Future development of Electric Equipment Manufacturing: High Efficiency, Energy Saving, Environmental Protection

Contents
1. Capacity growth in the electric equipment manufacturing industry 2. Development of domestic thermal power generation technology 3. Development of combined cycle of Grade 9F gas turbine 4. Major breakthrough of 1000MW nuclear power generation technology 5. Progress of wind power generation equipment 6. IGCC the next industrialized objective

Development of power industry brings about the growth of equipment manufacturing sector

The power industry is of importance to the ation economy and people livelihood, s s eveloping rapidly in recent years. Generated energy up to 2,187B KWh in 2004 Generated energy up to 2,474.7B KWh in 2005 Stable and healthy development of the power industry has greatly promoted the growth of electric equipment manufacturing sector. The growth of the electric equipment manufacturing sector has in turn promoted the progress of power industry .

. Capacity growth annual output of three biggest electric equipment manufacturers in recent years 4KW 10 shanghai 2500 2000 1500 1000 500 0 01 02 03 04 05 Dongfang Harbin

Energy production

2. Thermal power generation technology - successful operation of 600MW supercritical gensets


Compared with 600MW subcritical gensets, 600MW supercritical gensets has an improved generating efficiency of 3% approximately, a reduction of 15g/Kwh of coal consumption. If calculated with the current coal price, a set of 600MW supercritical genset can save RMB 22.68M yuan/a approximately. Major parameters: Rated capacity: 600MW Heat consumption of steam turbine genset: 7535KJ/KWh Main steam exit pressure of boiler: 25.4MPa Main steam exit temperature of boiler: 571 Boiler efficiency: 93.55% Generator efficiency: 98.94%

2. Thermal power generation technology major technical breakthrough of 600MW supercritical gensets
2.1 Boiler Employment of the latest Low NOx Co-axial Firing System(LNCFS), water-cooling wall of spiral pipes in firing region of furnace, water-cooling wall of vertical pipes in flue region and series of high-temperature materials up to the requirement of supercritical gensets. 2.2 Steam turbine Employment of high-temperature materials up to the technical requirement of genstes; Employment of saber-type rotor for all reaction blades; Integrated selfprovided moving blades(ISB); Low pressure cylinder self-locked damping long blades(ILB), the ILB blade is 1,050mm long; Start control technology with bypass in cold state; Up to the design norm for steam clearance exciting-proof axis; A technology taking into account of axis stability and effects of steam exciting force; The full ternary dynamic technology has been promoted and applied in all circulating parts of high, medium and low pressure; Reliability of large capacity steam turbines and application of life-span technologies.

2. Thermal power generation technology major technical breakthrough in 600MW supercritical gensets
2.3 Steam generator A big amount of new materials and new structures at home and abroad have been employed to guaranty the quality of the product, such as the large insulated conical ring, the insulated hollow conductor, new mutual inductor of big current and stressresistant & corrosion-resistant 18Mn18Cr protection ring. 2.4 Auxiliary equipments The explosive and tube expanding technology for supercritical heater feeding with high-pressure (patent: manufacturing structure for combined heat transfer pipe and tube plate); build-up welding of transitional layer of low carbon steel is put forward based on study on high-pressure heater technology of increased seams between pipe connections and corrosion-proof measures, targeting at improving welding performances at the root, developing integrated oxygen deaerator successfully and reduce cost.

??a2? ??D??? ?? 41800 ??D??? ??D???

?? 4200

6500

4844 3250 1220 3250 4400

4750

2500

3000 3640 51830 2386


56440 636

4915

1613 1830 1613

2000

9140

4915

2770

14070

1000

2500

13970

General arrangement of boiler


B
??D??? ??D??? ??D??? ??D??? ?? 72800 ?? ?? ?? ?? 36000 '?????? 31000 2750 506 702

32910
3408

21020

Side view
I T P T V OD A D HT R T WB A D N 2a?? ? ? ? ? ? 1?2?? ' ? 3???? ? ???? ? ? ? ? ???? '' ????DT? ? ? '?? ? ?? 3?

??D'?o? ?y 26 2 2 65 2 24 42 96 14 y?
?? ?? 2100 ?? 4596 55850 591.4 4013.2 850 4013.2 3755 775.5 2217.6 2100 91 2
560 560 560

A
79025 2555.9

896 1759.1
0 EXP.

506 994 1752.6


57030

??3??
900 90 0
0 EXP.

1y?3??
7198 96 3 981 1752.6 1761 383.5

384 765 784 356

784 494 42730 1008 2911

?????
1008 1008 356 2430

812 591 356 2055

43340

51950 51520 52730

? ? ? 1 ? 72850 D D ???

