T-6-1
6.4 METHOD 1- SIMPLIFIED PROCEDURE (LOW-RISE, 60 FT) Height Adjustment factor = 1.00
-10.70G -15.40E -7.97H -10.51F
Fig 6-2
-10.70G -15.40E -6.80H -8.80F
-2.73D -4.92B
= 18.4
11.52C 17.27A
12.42345
8.50C 12.80A
H =37.6
150.919
492.126
TRANSVERSE ELEV.
12.80A 2a= 12.1ft
71.32 kips 3.9psf
LONGITUDINAL ELEV. 10 % of least dimension= 40 % of the eave height = 4 % of least dimension or 3 ft= therefore a = 15.1 ft 5.0 ft 6.0 ft 6.0 ft (6-1) 6.5.7 Fig 6-2 X X Fig 6-2 6.2
150.918635170604 ft 8.50C
Example: ps = KztIps30 Kzt = horizontal load at end zone ps30 = 1.00 12.8 1.00 1.00 12.80psf
11.52C
17.27A
FIGURE 6.2, Main Wind Force System Horizontal Loads End Zone Interior zone Wall (A) Roof (B) Wall (C ) Roof (D) 17.27 -4.92 11.52 -2.73 12.8 -6.7 8.5 -4
Transverse Longitudinal
Vertical Loads End Zone Interior zone WW (E) LW (F) WW (G) LW (H) -15.40 -10.51 -10.70 -7.97 -15.4 -8.8 -10.7 -6.8
* If roof pressure under horizontal loads is less than zero, use zero Plus and minus signs signify pressures acting toward and away from projected surfaces, respectively. For the design of the longitudinal MWFRS use = 0, and locate the zone E/F, G/H boundary at the mid-length of the building
FIGURE 6-3, COMPONENT AND CLADDING sq. ft, q= 18.4 Roof effective area = 30 Effective Area for wall element = 20 Sq. ft Interior Zone 1 = 9.45 -12.87 psf Wall, Interior Zone 4 = 13.90 -15.10 psf End Zone 2 = 9.45 -17.98 psf End Zone 5 = 13.90 -18.20 psf Conner Zone 3 = 9.45 -23.90 psf Roof Overhang effective area = 6 sq. ft Interior Zone 2 = -26.13 psf End Zone 3 = -36.71 psf IBC 1605.2.1(LRFD) U = 0.9D + 1.6W IBC 1605.3.1(ASD), U = 06D + W, increase in allowable shall not be used. IBC 1605.3.2(ASD), U = D + 1.3 W, allowable stress are permit to be increased.