Вы находитесь на странице: 1из 6

Project Cataluna-Tennis

PTP LINKPlanner Report 06 September 2010


Xavier Hasing Organisation: Phone: Email: CNEL Guayas-Los Rios 59342811475 xhasing@glr.cnel.ec

M
center = 02:05:12.7S 079:52:28.8W Catalua 4

kilometers

-2

-4 -4 -2 0 kilometers

Tennis 2 4

Page 1 of

Table of Contents
1. Project Summary 2. Catalua to Tennis Disclaimer 3 4 6

06 September 2010 LINKPlanner version 2.3.4

1. Project Summary

Project:

Cataluna-Tennis General Information

Customer Name Company Name Address Phone Cell Phone Email

Xavier Hasing CNEL Guayas-Los Rios Av. Leon Febres-Cordero Km 3.5 59342811475

xhasing@glr.cnel.ec

Network Map
center = 02:05:12.7S 079:52:28.8W Catalua 4

2 kilometers

-2

-4 -4 -2 0 kilometers

Tennis 2 4

Link name

Product

Local antenna Motorola Integrated Dual Polar Antenna

Remote antenna Motorola Integrated Dual Polar Antenna

Max aggregate IP throughput (Mbps)

Catalua to Tennis

PTP58600

26.75

Part Number BP5830BH-2 WB2907 WB3176

Qty Description 1 2 1 PTP 58600 Full Integrated - Link Complete LPU End Kit PTP400/600 (2 kits required per Link) 328 ft (100 m) Reel Outdoor Cooper Clad CAT5E (Recommended for PTP)

06 September 2010 LINKPlanner version 2.3.4

M
4 2 0

Catalua to Tennis
Equipment: Motorola PTP58600 Integrated Motorola Integrated Dual Polar Antenna @ 25 m
34 Catalua 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0.5 1

-2 -4 -4 -2 0 2 4

Motorola Integrated Dual Polar Antenna @ 24 m


Tennis

Height Above Sea Level (meters)

1.5

2.5

3.5 4 4.5 5 5.5 6 Range on path (kilometers)

6.5

7.5

8.5

Performance to Catalua Mean IP IP Availability 13.4 Mbps 99.99274 % for 1.0 Mbps

Performance to Tennis 13.4 Mbps 99.99274 % for 1.0 Mbps

Link Summary Link Length Band Regulation Modulation Bandwidth Total Path Loss 9.146 km 5.8 GHz ETSI Adaptive 30 MHz 137.08 dB System Gain System Gain Margin Mean Aggregate Data Rate Annual Link Availability Annual Link Unavailability 146.33 dB 9.25 dB 26.7 Mbps 99.99274 % 38.2 mins/year

06 September 2010 LINKPlanner version 2.3.4

Project Cataluna-Tennis - 2. Catalua to Tennis

Climatic Factors, Losses and Standards dN/dH not exceeded for 1% of time Area roughness 110x110km Geoclimatic factor Fade Occurrence Factor (Po) Path inclination 0.01% Rain rate Free Space Path Loss Gaseous Absorption Loss -137.63 N units/km 151.05 metre 3.96e-005 5.35e-004 0.28 mr 47.12 mm/hr 126.92 dB 0.11 dB Link Type Excess Path Loss Atmospheric Gasses Diffraction Loss Propagation Rain Rate Refractivity Index Non Line-of-Sight 10.05 dB ITU-R P.676-7, ITU-R P.835-4 ITU-R P.526-10 ITU-R P.530-12 ITU-R P.837-5 ITU-R P.453-9

Part Number BP5830BH-2 WB2907 WB3176

Qty Description 1 2 1 PTP 58600 Full Integrated - Link Complete LPU End Kit PTP400/600 (2 kits required per Link) 328 ft (100 m) Reel Outdoor Cooper Clad CAT5E (Recommended for PTP)

06 September 2010 LINKPlanner version 2.3.4

Disclaimer
Motorola Inc. assumes no responsibility for the accuracy of the information produced by the Motorola PTP LINKPlanner. Reference to products or services which are not provided by Motorola Inc. is for information purposes only and constitutes neither an endorsement nor a recommendation. All information provided by the Motorola PTP LINKPlanner is provided without warranty of any kind, either expressed or implied. MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective owners. Motorola, Inc. 2008

06 September 2010 LINKPlanner version 2.3.4

Вам также может понравиться