BILL Bill No.69 To, The Registrar, JNT University Kakinada, Kakinada. Name of the work: Providing of 12.

5 meters High Mast pole near Gandhi Statue in JNTU Kakinada. S.No Description of Work Qty 1. Supply and Delivery of 12.5 meters hexagonal 1no hot dipped galvanized steel 86 microns IS:2629/IR-7-Mast. The mast shall be two sections with bottom diameters of 340mm and top diameter of 150mm and suitable for wind velocity including double drum winch with motor, starter for motor, 6mm steel wire ropes, distributor assembly. Compensating disk, carriage ring suitable to fix 6 number 2* 400 watts metal halide laminators and control gear boxes. Head frame assembly, lightening arrester lighting arms, 2.5 sq mm. 3 core trailing cable with maintenance door of size 300*1000 mm etc. Complete of BP products/ Crompton make including cost of all material taxes and conveyance to work spot etc. Complete as directed by the Departmental Project Engineer. 2. Supply and Delivery of Integral Street Light 4no limners of 2* 400 watts Metal Halide Lamps, fittings comprises of single piece die cost Aluminum body with copper wound Ballst and Capacitor, igniter, with pot optics including 400 watts M.H.lamp of Crompton make including cost of all materials, taxes conveyance to work spot ect., complete Rate 1,93,830.00 Amount 1,93,830.00

18,935.00

75,740.00

3.

4.

Supply and delivery and erection of the control 1no box suitable size M.S.Sheet 14 swg 750*700*250mm size and powder coated, the box should be out door type. Dust and vermin proof and with concealed hinges and neopreme sponge gas cut including cost of all material with all taxes. Suitable 5 kv rating contract of L&T contractor member incomer M.C.B 63 amps H.R.C fuses L&T 3 members, Electronic timer. Supply and Delivery of X.L.P.E.P.V.C 16 sqmm 34r 4 core 11,000 volts U.G Armored Aluminum mt Cables of universals/ Fin Cab/ Poly Cab including cost of material and taxes conveyance etc. complete as per ss. Labors charges for laying of cable including earth work Excavation of Trench in hard ground soil, laying of UG cables upto 15sqmm and sand cushion covering the cable with brick and back filling of Trench duly providing route indicator embedded in c.c. including cost and conveyance of all materials and labor charges etc. complete as per ss. Supply and Delivery and run of 3 core 2.5sqmm p.v.c insulated copper wire fine cab. Supply and delivery 5 core 2.5 square mm copper flexible cable Providing independent earthlings for important equipment with 40mm dia b class 2.5mm long G.I pipe & 19mm dia b glass G.I.pipe of 0.3mm long connected with reducer providing G.I Funnel with mess enclose in C.C. chamber of 400* 400 mm with R.C.C slab cover duly providing staggered wholes. Filling with salt and chalk coal from the bottom of the pipe earth connectors from electrode through G.I. strip at 25* 6mm * 200mm length with all accessories and labor charges etc. complete 25r m

16,900.00

16,900.00

228 per meter

7,752.00

160 per Meter

4,000-00

6 7 8

50mt 78 per meter 16 1no 105.00 4,750-00

3,900-00 1,680.00 4,750-00

10

11

12

Earth work excavation in ordinary soil with in initial lead of 10m and an initial lift of 2m and charting the excavateral lead of 1km to low laying areas including all labor charges etc complete Providing cement concrete 1:2:6 mix by using 20mm size HVG metal including cost and conveyance of all materials, scenarize charges and all labor charges and all labor charges in position including centering, shuttering and curing of 21 days but excluding cost of steel etc. complete as per SS and as directed by the Project Engineer. Supply of HY.SD.FE 415 grade level steel including cost and conveyance to site and labor charges including cutting bending binding fabrication of reinforcement including cost of binding wire etc. complete as per SS and on directed by the Project Engineer Erection charges of 12.5 meters High Mast pole by using Crane including fixing of 2x400 watts MH luminors internal wring testing, commissioning, etc. complete including higher charges of crane and all labor charges etc complete as per instructions of Departmental Prroject Engineer.

1no

4,000-00

4,000-00

LS

18,930-00

18,930-00

LS

15,200-00

15,200-00

LS

23,300-00

23,300-00

Total (Three lacks sixty nine thousand nine hundred and eighty two rupees only)

3,69,982-00

QUOTATION To The Registrar, J NTU Kakinada, Kakinada. Sub: Providing Under Ground Cables for Library, University lawn Sl.No. Name of the Material Unit Cost per Unit 1 Supply of 35 Sq. mm 3.5 core XLPE PVC armored cable for 1 mt 383.80 library and university lawn 2 Supply and erection of all suitable sizes of lugs and etc LS 1,200-00 Labour charges laying of cable which includes earth 4 excavation, cost and embedding cable route indicators a)Labour charges for laying cable 1 mt 97-00 b)Cost and embedding cable route indicators LS 275-00 5 Panel board at university lawn LS 29,600-00 100amp mccb, 100amp buss bar, Timer, 40mx contact, 6amps MCB with indicator LED lamps (2) etc.

