construct Raradangan and Olandang Bridges. 7. Deploy 3 WaterMasters for the Mindanao River Basin

In the long term:


1. Replace Quirino Bridge 2. Systematize the dredging of the Rio Grande from Yllana Bay to Kubuntalan. 3. Reforestation of the Mindanao River Basin 4. Establishing catchment structures to catch water hyacinth as they flow from Ligawasan Marsh down towards Cotabato City. 5. Implement the high impact projects identified by the Mindanao River Basin Integrated Management and Development Master Plan:

HIGH IMPACT PROJECTS


The Projects to be subjected for pre-feasibility study level are as follows: 1) Pre-feasibility Study of the Development of Early Warning and Flood Forecasting System Project for the Mindanao and Malungun-Buayan River Basins 2) Pre-feasibility Study of an Integrated Flood Control, River Bank Protection and Rehabilitation Project for Ala River System. 3) Pre-feasibility Study of an Integrated Flood Control, River Bank Protection and Rehabilitation Project for Pulangui River System. 4) Pre-feasibility Study of an Integrated Flood Control, River Bank Protection and Rehabilitation Project for Rio Grande de Mindanao River System. 5) Pre-feasibility Study of an Integrated Flood Control, River Bank Protection and Rehabilitation Project for Malungun-Buayan River System. 6) Pre-feasibility Study of Dendro Thermal Power

HIGH IMPACT PROJECTS


The Projects to be subjected for feasibility study level are as follows;

1) Feasibility Study of an Integrated Flood Control, River Bank Protection and Rehabilitation Project for AmbalSimuay River System 2) Feasibility Study of Siltation Control and Management Project for Rio Grande de Mindanao River System. 3) Feasibility Study of Siltation Control and Management Project for Ala River System. 4) Feasibility Study of Siltation Control and Management Project for Malungun-Buayan River System.

6. Establish an agency with the necessary powers and authority to implement the Master Plan.

Priority Projects
Name of the Project 1. Community-based Integrated Dredging and Management Model for Mindanao River Basin Status No Funding Allocation

2. Channelization and Bank Protection with Sluice gate for Emergency Project at Simuay River and closure of Breach
3. Immediate Provision of additional Watermaster for Task Force Deployment 4. Simultaneous Dredging of Rio Grande de Mindanao from Bucana to Quirino Bridge (7Kms.) 5. Tunggol Bridge II, Bank Protection, Channelization Phase I and Phase II, Datu Montawal, Maguindanao (very critical bridge linking Davao City and Cotabato City)

On-going

P 60 M

On-going (200M released) For Funding

P 250 M

P 75 M

6. Repair of Olandang Bridge which collapsed during typhoons Frank and Cosme 7 . Repair/Rehabilitation of Ala River Flood Control, Channelization at Punol, Sigayan, Panabungan, Papakan Section, Lambayong, Sultan Kudarat 8. Repair/Rehabilitation of Ala River Flood Control, Channelization and Bank Protection along Punol, Sigayan, Panabungan, Papakan Section, Lambayong, Sultan Kudarat

Funded P 45M FY 2011

P 49 M P 100 M

On-going (70M released)

No funding

P 100 M

9. Proposed Upgrading/Concreting of Quirino Delta Bridge Access Road at Barangay Salimbao, Sultan Kudarat, Maguindanao
10. Repair and Rehabilitation of Ala River Flood Control, Channelization and Bank Protection, Sultan sa Barongis, Maguindanao 11. Repair of Raradangan Bridge

Funded 20M FY 2011 ARMM RIP No Funding

P 33.4885 M

P 50 M

11. Construction of Pingiuaman Bridge I, Lambayong, Sultan Kudarat

No Funding

P 40 M

12. Construction of Pingiuaman Bridge II, Lambayong, Sultan Kudarat 13. Construction of Sadsalan Bridge II, Lambayong, Sultan Kudarat 14. Construction of Drainage Canal at Barangay Buluan Creek, Phase V, Brgy. Buluan, Pigcawayan, Cotabato 15. Improvement/Rehabilitation of Malu-ao Guigeken Drainage Canal, Pigcawayan, Cotabato (Phase I) 16. Protection of Dike and Extension of Cut-Off Channel of Libungan River, Phase I (NIA) 17. Repair/Rehabilitation of Grebona Bridge at Banisilan, Alamada 18. Replacement of Quirino Bridge
19. Preparation of Master Plan for the Mindanao River Basin

No Funding Completed No Funding

P 20 M P 80 M P5M

Funded 15M FY 2011 No Funding Completed No Funding


On-going

P 20 M P 15 M P 35 M P 250
P 50 M

Thank you! God bless!


Presidential Task Force Mindanao River Basin Rehabilitation and Development NEDA XII Building, ARMM Compound, Cotabato City
Telefax: (064) 4214170 Email: ptfmrbrd@yahoo.com