?? 45000

?? 47600

?? 50400

??58500

2. Thermal power generation technology successful development of 1000MW super supercritical genset
Technical parameters of 1000MW super supercritical genset: Rated capacity 1000MW Main steam pressure of boiler 27.04MPa Main steam temperature 605 Reheating steam temperature 605 Steam turbine inlet pressure 26.05MPa Inlet temperature 600 Reheating temperature 600 Boiler efficiency 93.8% Steam genset heat consumption 7327kj/kwh(1750kcal/kwh) Generator efficiency 98.9%

2. Thermal power generation technology successful development of 1000MW super supercritical gensets
Yuhuan Genset is the first MW super supercritical thermal power genset in China with output of1000MW and major steam parameters 26.25MPa and 600 /600 Its pressure is higher than that of Japan. made and its temperature is higher than that of Europe-made. Technically, the successful R & D of Yuhuan Genset has achieved the spanning development with the single axis particularly. It has been up to the world advanced levels. By far, tenders have been opened for 16 MW super supercritical thermal power gensets in the country(4 for Yuhuan, 2 for Zouxian, 2 for Taizhou, 2 for Waigaoqiao, 2 for Haining, 2 for Beilungang and 2 for Beijiang), among which Shanghai Electric received orders for 12 steam gensets and 6 boilers.

2. Thermal power generation technology successful development of 600MW super supercritical gensets Sources of MW super supercritical technologies of three biggest electric equipment manufacturers:
Shanghai Harbin Dongfang

Steam turbine Siemens Mitsubishi Hitachi

Steam turbine genset Siemens Mitsubishi Hitachi

Boiler Altoms Mitsubishi Hitachi

Single-axis four-cylinder super supercritical turbosets jointly designed and manufactured by STC-SIEMENS

Sice view

General arrangement of boiler(end view)

2. Thermal power generation technology successful operation of 600MW subcritical air-cooled gensets
Main technical parameters of 600MW subcritical air-cooled genset: Inlet pressure of steam trubine Inlet temperature 16.7MPa 538

Shanghai Electric has advanced and mature technologies of 600MW subcritical air-cooled gensets. application records include the following: Jinjie, Daihai, Zhunda, Liulin, Zhangshan, Daqi

2. Thermal power generation technology successful development of 600MW supercritical air-cooled gensets
General structural features of 600MW supercritical air-cooled steam turbine Item Weight of high-medium pressure rotor Weight of low pressure rotor External dimensions of genset: length width height (including casing) Height of running level of genset Value 33.35t 98.3t

20.5 11.5 7.93m 13.7m

2. thermal generation technology successful development of 600MW supercritical air-cooled genset

Full ternary design has been employed for the circulated parts of 00MW supercritical air-cooled gas turbine up to the world dvanced levels.

2.Thermal power generation technology successful development of 600MW supercritical air-cooled genset
600MW supercritical air-cooled steam turbine employs materials of higher quality to meet the requirement of supercritical parameters

2. Thermal power generation technology - 300MW CFB Boiler CFB burning technology under
normal pressure is recognized as the best commercialized CCT internationally. Research on supercritical CFB started in 1997 internationally. The French Alstom completed its scenario study on 600MW supercritical CFB in 2000. The US FW issued its 300MW and 600MW supercritical CFB scenarios and feasibility study reports in 1999 and 2001 respectively. China started its initial study on key issues regarding supercritical CFB scenario design in 1999 with the same pace of the world. As the next generation CFB technology, Supercritical CFB holds the promise of breaking through 40% efficiency of power supply. Supercritical CFB is one of the CCT generation technologies that can be powerfully promoted in a mid and long-term.

2. Thermal power generation technology - 300MW CFB Boiler


China has rather good R & D basis in the category of CFB research. R & D should be sped up based on digesting and assimilating the imported 150MW and 300MW CFB technologies. Advantages can be better made use of when taking low rank coal as fuels. Strong points of CFB: burning of low rank coal and good characteristics of peak regulation. Focusing on research of 1) electricity supply efficiency of genset; 2) availability of genset

3. Combined cycle of gas turbine Records of Harbin, Dongfang and Shanghai


Harbin/GE(25) Zhangjiagang(3), Wangting(3), Qishuyan(3), Caojing(2), Lanzhou(2), Zhujiang(2), Zhenhai(2), Jinling(2), Taiyanggong(2), Jinjiang(4) Dongfang/Mitsubishi(16) Huizhou(3), Zhuhai(3), Eastern Shenzhen(3), Beijing No. 3 Thermal Plant(1), Jiangyou(2), Putian(4) Shanghai/Siemens(13) Shidongkou(3), Zhengzhou(2), Zhongyuan(2), Xiaoshan(2), Beijing No. 2 Thermal Plant(2), Xiamen(2)