Terms &conditions: 1. The above rates are including erection and transportation. 2. AP Vat @ 14.5%, Excise duty @10.32% is extra. 3. 60 % advance at the time of work order.

QUOTATION To The Registrar, J NTU Kakinada, Kakinada. Sub: Providing Under Ground Cables for highmast poles at EEE, Principal Office and ECE Sl.No. Name of the Material Unit Cost per Unit 1 Supply of 16 Sq. mm 3.5 core XLPE PVC armored 1 mt. 249-50 cable for highmast poles at EEE, Principal office and ECE 2 Supply and erection of all suitable sizes of lugs and LS 1,100-00 etc Labour charges laying of cable which includes earth 4 excavation, cost and embedding cable route indicators a)Labour charges for laying cable 1 mt. 69-00 b)Cost and embedding cable route indicators LS 263-00 Terms &conditions: 1. The above rates are including erection and transportation. 2. AP Vat @ 14.5%, Excise duty @10.32% is extra. 3. 60 % advance at the time of work order.

QUOTATION To The Registrar, J NTU Kakinada, Kakinada. Sub: Providing Under Ground Cables for Central wing of Main building Sl.No. 1 Name of the Material Supply of 185 Sq. mm 3.5 core XLPE PVC armored cable from 250 Kva transformer Yard to Main building Supply of 35 Sq mm single core copper cable from panel board to busbar. Indicator lamps including run off the wiring from panel board to indication lamp board Supply and erection of all suitable sizes of lugs and etc Labour charges laying of cable which includes earth excavation, cost and embedding cable route indicators a)Labour charges for laying cable b)Cost and embedding cable route indicators Unit 1 mt Cost per Unit 1,320-00

2 3 4

1 mt LS LS

220-00 300-00 1,100-00

1 mt LS

98-00 260-00

Terms &conditions: 1. The above rates are including erection and transportation. 2. AP Vat @ 14.5%, Excise duty @10.32% is extra. 3. 60 % advance at the time of work order.

BILL Name of the work: Providing of 12.5 meters High Mast pole near physics, chemistry dept.,in JNTU Kakinada. S.No Description of Work Qty 1 Supply and delivery and erection of the control 1no box suitable size M.S.Sheet 14 swg 750*700*250mm size and powder coated, the box should be out door type. Dust and vermin proof and with concealed hinges and neopreme sponge gas cut including cost of all material with all taxes. Suitable 5 kv rating contract of L&T contractor member incomer M.C.B 63 amps H.R.C fuses L&T 3 members, Electronic timer. 2 Supply and Delivery of X.L.P.E.P.V.C 16 sqmm 38rmt 4 core 11,000 volts U.G Armored Aluminum Cables of universals/ Fin Cab/ Poly Cab including cost of material and taxes conveyance etc. complete as per ss. 3 Labors charges for laying of cable including earth work Excavation of Trench in hard ground soil, laying of UG cables upto 15sqmm and sand cushion covering the cable with brick and back filling of Trench duly providing route indicator embedded in c.c. including cost and conveyance of all materials and labor charges etc. complete as per ss. Providing independent earthlings for important equipment with 40mm dia b class 2.5mm long G.I pipe & 19mm dia b glass G.I.pipe of 0.3mm long connected with reducer providing G.I Funnel with mess enclose in C.C. chamber of 400* 400 mm with R.C.C slab cover duly providing staggered wholes. Filling with salt and chalk coal from the bottom of the pipe earth connectors from electrode through G.I. strip at 25* 6mm * 200mm length with all accessories and labor charges etc. complete Earth work excavation in ordinary soil with in initial lead of 10m and an initial lift of 2m and charting the excavateral lead of 1km to low laying areas including all labor charges etc complete Providing cement concrete 1:2:6 mix by using 20mm size HVG metal including cost and conveyance of all materials, scenarize charges and all labor charges and all labor charges in 25rm Rate 16,900.00 Amount 16,900.00

228 per meter

8,664.00

160 per Meter

4,000-00

1no

4,750-00

4,750-00

1no

4,000-00

4,000-00

LS

18,930-00

18,930-00

position including centering, shuttering and curing of 21 days but excluding cost of steel etc. complete as per SS and as directed by the Project Engineer. Supply of HY.SD.FE 415 grade level steel including cost and conveyance to site and labor charges including cutting bending binding fabrication of reinforcement including cost of binding wire etc. complete as per SS and on directed by the Project Engineer Erection charges of 12.5 meters High Mast pole by using Crane including fixing of 2x400 watts MH luminors internal wring testing, commissioning, etc. complete including higher charges of crane and all labor charges etc complete as per instructions of Departmental Project Engineer.

LS

15,200-00

15,200-00

LS

23,300-00

23,300-00

Total
(Ninety five thousand seven hundred and forty for rupees only)

95,744-00