Вы находитесь на странице: 1из 2

1884 - PHASE-2

HORSES OWNERS COMPLEX AT AL KHOR

CABLE CALCULATION FOR M.V.PANEL


S.NO

FROM

TO

1
2
3
4
5
6
7
8
9
10
11
12
13

M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL
M.V.PANEL

SMB-1
SMB-2
SMB-3
SMB-4

No.of
Parallel
Runs
1
1
1
1
1
1
1
1
1
1
1
1
1

CABLE SIZE

LENGTH OF THE
mv OF THE
CABLE IN METER
CABLE
WITH 10% SPARE
65
87
355
335
282
230
198
325
500
4
302
495
493

0.45
1.5
0.29
0.29
0.29
0.29
0.29
0.29
0.29
3.8
0.61
0.29
0.45

VD = (mv of
PERCENTAGE
LOAD IN
cable*L*Breaker
VOLTAGE DROP OF
KILOWATTS
Size)/No.of runs*1000
THE CABLE
4.68
5.22
30.89
29.15
24.53
20.01
17.23
28.28
9.14
0.61
7.37
28.71
17.75

1.13
1.26
7.44
7.02
5.91
4.82
4.15
6.81
2.20
0.15
1.78
6.92
4.28
TOTAL

QATAR DESIGN CONSORTIUM


DOHA, QATAR

83.45
11.85
137.15
132.55
141.85
132.55
136.25
164.40
21.45
4.80
9.30
120.00
29.00
1124.6

CABLE CALULATION

1884 - PHASE-2

HORSES OWNERS COMPLEX AT AL KHOR

ACTUAL BREAKER
RECOMMENDED
SIZE IN AMPERE (TP BREAKER SIZE IN
MCCB)
AMPERE (TP MCCB)
136.61
19.40
224.51
216.98
232.21
216.98
223.04
269.12
35.11
7.86
15.22
196.44
47.47

QATAR DESIGN CONSORTIUM


DOHA, QATAR

160
40
300
300
300
300
300
300
63
40
40
200
80

CABLE CALULATION

Вам также может понравиться