3. Combine cycle of gas turbine technical parameters of Shanghai Electric made GT


GT type Grid frequency, Hz V64.3 50/60 V64.3A 50/60 1190 16.2 192 571 69 36.5 54 V84.2 60 1060 11 360 544 109 34 51.9 V84.3A 60 1230 16.9 457 582 185 38.8 57.7 V94.2 50 1060 11.1 519 540 159 34.5 52.3 V94.2A 50 1161 14 532 573 190 36.4 55.6 V94.3A 50 1230 16.9 659 582 268 39 57.7

Inlet temperature 1130 Pressure ratio Exhaust flow, kg/s Exhaust temperature, GT capacity, MW GT efficiency, % Combined cycle efficiency, % 16.1 192 531 62 35.2 53.2

3. Combined cycle of gas turbine Siemens transfers its complete gas turbine manufacturing technologies
Main machine and auxiliary system
Control and regulating Tender and marketing

Manufacturing and purchas Installation and test Site management

Operation and maintenance Spare parts and services

3. Combined cycle of gas turbine four stages of domestically made gas turbines

Start with easy things

and then handle difficult

things actively and stably.

Simultaneously develop

auxiliary machines and

main machines.

Deal with fixed parts first

and then rotating parts.

Deal with low temperature

parts and then high

temperature parts.

4. 1000MW nuclear power generation technology three biggest electric equipment manufacturers
Currently, technical assistance to the three biggest electric equipment manufacturers are respectively from the following: Shanghai -- Siemens Dongfang -- Alstom Harbin -- Mitsubishi The three biggest electric equipment manufacturers have all sped up their process of upgrading the nuclear power generation technology and equipments, investing large amount of capital in updating and expansion of workshops and equipments. The trend of nuclear power generation technology currently is safety, cost-saving, prolonged life-span, increased capacity and digitalized control.

5. Wind power generation technology initial industrial scale has taken shape

By the end of 2004, 43 wind generation farms have been established in China with installed capacity up to 764,000kW out of 1,292 gensets, taking the 10th place in the world and third place in Asia(after India and Japan). China has qualified itself for design and manufacturing low capacity wind gensets, equivalent to the standard of mid-nineties of 20th century. The first 1.2MW permanent-magnet wind genset, with independently developed IPR o China, has been officially completed and put into operation in Harbin Electromechanical Industry Co., Ltd. The contract for design and development of 2MW wind genset has been signed between Shanghai Electric-Power Generation Group and AERODYN of Germany, a wind genset with the biggest unit capacity imported or developed in China currently.

5. Wind power generation technology domestic design and manufacturing capacity unable to meet the market demand
Objective of installed wind power generation capacity in China is 5 million kW in 2010 and 30 million kW in 2020. Domestic design and manufacturing capacity canmeet the need of such a big market. t Technical difficulties include: a) Technically, transition from fixed propeller and speed to variable propeller and speed. b)unit capacity upgrading from 100 kW to MW The development of wind power generation must be assisted by the state. In accordance with the principle of importing, digesting, assimilating and independently developing as well as combining technology and business, China should be able to master the manufacturing technology of large MW wind power generation gensets. China should establish a stable domestic market first and then open up the international market.

6. IGCC the next objective of industrial development Integrated gasification combined cycle(IGCC) is a gas-steam combined cycle power generation technology using purified synthetic gas produced from gasification of multiple carbonbased fuels such as coal, biomass, petroleum coke and heavy residual oil. IGCC can not only solve the big issue of low efficiency and high pollution in coal-fired power stations currently to a great extent, but also make up the shortage of natural gas supply and its high price. From the point of view of systematic structure and equipment manufacturing, IGCC has carried forward and promoted almost all available technologies for thermal power systems at the moment.

6. IGCC the next objective of industrial development

6. IGCC the next objective of industrial development By 2005, nearly 30 IGCC power stations have been in operation or under construction worldwide with installed capacity over 8 million KW, among which half are established in the USA. The development of IGCC has entered a high-tide period internationally. But it is still a new technology in China.

Conclusions
both the power industry and electric equipment manufacturers have the common responsibility to realize efficient and safe utilization of energy and promote the sustainable development of economy and society. With the healthy development of power industry, great progress has been made in China in terms of super supercritical technology, gasburning technology and wind generation technology. However, it is a long-term and arduous task for the industry to further improve these electric equipments and technologies.